Policy Replication

← Rulemakings

Pipeline Safety: Safety of Gas Transmission Pipelines, Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments

RIN 2137-AF39 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 73 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

9 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed rulenoneNo OIRA review
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2022-02-23 · 2 documents
Regulatory impact analysis5 files
Docket documents323 of 350 held1 docket; public comments not listed

Final rule stage: Federal Register documents (2)

Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments

Final rule2022-08-24 · FR 2022-17031 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 19 references, 8 linked to papers
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments

Final rule2022-10-25 · FR C1-2022-17031 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (2)

Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Technical Corrections; Response to Petitions for Reconsideration

Correction2023-04-24 · FR 2023-08548 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 2 references
Federal Register action: Final rule; technical corrections; response to petitions for reconsideration.
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Pipeline Safety: Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments: Corrections To Conform to Judicial Review

Correction2025-01-15 · FR 2025-00073 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Correcting amendments.
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Regulatory impact analyses (5)

For the final rule

Final Regulatory Impact Analysis (RIA)

RIA2022-08-26 · Regulatory impact analysis · PHMSA · 14 references, 5 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

2137 AF39 Final Regulatory Flexibility Analysis RIN 2

RIA2023-09-15 · Regulatory impact analysis · PHMSA · 6 references
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses

RIA2023-09-15 · Regulatory impact analysis · PHMSA · 15 references, 12 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010

RIA2023-09-15 · Regulatory impact analysis · PHMSA · 17 references, 6 linked to papers
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis

RIA2023-09-15 · Regulatory impact analysis · PHMSA
In this rulemaking because: RIN printed on the document (RIN 2137-AF39) · high confidence

Docket documents

PHMSA-2011-0023: 350 documents, 323 held · Analyses 7 (7 held), Correspondence 29 (29 held), Other 49 (24 held), Reports 247 (247 held), OIRA review record 3 (2 held), Rule documents 15 (14 held)

Gas Transmission Regulatory Impact Analysis

AnalysesHeld2019-10-02 · PHMSA-2011-0023-0466 · Supporting & Related Material · Analysis

Final RIA/RFA: Safety of Gas Gathering Pipelines

AnalysesHeld2021-11-14 · PHMSA-2011-0023-0488 · Supporting & Related Material · Report

Final Regulatory Impact Analysis (RIA)

AnalysesHeld2022-08-26 · PHMSA-2011-0023-0637 · Supporting & Related Material · Analysis

2137 AF39 Final Regulatory Flexibility Analysis RIN 2

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0665 · Other · Supplement (SUP)

EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0710 · Other · Summary (SUM)

U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0740 · Other · Supplement (SUP)

Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0743 · Other · Supplement (SUP)

OIRA reviews (1)

Final Rulereceived 2022-02-23, concluded 2022-07-13 · Consistent with Change