Policy Replication

← Rulemakings

Pipeline Safety: Safety of Gas Gathering Pipelines

RIN 2137-AF38 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 28 references in its rule and RIA documents

A rulemaking follows one regulatory action through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. Each document says why it is in this rulemaking and how sure that link is.

Complete Every stage OIRA reviewed is here.

4 documents in this rulemaking.
Pre-rulenoneNo OIRA review
Proposed rulenoneNo OIRA review
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 2021-09-01 · 1 document
Regulatory impact analysis1 file
Docket documents323 of 350 held1 docket; public comments not listed

Final rule stage: Federal Register documents (1)

Pipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments

Final rule2021-11-15 · FR 2021-24240 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration · 20 references, 1 linked to papers
Federal Register action: Final rule.
In this rulemaking because: RIN printed on the document (RIN 2137-AF38) · high confidence

Other Federal Register notices (corrections, delays, withdrawals) (2)

Pipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments: Response to a Petition for Reconsideration; Technical Corrections; Issuance of Limited Enforcement Discretion

Correction2022-05-04 · FR 2022-09474 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Final rule; response to petition for reconsideration; enforcement discretion; technical corrections.
In this rulemaking because: RIN printed on the document (RIN 2137-AF38) · high confidence

Pipeline Safety: Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments: Technical Corrections

Correction2022-06-13 · FR 2022-12722 · DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration
Federal Register action: Final rule; technical corrections.
In this rulemaking because: RIN printed on the document (RIN 2137-AF38) · high confidence

Regulatory impact analyses (1)

For the final rule

Final RIA/RFA: Safety of Gas Gathering Pipelines

RIA2021-11-14 · Regulatory impact analysis · PHMSA · 8 references
In this rulemaking because: RIN printed on the document (RIN 2137-AF38) · high confidence

Docket documents

PHMSA-2011-0023: 350 documents, 323 held · Analyses 7 (7 held), Correspondence 29 (29 held), Other 49 (24 held), Reports 247 (247 held), OIRA review record 3 (2 held), Rule documents 15 (14 held)

Gas Transmission Regulatory Impact Analysis

AnalysesHeld2019-10-02 · PHMSA-2011-0023-0466 · Supporting & Related Material · Analysis

Final RIA/RFA: Safety of Gas Gathering Pipelines

AnalysesHeld2021-11-14 · PHMSA-2011-0023-0488 · Supporting & Related Material · Report

Final Regulatory Impact Analysis (RIA)

AnalysesHeld2022-08-26 · PHMSA-2011-0023-0637 · Supporting & Related Material · Analysis

2137 AF39 Final Regulatory Flexibility Analysis RIN 2

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0665 · Other · Supplement (SUP)

EPA. Whitepaper on Valuing Methane Emissions Changes in Regulatory Benefit Cost Analysis Peer Review Charge Questions and Responses

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0710 · Other · Summary (SUM)

U.S. Department of Transportation Departmental Guidance on Valuation of a Statistical Life in Economic Analysis

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0740 · Other · Supplement (SUP)

Jack Faucett Assoc. Application of Safety Regulation to Rural Onshore Hazardous Liquid Low Stress Pipelines Vlume II Regulatory Analysis May 11 2010

AnalysesHeld2023-09-15 · PHMSA-2011-0023-0743 · Other · Supplement (SUP)

OIRA reviews (1)

Final Rulereceived 2021-09-01, concluded 2021-11-01 · Consistent with Change