Policy Replication

← Rules by RIN

National Pollutant Discharge Elimination System: Regulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges

RIN 2040-AC82 · ENVIRONMENTAL PROTECTION AGENCY · Econ. significant · 383 references in its rule and RIA documents

A RIN follows one rulemaking through all its stages. A stage often has several Federal Register documents (the proposal itself, comment-period extensions, meeting notices, supplemental proposals, corrections), the regulatory impact analysis can be several files for each of the proposed and final rule, and an agency may keep more than one docket. A final rule published under a different RIN, or with no RIN, shows here only once it has been matched.

Pre-rulenoneNo OIRA review
Proposed ruleheldOIRA review 1997-08-01 · 2 documents
Interim final rulenoneNo OIRA review
Final ruleheldOIRA review 1999-07-06 · 2 documents
Regulatory impact analysis1 file2 rule documents with an RIA section
Docket documents2 of 9 held1 docket; public comments not listed

Proposed rule stage: Federal Register documents (2)

National Pollutant Discharge Elimination SystemProposed Regulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges

Proposed rule (NPRM)1998-01-09 · FR 98-180 · ENVIRONMENTAL PROTECTION AGENCY · 38 references, 18 linked to papers · RIA in rule text (19,856 characters)
Federal Register action: Proposed rule.

Modification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

Proposed rule (NPRM)2002-12-30 · FR 02-32984 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Proposed rule.

Final rule stage: Federal Register documents (2)

National Pollutant Discharge Elimination SystemRegulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges

Final rule1999-12-08 · FR 99-29181 · Revision of the Water Pollution Control Program Addressing Storm Water; ENVIRONMENTAL PROTECTION AGENCY · 38 references, 10 linked to papers · RIA in rule text (30,799 characters)
Federal Register action: Final rule.

Modification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

Final rule2003-03-10 · FR 03-5708 · ENVIRONMENTAL PROTECTION AGENCY
Federal Register action: Final rule.

Regulatory impact analyses (1)

For the final rule

Economic Analysis of the Final Phase II Storm Water Rule

RIA1999-01-01 · Regulatory impact analysis · EPA · 307 references, 54 linked to papers
Linked to this RIN by matching, not by a RIN printed on the document.

Docket documents

EPA-HQ-OW-2002-0053: 9 documents, 2 held · Other 7, OIRA review record 1 (1 held), Rule documents 1 (1 held)

Agency Information Collection Activities: Submission for OMB Review; Comment Request; NPDES Storm Water Program Phase II

OIRA review recordHeld · EPA-HQ-OW-2002-0053-0001 · Notice · Federal Register Document

National Pollutant Discharge Elimination System - Proposed Regulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges [W-97-12-I-A.1.a]

Rule documents2025-07-24 · EPA-HQ-OW-2002-0053-0012 · Proposed Rule · FR 98-180

OIRA reviews (2)

Proposed Rulereceived 1997-08-01, concluded 1997-12-12 · Consistent with change · econ. significant
Final Rulereceived 1999-07-06, concluded 1999-10-15 · Consistent with change · econ. significant