Policy Replication

Modification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

Federal Register2003-03-10 · ENVIRONMENTAL PROTECTION AGENCY · Rule · 03-5708
Final rule.

Today's action postpones until March 10, 2005, the requirement to obtain National Pollutant Discharge Elimination System (NPDES) storm water permit for oil and gas construction activity that disturbs one to five acres of land. On December 8, 1999 (64 FR 68722), the U.S. Environmental Protection Agency (EPA) published a final rule expanding the then-existing NPDES permitting program to require permit coverage by March 10, 2003 for, among other things, construction sites that disturb one to five acres. As part of that rulemaking, EPA assumed that few, if any, oil and gas exploration, production, processing, or treatment operations or transmission facilities would be affected by the rule. Since rule promulgation, EPA has become aware that close to 30,000 oil and gas sites per year may be affected by the December 8, 1999, storm water regulations. The two-year postponement of the deadline from March 10, 2003, to March 10, 2005, will allow time for EPA to analyze and better evaluate: the impact of the permit requirements on the oil and gas industry; the appropriate best management practices for preventing contamination of storm water runoff resulting from construction associated with oil and gas exploration, production, processing, or treatment operations or transmission facilities; and the scope and effect of 33 U.S.C. 1342 (l)(2) and other storm water provisions of the Clean Water Act.

RIN 2040-AC82

Other documents for the same rulemaking

Docket documentAgency Information Collection Activities: Submission for OMB Review; Comment Request; NPDES Storm Water Program Phase II
1998-01-09 Federal RegisterNational Pollutant Discharge Elimination SystemProposed Regulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges
1999-01-01 Regulatory impact analysisEconomic Analysis of the Final Phase II Storm Water Rule
1999-12-08 Federal RegisterNational Pollutant Discharge Elimination SystemRegulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges
2002-12-30 Federal RegisterModification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

References

No references to show.