An Analysis of the Navy’s 2025 Shipbuilding Plan
Cited in 11 places in policy documents
The Navy's New Battleship Program: Costs and Implications for the Shipbuilding Industrial Base
Congressional Budget Office, An Analysis of the Navy’s 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
Aircraft carriers do not carry missiles, unlike surface combatants and most submarines, but they have an air wing composed of several dozen aircraft that can fly hundreds of sorties over days or weeks to launch bombs and missiles. For several years, the Navy has been developing a new class of destroyer called the DDG(X).6 That ship was intended to have some of the same capabilities as the BBGN, but its full-load displacement would have been about 14,500 tons, or less than half that of the battleship.
The Navy’s New Battleship Program: Costs and Implications for the Shipbuilding Industrial Base
Congressional Budget Office, An Analysis of the Navy’s 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
Aircraft carriers do not carry missiles, unlike surface combatants and most submarines, but they have an air wing composed of several dozen aircraft that can fly hundreds of sorties over days or weeks to launch bombs and missiles. For several years, the Navy has been developing a new class of destroyer called the DDG(X).6 That ship was intended to have some of the same capabilities as the BBGN, but its full-load displacement would have been about 14,500 tons, or less than half that of the battleship.
Increasing the Size and Missile Capability of the Navy’s Fleet Within the Next Five Years
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), p. 12, www.cbo.gov/publication/60732
By contrast, increasing the number of "offensive missile shooters" (ships or vessels that can fire offensive weapons at other ships or land targets) could be done relatively quickly (if the Navy chose to do so) and is a goal that fits well with the Navy's operating concept of distributed maritime operations. By 2030, under the Navy's 2025 shipbuilding plan, the total number of missile cells and missile-carrying ships would increase slightly.2 The number of large and small missile cells on surface ships would increase to about 8,300, but the number on submarines would fall to less than 700, primarily because of the retirement of 2.
Testimony on Challenges Facing the Navy’s and Coast Guard’s Shipbuilding Programs and the Shipbuilding Industrial Base
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), p. 16, www.cbo.gov/publication/60732.
Over the past decade, major Navy and Coast Guard programs have experienced substantial cost growth. Under the 2025 shipbuilding plan (which covers 2025 to 2054), the Navy budgeted more than $10 billion in costto-complete funding for shipbuilding.1 Cost-to-complete amounts are the additional funding a shipbuilding program needs to pay for cost growth in ships that were already authorized and fully funded by Congress in prior years.
Testimony on Challenges Facing the Navy's and Coast Guard's Shipbuilding Programs and the Shipbuilding Industrial Base
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), p. 16, www.cbo.gov/publication/60732.
Over the past decade, major Navy and Coast Guard programs have experienced substantial cost growth. Under the 2025 shipbuilding plan (which covers 2025 to 2054), the Navy budgeted more than $10 billion in costto-complete funding for shipbuilding.1 Cost-to-complete amounts are the additional funding a shipbuilding program needs to pay for cost growth in ships that were already authorized and fully funded by Congress in prior years.
Transparency at CBO: Plans for 2026 and a Review of 2025
An Analysis of the Navy's 2025 Shipbuilding Plan
Maintenance Delays for Conventional Navy Ships
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
The realized durations of overhauls exceeded 1.
Maintenance Delays for Conventional Navy Ships
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
Delays in maintenance or repairs, however, can reduce the Navy's operational readiness and the number of ships the Navy can put to sea. The Congressional Budget Office analyzed the duration of maintenance events and the amount of labor they used for four types of large conventional combat ships: Arleigh Burke class guided missile destroyers (DDG-51s), amphibious assault ships (LHDs), amphibious transport docks (LPDs), and dock landing ships (LSDs; see Figure 1-1).1 Zumwalt class guided missile destroyers (DDG-1000s) and the newest class of amphibious assault ships (LHAs) were not included in the analysis because there were few maintenance events for those ships in the data. CBO found that from 2011 to 2024, delays in maintenance events were common among all the classes of ships it examined, and those delays did not get smaller over time.
Testimony on the Navy’s 2025 Shipbuilding Plan and Its Implications for the Shipbuilding Industrial Base
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732
3, https://tinyurl.com/37bkemd9.
How CBO Supports the Congress
An Analysis of the Navy's 2025 Shipbuilding Plan
The 2025 Outlook for Navy Shipbuilding
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.