Maintenance Delays for Conventional Navy Ships
Original sourceWeb page (49 KB)PDF (1.8 MB)Data file (6.3 MB)
References: 22 extracted, 3 linked to papers
Congressional Budget Office, The Capacity of the Navy's Shipyards to Maintain Its Submarines (March 2021), www.cbo.gov/publication/57026.
Congressional Budget Office, Costs of Submarine Maintenance at Public and Private Shipyards (April 2019), www.cbo.gov/publication/55032.
Naval Sea Systems Command, Technical Foundation Paper for DDG 51 Class Type Commander Notionals (February 2012).
Government Accountability Office, Navy Ship Maintenance: Evaluating Pilot Program Outcomes Could Inform Decisions to Address Persistent Schedule Challenges, GAO-20-370 (May 2020), p. 28, www.gao.gov/products/gao-20-370.
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
The realized durations of overhauls exceeded 1.
Ronald O'Rourke, Navy DDG-51 and DDG1000 Destroyer Programs: Background and Issues for Congress, Report RL32109, version 284 (Congressional Research Service, December 5, 2025), www.congress.gov/crs-product/RL32109.
Navy LPD-17 Flight II and LHA Amphibious Ship Programs: Background and Issues for Congress, Report R43543, version 150 (Congressional Research Service, March 21, 2025), www.congress.gov/crs-product/R43543.
Justin Katz, "U.S. Navy to Extend Service Lives of 12 Destroyers," Breaking Defense (October 31, 2024), https://tinyurl.com/4ezuf8u5.
Robert W. Button and others, Assessment of Surface Ship Maintenance Requirements (RAND Corporation, 2015), pp. 1–57, www.rand.org/pubs/research_reports/RR1155.html.
Megan Eckstein, "GAO: Navy Seeing Improvements in Surface Ship Maintenance Costs, but Schedule Is Still an Issue," USNI News (May 13, 2020), https://tinyurl.com/y2wrdpvu.
Government Accountability Office, Navy Ship Maintenance: Action Needed to Maximize New Contracting Strategy's Potential Benefits, GAO-17-54 (November 2016), www.gao.gov/products/gao-17-54.
Government Accountability Office, Shipbuilding and Repair: Navy Needs a Strategic Approach for Private Sector Industrial Base Investments, GAO-25-106286 (February 2025), www.gao.gov/products/gao-25-106286.
Gary Robbins, "Struggling for Contracts, BAE Systems Cuts More Jobs at San Diego Shipyard in Big Downturn," San Diego Union-Tribune (updated March 1, 2024), https://tinyurl.com/hhkpbp8f.
Government Accountability Office, Navy Ship Maintenance: Actions Needed to Monitor and Address the Performance of Intermediate Maintenance Periods, GAO-22-104510 (February 2022), www.gao.gov/products/gao-22-104510.
Navy Maintenance: Persistent and Substantial Ship and Submarine Maintenance Delays Hinder Efforts to Rebuild Readiness, GAO-20-257T (December 2019), www.gao.gov/products/gao-20-257t.
Megan Eckstein, "Seeking 75 Ships Ready for Combat, Navy Turns to New Readiness Orgs," Defense News (January 9, 2024), https://tinyurl.com/3s3h44zd.
Gidget Fuentes, "SWO Boss: 75-Warship Readiness Goal Remains a Work in Progress," USNI News (updated August 14, 2024), https://tinyurl.com/2cxa8ay5.
Geoff Ziezulewicz, "Fleet's Material Condition Keeps Getting Worse, New INSURV Report Says," Navy Times (June 2, 2023), https://tinyurl.com/5n7r9bty.
Department of the Navy, Board of Inspection and Survey, INSURV Annual Report (March 1, 2023), https://tinyurl.com/4mx8ppsh.
Edward G. Keating and Elvira N. Loredo, Valuing Programmed Depot Maintenance Speed: An Analysis of F-15 PDM (RAND Corporation, 2006), www.rand.org/pubs/technical_reports/TR377.html.
CBO computed the average cost per day by dividing the lifetime cost of a destroyer, including the costs for its procurement, crews, and operation and maintenance, by the amount of time Navy planners had expected the destroyer to be available for operations in its class plan.15 Because the Navy has chosen to pay those costs to procure its DDG-51s and keep them operating (and is currently choosing to purchase additional destroyers at higher cost), the value to the Navy of a destroyer's availability must be at least as large as that computed cost per day.
Jeffrey M. Wooldridge, Econometric Analysis of Cross-Section and Panel Data, 2nd ed. (MIT Press, 2010), Chapter 22.
G. S. Maddala, Introduction to Econometrics, 2nd ed. (Prentice Hall, 1992), p. 328.