Policy Replication

Maintenance Delays for Conventional Navy Ships

CBO report2025-12-10 · CBO · Report · 61940

References: 22 extracted, 3 linked to papers

Page 1Download these results: CSV · JSON
Congressional Budget Office, The Capacity of the Navy's Shipyards to Maintain Its Submarines (March 2021), www.cbo.gov/publication/57026.
research reportNot linked to a paper · Notes About This Report
Congressional Budget Office, Costs of Submarine Maintenance at Public and Private Shipyards (April 2019), www.cbo.gov/publication/55032.
research reportNot linked to a paper · fn 2
Government Accountability Office, Navy Ship Maintenance: Evaluating Pilot Program Outcomes Could Inform Decisions to Address Persistent Schedule Challenges, GAO-20-370 (May 2020), p. 28, www.gao.gov/products/gao-20-370.
government reportNot linked to a paper · fn 4
Naval Sea Systems Command, Technical Foundation Paper for DDG 51 Class Type Commander Notionals (February 2012).
government reportNot linked to a paper · fn 3
Congressional Budget Office, An Analysis of the Navy's 2025 Shipbuilding Plan (January 2025), www.cbo.gov/publication/60732.
Delays in maintenance or repairs, however, can reduce the Navy's operational readiness and the number of ships the Navy can put to sea. The Congressional Budget Office analyzed the duration of maintenance events and the amount of labor they used for four types of large conventional combat ships: Arleigh Burke class guided missile destroyers (DDG-51s), amphibious assault ships (LHDs), amphibious transport docks (LPDs), and dock landing ships (LSDs; see Figure 1-1).1 Zumwalt class guided missile destroyers (DDG-1000s) and the newest class of amphibious assault ships (LHAs) were not included in the analysis because there were few maintenance events for those ships in the data. CBO found that from 2011 to 2024, delays in maintenance events were common among all the classes of ships it examined, and those delays did not get smaller over time.
Ronald O'Rourke, Navy DDG-51 and DDG1000 Destroyer Programs: Background and Issues for Congress, Report RL32109, version 284 (Congressional Research Service, December 5, 2025), www.congress.gov/crs-product/RL32109.
research reportNot linked to a paper · Chapter 1 fn 1
Navy LPD-17 Flight II and LHA Amphibious Ship Programs: Background and Issues for Congress, Report R43543, version 150 (Congressional Research Service, March 21, 2025), www.congress.gov/crs-product/R43543.
research reportNot linked to a paper · Chapter 1 fn 1
Justin Katz, "U.S. Navy to Extend Service Lives of 12 Destroyers," Breaking Defense (October 31, 2024), https://tinyurl.com/4ezuf8u5.
newsNot linked to a paper · Chapter 2 fn 3 · cited link
Robert W. Button and others, Assessment of Surface Ship Maintenance Requirements (RAND Corporation, 2015), pp. 1–57, www.rand.org/pubs/research_reports/RR1155.html.
In a 2015 report, the RAND Corporation found that the Navy's funding for DDG-51s' maintenance and modernization activities fell short of the amounts recommended by engineers in the class plans.5 5.
Government Accountability Office, Navy Ship Maintenance: Action Needed to Maximize New Contracting Strategy's Potential Benefits, GAO-17-54 (November 2016), www.gao.gov/products/gao-17-54.
government reportNot linked to a paper · Chapter 3 fn 6
Megan Eckstein, "GAO: Navy Seeing Improvements in Surface Ship Maintenance Costs, but Schedule Is Still an Issue," USNI News (May 13, 2020), https://tinyurl.com/y2wrdpvu.
newsNot linked to a paper · Chapter 3 fn 7 · cited link
Government Accountability Office, Shipbuilding and Repair: Navy Needs a Strategic Approach for Private Sector Industrial Base Investments, GAO-25-106286 (February 2025), www.gao.gov/products/gao-25-106286.
government reportNot linked to a paper · Chapter 3 fn 9
Gary Robbins, "Struggling for Contracts, BAE Systems Cuts More Jobs at San Diego Shipyard in Big Downturn," San Diego Union-Tribune (updated March 1, 2024), https://tinyurl.com/hhkpbp8f.
newsNot linked to a paper · Chapter 3 fn 9 · cited link
Government Accountability Office, Navy Ship Maintenance: Actions Needed to Monitor and Address the Performance of Intermediate Maintenance Periods, GAO-22-104510 (February 2022), www.gao.gov/products/gao-22-104510.
government reportNot linked to a paper · Chapter 3 fn 10
Navy Maintenance: Persistent and Substantial Ship and Submarine Maintenance Delays Hinder Efforts to Rebuild Readiness, GAO-20-257T (December 2019), www.gao.gov/products/gao-20-257t.
government reportNot linked to a paper · Chapter 3 fn 10
Megan Eckstein, "Seeking 75 Ships Ready for Combat, Navy Turns to New Readiness Orgs," Defense News (January 9, 2024), https://tinyurl.com/3s3h44zd.
newsNot linked to a paper · Chapter 3 fn 11 · cited link
Gidget Fuentes, "SWO Boss: 75-Warship Readiness Goal Remains a Work in Progress," USNI News (updated August 14, 2024), https://tinyurl.com/2cxa8ay5.
newsNot linked to a paper · Chapter 3 fn 13 · cited link
Geoff Ziezulewicz, "Fleet's Material Condition Keeps Getting Worse, New INSURV Report Says," Navy Times (June 2, 2023), https://tinyurl.com/5n7r9bty.
newsNot linked to a paper · Chapter 3 fn 14 · cited link
Department of the Navy, Board of Inspection and Survey, INSURV Annual Report (March 1, 2023), https://tinyurl.com/4mx8ppsh.
government reportNot linked to a paper · Chapter 3 fn 14 · cited link
Edward G. Keating and Elvira N. Loredo, Valuing Programmed Depot Maintenance Speed: An Analysis of F-15 PDM (RAND Corporation, 2006), www.rand.org/pubs/technical_reports/TR377.html.
CBO computed the average cost per day by dividing the lifetime cost of a destroyer, including the costs for its procurement, crews, and operation and maintenance, by the amount of time Navy planners had expected the destroyer to be available for operations in its class plan.15 Because the Navy has chosen to pay those costs to procure its DDG-51s and keep them operating (and is currently choosing to purchase additional destroyers at higher cost), the value to the Navy of a destroyer's availability must be at least as large as that computed cost per day.
Jeffrey M. Wooldridge, Econometric Analysis of Cross-Section and Panel Data, 2nd ed. (MIT Press, 2010), Chapter 22.
bookNot linked to a paper · Appendix C fn 1
G. S. Maddala, Introduction to Econometrics, 2nd ed. (Prentice Hall, 1992), p. 328.
bookNot linked to a paper · Appendix C fn 4