The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure
Open-access copyPublisher page (DOI)OpenAlex record
Cited in 34 places in policy documents
Implementation of Electric Vehicle Charging Infrastructure Programs: CFI and NEVI
Eric Wood et al., The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure, NREL/TP-5400-85654, National Renewable Energy Laboratory (NREL; now National Laboratory of the Rockies), June 2023, p. 36, https://docs.nrel.gov/docs/fy23osti/85654.pdf.
EPA 420-R-24-004 - LMDV RIA (Mar 2024)
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure." National Renewable Energy Laboratory. Accessed December 18, 2023. https://www.nrel.gov/docs/fy23osti/85654.pdf.
EPA 420-R-24-004 - LMDV RIA (Mar 2024)
Wood, Eric, Brennan Borlaug, Matt Moniot, Dong-Yeon Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO USA: National Renewable Energy Laboratory.
RIA cited in FR 2025-14572: Reconsideration of 2009 Endangerment Finding and Greenhouse Gas Vehicle Standards
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure." National Renewable Energy Laboratory.
Regulatory Impact Analysis - Greenhouse Gas Emissions Standards for Heavy-Duty Vehicles: Phase 3
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” 2023.
1152,1153 In response to comments received and to reflect more recent literature, we are updating the cost ranges for 150 kW and 350 kW EVSE in the NPRM to those from a 2023 NREL report (Wood et al. 2023), 1154 which estimated combined hardware and installation costs to range from $112,200$196,200 per
Regulatory Impact Analysis - Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure." National Renewable Energy Laboratory. Accessed December 18, 2023. https://www.nrel.gov/docs/fy23osti/85654.pdf.
Adapted from Wood et al. (2023) with permission............................................................................................................................
Regulatory Impact Analysis - Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” 2023.
Adapted from Wood et al. (2023) with permission............................................................................................................................
EPA-2024-Model Years 2027 and later RIA
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure." National Renewable Energy Laboratory. Accessed December 18, 2023. https://www.nrel.gov/docs/fy23osti/85654.pdf.
EPA-2024-Model Years 2027 and later RIA
E. Wood, B. Borlaug, et al. 2023 (cited) (The 2030 National Charging Network).
RIA Section 3 - Compliance Costs Emissions and Energy Impacts Final - IPM Documentation
Wood, Eric, Brennan Borlaug, Matt Moniot, Dong-Yeon Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO USA: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy23osti/85654.pdf.
Greenhouse Gas Emissions Standards for Heavy-Duty Vehicles-Phase 3
Wood, Eric et al. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," 2023.
After reviewing new information on EVSE costs provided in comments as well as literature released since the publication of the NPRM, we determined it was appropriate to increase the underlying hardware and installation cost ranges we considered for DCFC-150 kW and DCFC-350 kW based on a new NREL study issued in 2023 to reflect the most up-to-date information available.\644\ After further consideration, including consideration of comments on this issue and availability of a new DOE analysis \645\ of the average value of the 30C tax credit for HD charging infrastructure, we have updated the depot EVSE costs in our final rule analysis to reflect a quantitative assessment of average savings from the tax credit. --------------------------------------------------------------------------- ---------------------------------------------------------------------------
2024-03-13 EO 12866 EPA RIA passback
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” 2023. Available online: https://driveelectric.gov/files/2030-charging-network.pdf.
2024-03-14 EO 12866 EPA Preamble and RIA passback
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure,” 2023. Available at: https://driveelectric.gov/files/2030-charging-network.pdf.
2024-03-14 EO 12866 EPA Preamble and RIA passback
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” 2023. Available online: https://driveelectric.gov/files/2030-charging-network.pdf.
2024-03-14 EO 12866 OMB Preamble and RIA passback
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure,” 2023. Available at: https://driveelectric.gov/files/2030-charging-network.pdf.
2024-03-14 EO 12866 OMB Preamble and RIA passback
Wood et al. 2023 (NREL report updating EVSE cost ranges)
Greenhouse Gas Emissions Standards for Heavy-Duty Vehicles: Phase 3 - Regulatory Impact Analysis
Wood, Eric et al. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” 2023. Available online: https://driveelectric.gov/files/2030-charging-network.pdf.
Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
Wood et al., “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Infrastructure,” 2023.
2023) estimated that to support 33 million PEVs in 2030, about 1.25 million public EVSE ports (including 182,000 DC fast charging (DCFC) ports) would be needed, along with 26.8 million private ports (most at single family homes, but also at multi-family homes and workplaces).\884\ That yields a ratio of one public EVSE port needed per 26 PEVs.
Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” National Renewable Energy Laboratory.
A recent national assessment by NREL (Wood et al. 2023) estimated that to support 33 million PEVs in 2030, about 1.25 million public EVSE ports (including 182,000 DC fast charging (DCFC) ports) would be needed, along with 26.8 million private ports (most at single family homes, but also at multi-family homes and workplaces).\884\ That yields a ratio of one public EVSE port needed per 26 PEVs.
Documents supporting the RIA and Preamble from Jung
The 2030 National Charging Network, Golden, CO: National Renewable Energy Laboratory, NREL/TP-5400-85654, 2023
Documents supporting the RIA and Preamble from Jung
E. Wood, B. Borlaug, M. Moniot, D-Y Lee, Y. Ge, F. Yang, and A. Liu, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure, NREL Technical Report 85654, June 2023, https://www.nrel.gov/docs/fy23osti/85654.pdf.
Documents supporting the RIA and Preamble from Jung
Eric Wood, et al. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-85654. https://www.nrel.gov/docs/fy23osti/85654.pdf
Documents supporting the RIA and Preamble from Jung
Wood et al. (2023). The 2030 National Charging Network
Final RIA, Preamble, Regs, and RTC
Wood et al., “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Infrastructure,” 2023. Accessed December 18, 2023, at https://driveelectric.gov/files/2030-charging-network.pdf.
Final RIA, Preamble, Regs, and RTC
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” National Renewable Energy Laboratory. Accessed December 18, 2023. https://www.nrel.gov/docs/fy23osti/85654.pdf.
Final RIA, Preamble, Regs, and RTC
U.S. Department of Energy, National Renewable Energy Laboratory, “The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure.” June 2023. https://driveelectric.gov/files/2030-charging-network.pdf.
Final RIA, Preamble, Regs, and RTC
U.S. Department of Energy, National Renew-able Energy Laboratory, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure (June 2023). https://driveelectric.gov/files/2030-charging-network.pdf.
Final RIA, Preamble, Regs, and RTC
“The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure,” National Renewable Energy Laboratory, (June 2023) https://driveelectric.gov/files/2030-charging-network.pdf
Final RIA, Preamble, Regs, and RTC
Wood et al., "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Infrastructure," 2023. Accessed December 18, 2023, at https://driveelectric.gov/files/2030-charging-network.pdf.
Final RIA, Preamble, Regs, and RTC
Wood, Eric, Brennan Borlaug, et al. 2023 The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. NREL
Copyrighted Documents Supporting the Preamble and RIA from Burke
National Renewable Energy Laboratory (NREL), "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure," 27 June 2023.
SAN-8953-RIN-2060-AV49-LMDV-2027-RIA-FRM-Final-03142024
Wood, Eric, Brennan Borlaug, Matt Moniot, D-Y Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. "The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure." National Renewable Energy Laboratory. Accessed December 18, 2023. https://www.nrel.gov/docs/fy23osti/85654.pdf.
SAN-8953-RIN-2060-AV49-LMDV-2027-RIA-FRM-Final-03142024
E. Wood, B. Borlaug, K. McKenna, J. Keen, B. Liu, J. Sun, D. Narang, et al. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO USA: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy23osti/85654.pdf.
SAN-8953-RIN-2060-AV49-LMDV-2027-RIA-FRM-Final-03142024
Wood, Eric, Brennan Borlaug, Matt Moniot, Dong-Yeon Lee, Yanbo Ge, Fan Yang, and Zhaocai Liu. 2023. The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. Golden, CO USA: National Renewable Energy Laboratory. https://www.nrel.gov/docs/fy23osti/85654.pdf.