Documents supporting the RIA and Preamble from Jung
Regulatory impact analysis2024-04-18 · EPA · regulatory_impact_analysis · EPA-HQ-OAR-2022-0829-5731
Original sourceAttachment (124 KB)Attachment (209 KB)Attachment (218 KB)Attachment (115 KB)Attachment (97 KB)Attachment (419 KB)Attachment (1.2 MB)Attachment (50 KB)Attachment (295 KB)Attachment (959 KB)Attachment (227 KB)Attachment (3.4 MB)Attachment (6.9 MB)Attachment (1.4 MB)Attachment (196 KB)Attachment (375 KB)Attachment (89 KB)Attachment (84 KB)Attachment (139 KB)Attachment (184 KB)Attachment (1.4 MB)Attachment (232 KB)Attachment (1.8 MB)Attachment (3.8 MB)Attachment (797 KB)Attachment (3.9 MB)Attachment (386 KB)Attachment (941 KB)Attachment (1.1 MB)Attachment (380 KB)Attachment (543 KB)Attachment (10.2 MB)Attachment (403 KB)Attachment (312 KB)Attachment (390 KB)Attachment (754 KB)Attachment (805 KB)Attachment (4.6 MB)Attachment (795 KB)Attachment (1.5 MB)
Other documents for the same rulemaking
References: 1,981 extracted, 329 linked to papers
Page 1Download these results: CSV · JSON
2008 US DOE Workshop on the Role of Residential AC in Contributing to Fault-Induced Delayed Voltage Recovery (FIDVR)
IPCC Assessment Report 6 – Working Group I – Climate Change 2021: The Physical Science Basis
research reportNot linked to a paper · Nearest section heading: "Extreme Weather" (NASA section near top)
IPCC Assessment Report 6 – Working Group II – Climate Change 2022: Impacts, Adaptation and Vulnerability
research reportNot linked to a paper · Nearest section heading: "Extreme Weather" (NASA section near top)
IPCC Assessment Report 6 – Working Group III – Climate Change 2022: Mitigation of Climate Change
research reportNot linked to a paper · Nearest section heading: "Extreme Weather" (NASA section near top)
NASA Global Climate Change - Mitigation and Adaptation
web pageNot linked to a paper · Nearest section heading: "Extreme Weather" (NASA section near top)
NASA Global Climate Change - Extreme Makeover: Human Activities Are Making Some Extreme Events More Frequent or Intense
web pageNot linked to a paper · Nearest section heading: "Extreme Weather" (NASA section near top)
PG&E Currents | PG&E Proposes Two Energy Storage Projects for Oakland Clean Energy Initiative to CPUC - By Paul Doherty (4.15.20)
Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection (Queued Up 2022)
Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection (Queued Up 2023)
Interconnection Cost Analysis in the MISO Territory (Oct. 2022) - Joachim Seel et al., Lawrence Berkeley National Laboratory
Interconnection Cost Analysis in the NYISO Territory (2023) - Julia Mulvaney Kemp et al., Lawrence Berkeley National Laboratory
Interconnection Cost Analysis in the PJM Territory (2023) - Joachim Seel et al., Lawrence Berkeley National Laboratory
Unlocking the Queue with Grid Enhancing Technologies
research reportNot linked to a paper · Nearest section heading: II. Overall Need for Reform
Rod Walton, MISO Introduces New Generation Interconnection Online Tool, Power and Engineering (May 19, 2020), at https://www.power-eng.com/om/miso-introduces-new-generation-interconnection-online-tool/#gref.
National Renewable Energy Laboratory, Advanced Hosting Capacity Analysis, https://www.nrel.gov/solar/market-research-analysis/advanced-hosting-capacity-analysis.html
Central Hudson Gas & Electric Corp., Solar PV Hosting Capacity Map, https://www.cenhud.com/en/my-energy/distributed-generation/solar-pv-hc-map/
FERC Form 715 (transmission planning data submissions)
National Glossary of Terms Used in NERC Reliability Standards, https://www.nerc.com/pa/Stand/Glossary%20of%20Terms/Glossary_of_Terms.pdf
PJM Manual 14A
research reportNot linked to a paper · Section III.A.2.o
Queued Up 2023
research reportNot linked to a paper · fn 1894; supra Section II.C (pp. 623-624, 626)
Queued Up 2022
research reportNot linked to a paper · supra Section II.C (pp. 656-657)
MISO, Informational Report Regarding Interconnection Study Delay for 4th Quarter 2022, Docket No. ER19-1960-004, attach. A (filed Feb. 14, 2023)
government reportNot linked to a paper · P 1016 (fn 1999)
Queued Up 2023 at 18.
research reportNot linked to a paper · III.C.1.iii. Commission Determination
Joe Daniel & Sam Gomberg, Union of Concerned Scientists, Why Does Wind Energy Get Wasted? (Nov. 16, 2021), https://www.ucsusa.org/resources/wind-oversupply-myths
Jay Caspary and Jesse Schneider, Grid Strategies, LLC, Opportunities to Use Advanced Conductors to Accelerate Grid Decarbonization, at 9 (Feb. 2022), https://acore.org/wp-content/uploads/2022/03/Advanced_Conductors_to_Accelerate_Grid_Decarbonization.pdf
MISO, Business Practice Manual-15, tbl. 6-1
otherNot linked to a paper · Operating Assumptions for Interconnection Studies (comments section)
PJM Manual 14B at 47, section 2.3.1.1
otherNot linked to a paper · Comments on Specific Proposal re: study parameters (comments section)
Jay Caspary and Jesse Schneider, Grid Strategies, LLC, Opportunities to Use Advanced Conductors to Accelerate Grid Decarbonization, at 2 (Feb. 2022), https://acore.org/wp-content/uploads/2022/03/Advanced Conductors to Accelerate Grid Decarbonization.pdf
Reliability Guideline: BPS-Connected Inverter-Based Resource Performance, at vii, https://www.nerc.com/comm/RSTC_Reliability_Guidelines/InverterBased_Resource_Performance_Guideline.pdf.
California ISO, Electromagnetic Transient Modeling Requirements (Apr. 14, 2021), http://www.caiso.com/Documents/CaliforniaISOElectromagneticTransientModelingRequirements.pdf.
Summary of the Joint Generator Interconnection Workshop, at 28 (Aug. 9-11, 2022), https://www.esig.energy/wp-content/uploads/2022/10/Joint-Generator-Workshop-Summary-1.pdf (Generator Interconnection Workshop Summary).
Fast Frequency Response Concepts and Bulk Power System Reliability Needs, https://www.nerc.com/comm/PC/InverterBased%20Resource%20Performance%20Task%20Force%20IRPT/Fast_Frequency_Response_Concepts_and_BPS_Reliability_Needs_White_Paper.pdf at 7.
IEEE Standard 2800-2022
otherNot linked to a paper · fn 3210
IEEE Standard 1547-2018
otherNot linked to a paper · fn 3210
San Fernando Disturbance, at vi (Nov. 2020), https://www.nerc.com/pa/rrm/ea/Documents/San_Fernando_Disturbance_Report.pdf
NERC and CAISO, Multiple Solar PV Disturbances in CAISO (Apr. 2022), https://www.nerc.com/pa/rrm/ea/Documents/NERC_2021_California_Solar_PV_Disturbances_Report.pdf
Odessa Disturbance (Sept. 2021) https://www.nerc.com/pa/rrm/ea/Documents/Odessa_Disturbance_Report.pdf
http://www.caiso.com/Documents/FERC845_InterconnectionStudyStatistics.pdf (CAISO)
https://cdn.misoenergy.org/MISO%20Generator%20Interconnection%20Study%20Metrics%20Q1%202023444684.pdf (MISO)
https://www.oasis.oati.com/isne/ (ISO-NE)
https://www.nyiso.com/interconnections (NYISO)
https://www.pjm.com//media/planning/services-requests/interconnection-study-statistics.ashx (PJM)
https://www.oasis.oati.com/SOCO/index.html (Alabama Power Company (Southern Company))
https://www.oasis.oati.com/azps/ (Arizona Public Service)
https://www.oasis.oati.com/avat/ (Avista Corp.)
https://www.blackhillscorp.com/utilities-businesses/transmission/electric-transmission-services (Black Hills Colorado / Black Hills Power)
http://www.oatioasis.com/CLPT/index.html (Cheyenne Light, Fuel, and Power Co.)
https://www.oasis.oati.com/dgt/index.html (Deseret Generation and Transmission Coop.)
https://www.oasis.oati.com/SCEG/ (Dominion Energy South Carolina)
http://www.oasis.oati.com/duk/index.html (Duke Energy Carolinas)