Policy Replication

RIA Section 3 - Compliance Costs Emissions and Energy Impacts Final - IPM Documentation

Regulatory impact analysis2024-05-09 · EPA · regulatory_impact_analysis · EPA-HQ-OAR-2023-0072-8396
RIN 2060-AV71, RIN 2060-AV09 · Docket EPA-HQ-OAR-2023-0072

Other documents for the same rulemaking

2022-06-10 Regulatory impact analysisRegulatory Impact Analysis for the Proposed National Emission Standards for Hazardous Air Pollutants: Gasoline Distribution Technology Review and Standards of Performance for Bulk Gasoline Terminals Review
2022-06-10 Regulatory impact analysisRIA Support Citations
2022-06-10 Docket documentGas Distribution Passback #2 for OMB
2022-06-10 Docket documentGas Distribution Passback #2 for OMB
2022-06-10 Docket documentGas Distribution Passback for OMB
2022-06-10 Docket documentEO 12866 Passback #1 - Gasoline Distribution & Bulk Gas (2060-AU97)
2022-06-10 Docket documentGas Distribution Package Submission to OMB
2022-06-10 Docket documentRedline of 40 CFR Part 63, Subpart R, Showing Proposed Amendments
2022-06-10 Docket documentRedline of 40 CFR Part 63, Subpart BBBBBB, Showing Proposed Amendments
2022-06-10 Docket documentRedline of 40 CFR Part 60, Subpart XX, Showing Proposed Amendments
2023-01-01 Regulatory impact analysisHON/ Synthetic Organic Chemical Manufacturing Industry NESHAP, Proposal
2023-01-01 Regulatory impact analysisNew Source Performance Standards for Greenhouse Gas Emissions from New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions from Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule, Proposal
2023-04-25 Regulatory impact analysisEPA’s 2016 Technical Guidance for Assessing Environmental Justice in Regulatory Analysis. See https://www.epa.gov/environmentaljustice/technical-guidance-assessing-environmental-justice-regulatory-analysis
2023-04-25 Federal RegisterNew Source Performance Standards for the Synthetic Organic Chemical Manufacturing Industry and National Emission Standards for Hazardous Air Pollutants for the Synthetic Organic Chemical Manufacturing Industry and Group I & II Polymers and Resins Industry
2023-04-26 Regulatory impact analysisRegulatory Impact Analysis for the New Source Performance Standards for the Synthetic Organic Chemical Manufacturing Industry and National Emission Standards for Hazardous Air Pollutants for the Synthetic Organic Chemical Manufacturing Industry and Group I & II Polymers and Resins Industry
2023-04-26 Docket documentDocumentation of OMB Review Under Executive Order 12866
2023-05-23 Regulatory impact analysisMemo-RIA Chapter 11 NSPS
2023-05-23 Regulatory impact analysisMemo - RIA Chapter 4 - Part 1 of 2
2023-05-23 Regulatory impact analysisMemo - RIA Chapter 5
2023-05-23 Regulatory impact analysisRegulatory Impact Analysis
2023-05-23 Regulatory impact analysisPlace Holder Memo-RIA Chpt.10
2023-05-23 Regulatory impact analysisMemo - RIA Chapter 6
2023-05-23 Docket documentProposed Subpart UUUUb Regulatory Text
2023-05-23 Docket documentProposed Subpart UUUUa Regulatory Text
2023-05-23 Docket documentProposed Subpart TTTT Regulatory Text
2023-05-23 Docket documentProposed Subpart TTTTa Regulatory Text
2023-05-23 Federal RegisterNew Source Performance Standards for Greenhouse Gas Emissions From New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule
2023-05-24 Regulatory impact analysisRIA Appendix B - Economy-wide Social Costs and Economic Impacts
2023-05-24 Regulatory impact analysisMemo - RIA Chapter 4 - Part 2 of 2
2023-05-24 Regulatory impact analysisMemo - RIA Chapter 11 Existing Source
2023-05-24 Regulatory impact analysisMemo - RIA Chapter 10
2023-05-24 Docket documentEO 12866 Interagency Review. OMB Correspondence
2023-05-25 Regulatory impact analysisRIA Section 4 - Benefits Analysis
2023-05-25 Regulatory impact analysisRIA Section 4 Climate Benefits Calculations
2023-05-25 Regulatory impact analysisRIA Appendix C - Assessment of Potential Costs and Emissions Impacts
2023-05-25 Regulatory impact analysisMemo - RIA Chapter 9
2023-05-25 Regulatory impact analysisRIA Section 8 - Impacts
2023-05-25 Regulatory impact analysisRIA Appendix A - Air Quality Modeling
2023-05-26 Regulatory impact analysisRIA Section 3 - Cost Emissions and Energy Impacts
2023-06-07 Regulatory impact analysisRIA Section 6 - Environmental Justice Impacts
2023-06-16 Federal RegisterNew Source Performance Standards for Greenhouse Gas Emissions From New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule
2023-07-07 Docket documentE.O. 12866 OMB Interagency Review-March 15, 2023: Submission of Files for OMB Review. Primary Document - Draft Preamble. 22 Attachments (Other Review Documents)
2023-08-25 Docket documentList of EO 12866 Meetings
2023-11-20 Regulatory impact analysisInitial Regulatory Flexibility Analysis (IRFA)
2023-11-20 Docket documentEO 12866 Interagency Review. OMB Correspondence
2023-11-20 Docket documentList of EO 12866 Meetings
2023-11-20 Federal RegisterNew Source Performance Standards for Greenhouse Gas Emissions From New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule
2024-01-01 Regulatory impact analysisHON/ Synthetic Organic Chemical Manufacturing Industry NESHAP, Final
2024-01-01 Regulatory impact analysisNew Source Performance Standards for Greenhouse Gas Emissions from New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions from Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule, Final
2024-05-08 Regulatory impact analysisRegulatory Impact Analysis for the Final National Emission Standards for Hazardous Air Pollutants: Gasoline Distribution Technology Review and Standards of Performance for Bulk Gasoline Terminals Review
2024-05-08 Regulatory impact analysisAdditional RIA Support Citations
2024-05-08 Regulatory impact analysisRIA cited in FR 2024-04629: National Emission Standards for Hazardous Air Pollutants: Gasoline Distribution Technology Reviews and New Source Performance Standards Review for Bulk Gasoline Terminals
2024-05-08 Docket documentRedline of 40 CFR Part 63, Subpart BBBBBB, Showing Final Amendments
2024-05-08 Docket documentRedline of 40 CFR Part 63, Subpart R, Showing Final Amendments
2024-05-08 Docket documentRedline of 40 CFR Part 60, Subpart XX, Showing Final Amendments
2024-05-08 Docket documentDocumentation of OMB Review Under Executive Order 12866
2024-05-09 Regulatory impact analysisRIA Section 5 - Social Costs and Economic Impacts Final
2024-05-09 Regulatory impact analysisRIA Section 4 - Health Benefits Analysis Final
2024-05-09 Regulatory impact analysisRegulatory Impact Analysis, Final
2024-05-09 Regulatory impact analysisRIA Section 3 - Compliance Costs Emissions and Energy Impacts Final - IPM Runs

References: 219 extracted, 11 linked to papers

Page 1Download these results: CSV · JSON
U.S. EPA, Peer Review Handbook (U.S. EPA, 2006)
government reportNot linked to a paper · 1.2 Review and Ongoing Improvement of the Integrated Planning Model
https://www.epa.gov/power-sector-modeling/ipm-peer-reviews
web pageNot linked to a paper · 1.2 Review and Ongoing Improvement of the Integrated Planning Model · cited link
Annual Energy Outlook (AEO) 2023
government reportNot linked to a paper · 1.1 Executive Summary; multiple sections · cited link
NREL ATB 2023
research reportNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case · cited link
GeoCAT 2.0 model
otherNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case
FICO Xpress Optimization Suite 8.8.0
otherNot linked to a paper · 2.4 Hardware and Programming Features · cited link
ICF’s North American Natural Gas Systems Analysis (NANGAS) model
otherNot linked to a paper · 1.2 Review and Ongoing Improvement of the Integrated Planning Model
OMEGA model
otherNot linked to a paper · 1.1 Executive Summary; Attachment 3-1
MOVES model
government reportNot linked to a paper · 1.1 Executive Summary; Attachment 3-1 · cited link
EIA Form 860
datasetNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case · cited link
EIA Form 860M
datasetNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case · cited link
AMPD 2019
datasetNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case · cited link
FERC Form 714
datasetNot linked to a paper · 2.3.5 Load Duration Curves (LDCs); 3.2.4 Regional Load Shapes · cited link
EIA Form 861
datasetNot linked to a paper · 3.2.1 Distributed Solar Photovoltaics · cited link
NERC 2022 Long-Term Reliability Assessment (NERC LTRA 2022)
research reportNot linked to a paper · Table 1-1 Key Updates and Specifications in the EPA 2023 Reference Case; 3.1 Model Regions · cited link
NERC ES&D 2022
research reportNot linked to a paper · 3.2.3 Net Internal Demand (Peak Demand)
ISO New England, 2020 Economic Study: Draft Scope of Work and High-Level Assumptions for Production Simulations - Part II of III, June 17, 2020
research reportNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
ISO New England, Forward Capacity Auction 17 Transmission Transfer Capabilities & Capacity Zone Development, April 28, 2022
research reportNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
Manitoba Hydro, Transmission Interface Capability Report, May 19, 2022
research reportNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
New York State Reliability Council, LLC, New York Control Area Installed Capacity Requirement for the Period May 2023 to April 2024, Appendices, December 9, 2022
research reportNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
PJM 2022 RTEP Base Assumptions
research reportNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
PJM Real Time transfer limits
web pageNot linked to a paper · 3.3.1 Inter-regional Transmission Capability
PJM, 2024/2025 RPM Base Residual Auction Planning Period Parameters
web pageNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
WECC 2022 Western Assessment of Resource Adequacy Report and associated Topology Maps
research reportNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
WECC 2016 Power Supply Assessment
research reportNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
AESO Information Document ATC and Transfer Path Management ID #2011-001R
research reportNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
Nova Scotia Power Transmission System Operating Limits 2022
research reportNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
Atlantic Energy Gateway Transmission Modeling Study Report
research reportNot linked to a paper · Section 3.3 (Transmission TTC) fn ix
NREL’s Jobs and Economic Development Impact (JEDI) model
datasetNot linked to a paper · Section 3.3.5 (New Transmission Builds)
EIA Form 411 datasets (2015-2018)
datasetNot linked to a paper · Section 3.3.5 (New Transmission Builds) fn 22
AEO 2023 Reference Case
government reportNot linked to a paper · Table 3-6 International Imports; multiple sections
National Electrical Energy Data System (NEEDS)
datasetNot linked to a paper · Section 3.5 and Chapter 4 (NEEDS)
NERC Generating Availability Data System (GADS) 2017-2021
datasetNot linked to a paper · Section 3.5.1 (Availability)
Denholm, Paul, Yinong Sun, and Trieu Mai. 2019. An Introduction to Grid Services: Concepts, Technical Requirements, and Provision from Wind. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-72578. https://www.nrel.gov/docs/fy19osti/72578.pdf.
Western Wind and Solar Integration Study (WWSIS) Phase 1, National Renewable Energy Laboratory (GE Energy), May 2010
research reportWestern Wind and Solar Integration Study (2010) · Section 3.7.1 Operating Reserve Requirements fn 24
Analysis of Wind Generation Impact on ERCOT Ancillary Services Requirements, Electric Reliability Council of Texas (GE Energy), March 2008
research reportNot linked to a paper · Section 3.7.1 Operating Reserve Requirements fn 25
Cole, W. et al., Operating Reserves in Long-term Planning Models (NREL), June 2018
research reportOperating Reserves in Long-Term Planning Models (2018) · Section 3.7.1 Operating Reserve Requirements fn 26
EIA Form 923
datasetNot linked to a paper · Section 3.5.2 (Capacity Factor) and multiple places
EIA Form 860 (January 2023 EIA Form 860 monthly and 2021 annual release); Form 860M
datasetNot linked to a paper · Chapter 4 (NEEDS) Table 4-1
Emission Tracking System (ETS) database (2019 and 2022)
datasetNot linked to a paper · Chapter 4 (NEEDS) Table 4-1
EIA Electric Generator Capacity data (EIA Form 860M), January 2023
datasetNot linked to a paper · Section 4.2.1 (Population of Existing Units)
Transmission Projects: At a Glance (EEI), 2016
research reportNot linked to a paper · Section 3.3.5 fn 22
University of Texas at Austin, Energy Institute. New U.S. Power Costs: by County, with Environmental Externalities, July 2016
research reportNot linked to a paper · Section 4.4.4 (Regional Cost Adjustment)
NREL Annual Technology Baseline (ATB) 2023 (used for wind, solar PV, battery storage cost/performance)
research reportNot linked to a paper · Section 4.4.5 (Renewable cost/performance)
NREL Annual Technology Baseline (ATB) 2019 (geothermal assumptions)
research reportNot linked to a paper · Section 4.4.5 (Geothermal)
EPA Technical Development Document for the Final Section 316(b) Existing Facilities Rule: Chapter 8.7, https://www.epa.gov/sites/production/files/2015-04/documents/cooling-water_phase-4_tdd_2014.pdf
government reportNot linked to a paper · Section 3.10.6 Cooling Water Intakes (316(b)) Rule · cited link
FERC Form 1 data (used via SNL and ICF analyses)
datasetNot linked to a paper · Section 4.2.7 (FOM derivation)
AEO 2019
government reportNot linked to a paper · Table 4-46; Landfill Gas Electricity Generation
AEO 2023
government reportNot linked to a paper · 6.1; Table 6-1; Cost and performance assumptions for potential units and CCS
EIA 860 (2018)
datasetNot linked to a paper · 5.1 Sulfur Dioxide Control Technologies - Scrubbers; default removal rates
Next →