Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 27Download these results: CSV · JSON
USGS topographic map (Figure 1)
datasetNot linked to a paper · Factory Shoals Douglas Hill - Lincoln Property Co - Logistics Warehouse (near "A Site Location Map is depicted on a USGS topographic map (Figure 1).")
Grading & Drainage; Factory Shoals Road, prepared by Urban Engineers, Incorporated, dated June 18, 2018
research reportNot linked to a paper · Factory Shoals Douglas Hill - Lincoln Property Co - Logistics Warehouse ("project plans entitled ¿Grading & Drainage; Factory Shoals Road¿, prepared by Urban Engineers, Incorporated, dated June 18, 2018.")
Oak Hill Subdivision, Phase I prepared by Bolt Engineering Incorporated, dated October 24, 2018
research reportNot linked to a paper · Oak Hill Subdivision (Phase I) ("project plans entitled ¿Oak Hill Subdivision, Phase I¿ prepared by Bolt Engineering Incorporated, dated October 24, 2018")
Oak Hill Subdivision, Phase II prepared by Bolt Engineering Incorporated, dated March 15, 2020
research reportNot linked to a paper · Oak Hill Subdivision (Phase II) ("project plans entitled ¿Oak Hill Subdivision, Phase II¿ prepared by Bolt Engineering Incorporated, dated March 15, 2020")
New Elementary School #12, Houston County, prepared by Roberston Loia Roof, dated March 25, 2019
research reportNot linked to a paper · Houston County Elementary School #12 ("project plans entitled ¿New Elementary School #12, Houston County¿, prepared by Roberston Loia Roof, dated March 25, 2019")
Indian River Transport prepared by Lanier Engineering Incorporated, dated January 24, 2098
research reportNot linked to a paper · Indian River Transport Truck Terminal ("project plans entitled ¿Indian River Transport¿ prepared by Lanier Engineering Incorporated, dated January 24, 2098")
EDGES (EDGES keys)
web pageNot linked to a paper · Various entries (multiple references to "EDGES", "EDGES keys", e.g. Logan's Walk, Satilla Manufacturing Site, Milton Overlook)
IPaC / iPaC (referred to as IPAC or iPaC)
web pageNot linked to a paper · Multiple entries (references to "IPAC", "iPaC", e.g. Logan's Walk, Wills Park-The City of Alpharetta)
"Proposed Passing Siding at Armstrong" prepared by LJA Rall, LLC, dated March 5, 2019
otherNot linked to a paper · SAS-2019-00267 (Armstrong Siding project)
The exhibit submitted in the application by Ecological Solutions entitled, "Jurisdictional Findings", dated April 2019
research reportNot linked to a paper · SAS-2019-00291 (Georgia Power Fiber Optic Cable Replacement)
UFC 3-260-01 "safety criteria for airfield design"
government reportNot linked to a paper · SAS-2019-00459 (Moody AFB Airfield)
IPaC (Information for Planning and Consultation)
web pageNot linked to a paper · multiple project entries (e.g., SAS-2019-00258, SAS-2019-00333) · cited link
EDGES (USFWS/Corps species determination keys)
web pageNot linked to a paper · multiple project entries (e.g., SAS-2019-00265, SAS-2019-00440)
U.S. Fish and Wildlife Service (FWS) Information for Planning and Consultation (IPaC) list of Endangered and Threatened Species
web pageNot linked to a paper · multiple entries (e.g., SAS-2019-00886, SAS-2020-00381) · cited link
Corrective Action Plan that was approved by EPD on December 5, 2019
research reportNot linked to a paper · SAS-2020-00029 (Gilliam Fulton Industrial Site)
Savannah Harbor Expansion Project (SHEP) Environmental Impact Statement (EIS).
government reportNot linked to a paper · SAS-2021-00372
Demolition Plan and Sedimentation and Erosion and Sedimentation Control Plan Final Phase, as prepared by Atkins North America, Inc., dated April 30, 2021.
research reportNot linked to a paper · SAS-2021-00394
Impact Plan (Overall), prepared by Applied Environmental Science, Inc., dated July 6, 2021.
research reportNot linked to a paper · SAS-2021-00602
Grading and Drainage Plan and Profile for: South Macon Bloomfield Structure #25A, dated July, 2021.
research reportNot linked to a paper · SAS-2021-00430
Biological Assesment for the Micaville Wastewater Treatment Plant and Collection System dated January 17, 2014
research reportNot linked to a paper · SAW-2010-00378 (East Yancey Water and Sewer District)
Addendum to the Mitigation Plan dated January 2012
research reportNot linked to a paper · SAW-2010-00142 (Pancho Mitigation Bank)
Mitigation Plan dated March 2012
research reportNot linked to a paper · SAW-2010-00142 (Pancho Mitigation Bank)
Mitigation Banking Instrument
otherNot linked to a paper · SAW-2010-00142 (Pancho Mitigation Bank)
letter by Mr. Chad Kimes, PE dated February 8, 2010, work plan drawings (7) dated revised February 8, 2010, and (1) dated October 13, 2009 entitled 'Disposal Area'
research reportNot linked to a paper · SAW-2010-00011 (Melvin Sheppard / Sandy Ridge Island Oak Subdivisons)
RIVET (River Mouth and Inlet Departmental Research Initiative
research reportNot linked to a paper · SAW-2011-01892
Duke Energy Carolinas, LLC Nantahala Hydroelectric Project FERC #2692 Species Management Plan for Virginia Spiraea (Spiraea virginiana), dated February 2013
government reportNot linked to a paper · SAW-2013-01661
NC Wildlife Resources Commission letter, dated December 16, 2011
government reportNot linked to a paper · SAW-2013-01723
Notice of Violation issued by the NCDENR-Division of Water Resources dated August 19, 2013
government reportNot linked to a paper · SAW-2013-01646
Memorandum of Understanding (MOU) among the U.S. Department of Agriculture, The U.S. Environmental Protection Agency and the U.S. Department of the Army concerning Implementation of the 404(f)(1)(A) Exemptions for Certain Agricultural Conservation Practice Standards, signed on March 25, 2014.
government reportNot linked to a paper · SAW-2014-01238 (near the Anderson, Charles/UT to Cranberry Creek Restoration Project entry)
U.S. Fish and Wildlife Service’s Intra-Service Section 7 Biological Evaluation (dated and signed April 1, 2014)
government reportNot linked to a paper · SAW-2014-01290 (Tom Kelly Farm Savannah Creek Restoration; referenced in Special Condition(s))
Final approved Compensatory Mitigation Plan dated July 10, 2019
otherNot linked to a paper · SAW-2015-02235
National Land Cover Dataset (NLCD) estimated that 7.697% of the watershed (HUC 03050103) consisted of impervious surfaces in 2011.
datasetNot linked to a paper · SAW-2017-01564
Scientific literature cited by the USEPA Office of Water Recovery in their 09/01/2011 dated Recovery Potential Metrics Summary Form for watershed percent impervious cover
web pageNot linked to a paper · SAW-2017-01564
This modification is based upon documents submitted to the Corps by Stantec, Inc., dated November 27, 2017.
research reportNot linked to a paper · SAW-2017-01388
Natural Resources Conservation Service (NRCS) Environmental Quality Incentives Program (EQIP)
web pageNot linked to a paper · SAW-2017-01388
U.S. Fish and Wildlife Service’s Manatee Guidelines ... The guidelines can be found at http://www.fws.gov/nc-es/mammal/manatee_guidelines.pdf
web pageNot linked to a paper · near SAW-2019-01080 (Edward and Rachel Cozart section) · cited link
Natural Resources Conservation Services’ (NRCS) Environmental Quality Incentive Program
web pageNot linked to a paper · near SAW-2019-01039 (Mock Property Stream restoration / NRCS EQIP mention)
North Carolina Wetland Assessment Method (NC WAM)
research reportNot linked to a paper · fn: Medline Distribution Center paragraph (SAW-2019-01848)
Natural Resources Conservation Services’ (NRCS) Environmental Quality Incentive Program (EQIP)
government reportNot linked to a paper · fn: Mahshie Site Stream Restoration paragraph (SAW-2019-01931)
50 year EIS management plan / Bogue Banks Master Beach Nourishment Plan (BBMBNP)
government reportNot linked to a paper · fn: Bogue Banks Beach Nourishment Event 2 paragraph (SAW-2019-01666)
Biological Opinion (USFWS, dated 07/13/20)
government reportNot linked to a paper · SAW-2020-00850 (Cane River Park Stream Bank Stabilization)
Piedmont Regional Hydraulic Geometry Curve data
datasetNot linked to a paper · SAW-2020-01176 (City of Durham / EWP Streambank Sites 1 & 2)
Blue Earth Ecological Services Biological Assessment (BA) dated December, 2012
research reportNot linked to a paper · SPA-2004-00317
Cowardin (et al. 1979)
otherNot linked to a paper · SPA-2015-00018-ABQ (Grindstone Dam section)
(U.S. Fish and Wildlife Service, 2003)
government reportNot linked to a paper · SPA-2014-00540 (San Felipe Priority Sites)
San Felipe Priority Sites RM 214.4, RM 212.8 and RM 211.3: Project Description (dated February 2014)
research reportNot linked to a paper · SPA-2014-00540 (San Felipe Priority Sites)
Compensatory Mitigation Plan San Felipe Priority Sites: Phase 2 Upstream Project RM 214.4, RM 212.8 and RM 211.3 (dated July 2015, revised in September 2015)
research reportNot linked to a paper · SPA-2014-00540 (San Felipe Priority Sites)
Environmental Protection Agency Water Quality Certification (dated September 9, 2015)
government reportNot linked to a paper · SPA-2014-00540 (San Felipe Priority Sites)
BOR 2009
government reportNot linked to a paper · SPA-2015-00306-ABQ (Pueblo of Sandia Riverine Habitat Restoration Project paragraph)
U.S. Fish and Wildlife Service [USFWS] 2003
government reportNot linked to a paper · SPA-2015-00307-ABQ (Rio Rancho Open Space Habitat Restoration Project, Phase II paragraph)
← PreviousNext →