Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 28Download these results: CSV · JSON
New Mexico Department of Transportation Categorical Exclusion" for Project Number A301232, dated November 18, 2015
government reportNot linked to a paper · SPA-2015-00415 (Geotechnical Drilling at US 550 and Rio Grande A301232 paragraph)
Waste Water Lagoon Bank Protection Plans Feb 19 2016.pdf drawings
research reportNot linked to a paper · SPA-2016-00075-ABQ (Pueblo of Jemez Waste Water Treatment Plant Lagoon Protection Project paragraph)
Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) for the Southwest Jemez Mountains Landscape Restoration Project (SWJLRP)
government reportNot linked to a paper · SPA-2017-00317 (Rio Cebolla Beaver Dam Analogs paragraph)
U.S. Geological Survey’s (USGS) Monument 7.5-minute quadrangle (USGS 2020)
datasetNot linked to a paper · SPA-2020-00202
Smith Environmental and Engineering provided a Waters of the US Report (Smith)
research reportNot linked to a paper · SPA-2021-00067
preconstruction notification design plans prepared by Crane Associates, dated March 18, 2021
research reportNot linked to a paper · SPA-2021-00156
Preconstruction Notification, dated September 7, 2017.
government reportNot linked to a paper · Casey's Pond paragraph (Site 1 WETLANDS SPK-2006-75501)
Battle Creek Salmon & Steelhead Restoration Project plans dated October 26, 2017.
government reportNot linked to a paper · South Canal/South Diversion Dam paragraph (SPK-2007-00465)
EPA/COE Guidelines to interpretation of Rapanos Decision (document dated Dec 2, 2008).
government reportNot linked to a paper · Metcalf Gulch JD (SPK-2008-01590) paragraph
Folsom South EIS - Master File
government reportNot linked to a paper · SPK-2007-02159 (Folsom South EIS - Master File)
California WaterFix
otherNot linked to a paper · SPK-2008-00861 (PLACEHOLDER)
PCWA Middle Fork American River Sediment Sampling
research reportNot linked to a paper · SPK-2008-00899
PBS&J 2006
research reportNot linked to a paper · Central Freeway Channel Phase II (SPK-2011-00023) - "PBS&J 2006"
Bay Delta Conservation Plan
government reportNot linked to a paper · DWR Geotechical Engineering Studies (SPK-2010-00744) - "to further the Bay Delta Conservation Plan"
Seismic Deformation Potential of Levees Founded on Peaty Organic Soil
research reportNot linked to a paper · SPK-2010-01427 - "Seismic Deformation Potential of Levees Founded on Peaty Organic Soil"
Windy Gap Reservoir Drawdown Execution Plan dated December 31, 2019
research reportNot linked to a paper · Windy Gap Reservoir Drawdown and Geotechnical Survey project (SPK-2010-00730) - "Windy Gap Reservoir Drawdown Execution Plan dated December 31, 2019"
Pre-construction Notification plans submitted to this office on December 4, 2019
otherNot linked to a paper · Windy Gap Reservoir Drawdown and Geotechnical Survey project (SPK-2010-00730) - "Pre-construction Notification plans submitted to this office on December 4, 2019"
USACE July 1964 "Operation and Maintenance Manuarl for the Truckee River and Tributaries, California and Nevada"
government reportNot linked to a paper · SPK-2013-00601
Template seven of the SERP manual
government reportNot linked to a paper · SPK-2014-00588 (DWR SERP Colusa Drain)
Our House Diversion Dam Impoundment Aquatic Resources Impacts, dated November 2020 (Enclosure 1), prepared by HDR
research reportNot linked to a paper · SPK-2014-00703 (Our House Diversion Dams Sediment Management)
Disposal Site 2, Aquatic Resources Impacts (Enclosure 2), dated November 2020, prepared by HDR
research reportNot linked to a paper · SPK-2014-00703 (Our House Diversion Dams Sediment Management)
American Association of State Highway and Transportation Officials (AASHTO) minimum standards
otherNot linked to a paper · SPK-2013-01046 (Alta Mesa Bridge Replacement at Laguna Creek)
Biological Assessment for CR 209 Cottonwood Pass Road dated November 2015
research reportNot linked to a paper · SPK-2015-00946
Wetland Delineation Report and Pre-Construction Notification plans received by this office on November 12, 2015
research reportNot linked to a paper · SPK-2015-01034 / SPK-2015-01044 / Questar Mainline 68 Replacement
Pre-Construction Notification plans dated May 21, 2019
research reportNot linked to a paper · SPK-2015-00698 Anderson River Park Side Channel Project
Pre-Construction Notification plans dated August 3, 2015
research reportNot linked to a paper · SPK-2015-00699 Drop 5 Hydro
Pre-Construction Notification plans dated August 29, 2017
research reportNot linked to a paper · SPK-2015-00771 San Miguel River Restoration (Reach-1A)
Pre-construction Notification dated April 20, 2016
research reportNot linked to a paper · SPK-2015-00771 San Miguel River Restoration
Pre-construction Notification plans submitted to this office on November 6, 2018, by Resource Engineering Incorporated
research reportNot linked to a paper · SPK-2015-01106 Mt. Crested Butte Pump Station Replacement
Environmental Monitoring Plan (associated with Paonia Dam work)
research reportNot linked to a paper · SPK-2016-00228 Paonia Dam Outlet Works Repair
Existing Ramp and Boarding Dock Replacement plans dated September 17, 2018
research reportNot linked to a paper · SPK-2016-00029 McArthur-Burney Falls Memorial State Park Ramp and Boarding Float Replacement Project
Blue Creek Ranch Pond Maintenance Project plans dated April 3, 2016
research reportNot linked to a paper · SPK-2016-00255
¿Shell Pipeline Panoche Creek Armoring Project¿ plans dated April 2016
research reportNot linked to a paper · SPK-2016-00309
Plans for Construction of the Clover Valley WRP Project dated February 10, 2014, prepared by the Natural Resources Conservation Service.
government reportNot linked to a paper · SPK-2017-00455
Rio Vista Side Channel Project plans, dated November 7, 2018.
research reportNot linked to a paper · SPK-2017-00453
Pit River Bridge on Cassel-Fall River Road plans dated August 14, 2018.
research reportNot linked to a paper · SPK-2016-00760
National Fish and Wildlife Foundation’s Sacramento District California In-Lieu Fee Program
web pageNot linked to a paper · Truxtun Oak Intersection Improvements
figure titled Corps Permit Area, Wildflower Solar Facility (prepared by H.T. Harvey & Associates, dated June 2019)
research reportNot linked to a paper · Wildflower Solar (VP14)
Garden Highway Mutual Water Company Fish Screen Project ISI Mechanical Systems plans dated August 2019
research reportNot linked to a paper · GHMWC Fish Screen project (SPK-2018-00680)
January 2019 Union Pacific Railroad Valley Sub MP 140.02 Bridge Replacement, West Linda, Yuba County, California, Plan View drawings, prepared by Arcadis.
research reportNot linked to a paper · UPRR MP 140.02 Segment B Bridge Replacement (SPK-2018-00945)
Resource Conservation and Recovery Act Statement of Basis (as supported by the California Environmental Quality Act Initial Study/Mitigated Negative Declaration (IS/MND))
government reportNot linked to a paper · Chemours-Oakley Remediation Project (SPK-2018-00848)
Pre-construction Notification plans submitted to this office on July 31, 2018 (Gunnison River Pipeline Crossing) and details regarding the cofferdam work submitted via email on August 29, 2018.
research reportNot linked to a paper · Gunnison to Crested Butte Pipeline (SPK-2018-00505)
Pre-construction Notification plans submitted June 15, 2018 (Clark's Stream)
research reportNot linked to a paper · Gunnison to Crested Butte Pipeline - Clark's Stream (SPK-2018-00505)
Pre-construction Notification plans dated July 15, 2020.
research reportNot linked to a paper · Roam Residential Development (SPK-2018-01012)
Regional General Permit 12 plans revised August 5, 2020 (enclosed).
research reportNot linked to a paper · Clover Meadows Ranch Aquatic Habitat Improvement (SPK-2019-00125)
Figure 3. Waters of the U.S., Proposed Impacts and Avoidance drawings, prepared by ECORP Consulting, Inc., March 13, 2019, and the March 7, 2019, Preliminary Open Space Grading Placer Vineyards Specific Plan, Property 1A drawings, prepared by Mackay & Somps.
research reportNot linked to a paper · PVSP-Infrastructure Segment S1 (SPK-2019-00193)
the Department's Salmonid Stream Habitat Restoration Manual
government reportNot linked to a paper · Site 1: OTHER WATERS SPL-2003-01123 (near Fisheries Restoration Grant Program RGP)
Sonata Property Mitigation Site Habitat Mitigation and Monitoring Plan for the La Costa Town Square Center Project (HMMP; Glen Lukos Associates [GLA], November 29, 2012)
research reportNot linked to a paper · SPL-2008-00491-SAS (La Costa Town Square Project)
The SAP and SAR are available at the following FTP site: ftp://ftp.polb.com/general, within the folder titled "Piers T & J Maintenance Dredging."
web pageNot linked to a paper · SPL-2008-00950 (POLB Maintenance)
Emergency Work Plan prepared by the applicant (CSLC, March 18, 2014)
research reportNot linked to a paper · SPL-2008-00769 (Santa Barbara Coastal Hazards Removal Project)
← PreviousNext →