Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
New Mexico Department of Transportation Categorical Exclusion" for Project Number A301232, dated November 18, 2015
Waste Water Lagoon Bank Protection Plans Feb 19 2016.pdf drawings
Final Environmental Impact Statement (FEIS) and Record of Decision (ROD) for the Southwest Jemez Mountains Landscape Restoration Project (SWJLRP)
U.S. Geological Survey’s (USGS) Monument 7.5-minute quadrangle (USGS 2020)
Smith Environmental and Engineering provided a Waters of the US Report (Smith)
preconstruction notification design plans prepared by Crane Associates, dated March 18, 2021
Preconstruction Notification, dated September 7, 2017.
Battle Creek Salmon & Steelhead Restoration Project plans dated October 26, 2017.
EPA/COE Guidelines to interpretation of Rapanos Decision (document dated Dec 2, 2008).
Folsom South EIS - Master File
California WaterFix
PCWA Middle Fork American River Sediment Sampling
PBS&J 2006
Bay Delta Conservation Plan
Seismic Deformation Potential of Levees Founded on Peaty Organic Soil
Windy Gap Reservoir Drawdown Execution Plan dated December 31, 2019
Pre-construction Notification plans submitted to this office on December 4, 2019
USACE July 1964 "Operation and Maintenance Manuarl for the Truckee River and Tributaries, California and Nevada"
Template seven of the SERP manual
Our House Diversion Dam Impoundment Aquatic Resources Impacts, dated November 2020 (Enclosure 1), prepared by HDR
Disposal Site 2, Aquatic Resources Impacts (Enclosure 2), dated November 2020, prepared by HDR
American Association of State Highway and Transportation Officials (AASHTO) minimum standards
Biological Assessment for CR 209 Cottonwood Pass Road dated November 2015
Wetland Delineation Report and Pre-Construction Notification plans received by this office on November 12, 2015
Pre-Construction Notification plans dated May 21, 2019
Pre-Construction Notification plans dated August 3, 2015
Pre-Construction Notification plans dated August 29, 2017
Pre-construction Notification dated April 20, 2016
Pre-construction Notification plans submitted to this office on November 6, 2018, by Resource Engineering Incorporated
Environmental Monitoring Plan (associated with Paonia Dam work)
Existing Ramp and Boarding Dock Replacement plans dated September 17, 2018
Blue Creek Ranch Pond Maintenance Project plans dated April 3, 2016
¿Shell Pipeline Panoche Creek Armoring Project¿ plans dated April 2016
Plans for Construction of the Clover Valley WRP Project dated February 10, 2014, prepared by the Natural Resources Conservation Service.
Rio Vista Side Channel Project plans, dated November 7, 2018.
Pit River Bridge on Cassel-Fall River Road plans dated August 14, 2018.
National Fish and Wildlife Foundation’s Sacramento District California In-Lieu Fee Program
figure titled Corps Permit Area, Wildflower Solar Facility (prepared by H.T. Harvey & Associates, dated June 2019)
Garden Highway Mutual Water Company Fish Screen Project ISI Mechanical Systems plans dated August 2019
January 2019 Union Pacific Railroad Valley Sub MP 140.02 Bridge Replacement, West Linda, Yuba County, California, Plan View drawings, prepared by Arcadis.
Resource Conservation and Recovery Act Statement of Basis (as supported by the California Environmental Quality Act Initial Study/Mitigated Negative Declaration (IS/MND))
Pre-construction Notification plans submitted to this office on July 31, 2018 (Gunnison River Pipeline Crossing) and details regarding the cofferdam work submitted via email on August 29, 2018.
Pre-construction Notification plans submitted June 15, 2018 (Clark's Stream)
Pre-construction Notification plans dated July 15, 2020.
Regional General Permit 12 plans revised August 5, 2020 (enclosed).
Figure 3. Waters of the U.S., Proposed Impacts and Avoidance drawings, prepared by ECORP Consulting, Inc., March 13, 2019, and the March 7, 2019, Preliminary Open Space Grading Placer Vineyards Specific Plan, Property 1A drawings, prepared by Mackay & Somps.
the Department's Salmonid Stream Habitat Restoration Manual
Sonata Property Mitigation Site Habitat Mitigation and Monitoring Plan for the La Costa Town Square Center Project (HMMP; Glen Lukos Associates [GLA], November 29, 2012)
The SAP and SAR are available at the following FTP site: ftp://ftp.polb.com/general, within the folder titled "Piers T & J Maintenance Dredging."
Emergency Work Plan prepared by the applicant (CSLC, March 18, 2014)