Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 26Download these results: CSV · JSON
Erosion and Sediment Control plans entitled, "Macon Quarry Amendment 1", prepared by Kleinfelder, last revised on June 9, 2017
research reportNot linked to a paper · SAS-1994-06520 (Macon Quarry) — reference to enclosed plans
project plans entitled, "Final Site Development Plans for CSX Fairburn Capacity Expansion" prepared by Evans, Mechwar, Hambleton & Tilton, Incorporated and AEC Civil Engineering, last revised on May 22, 2017
research reportNot linked to a paper · SAS-1997-03520 (CSX Intermodal Atlanta Terminal) — reference to project plans
plans entitled, "The Exchange at 1105 ¿ Apartments", dated September 8, 2017, unrevised, prepared by Stothard Engineering, Incorporated, sheet C-2 (Enclosure 2)
research reportNot linked to a paper · SAS-2005-01802 (Magnolia Subdivision / The Exchange) — reference to enclosed plans
Georgia Storm Water Management Manual
government reportNot linked to a paper · SAS-2007-00531 Lakefield Urban Watershed Restoration
2009 FAA Environmental Assessment
government reportNot linked to a paper · SAS-2008-00972 LaGrangeTroup County Airport Expansion
Final Banking Instrument (BI), dated July 16, 2018
otherNot linked to a paper · SAS-2011-00799
Southern Ionics Mission Mine South Surface Mining Land Use Plan Amendment No. 2, dated February 2014
research reportNot linked to a paper · SAS-2012-01042
National Science Foundation funded Savannah River monitoring by Institute of Applied Ecology at Clemson University; Intelligent River Environmental Monitoring Project
datasetNot linked to a paper · SAS-2012-01003
U.S. Army Corps of Engineers 1987 Wetland Delineation Manual
government reportNot linked to a paper · SAS-2013-00360
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0)
government reportNot linked to a paper · SAS-2013-00360
GDOT Bridge Structure Maintenance and Rehabilitation Repair Manual
government reportNot linked to a paper · SAS-2013-00910
"Corrosion-Free Precast Prestressed Concrete Piles Made with Stainless Steel Reinforcement: Construction, Test and Evaluation"
research reportNot linked to a paper · SAS-2013-00742
National Register of Historic places
datasetNot linked to a paper · SAS-2013-00910
EDGES
datasetNot linked to a paper · SAS-2013-00883
United States Geological Survey (USGS) Martinez and Augusta West 7.5 Minute Topographic Quadrangles
datasetNot linked to a paper · Phase I of the Berckmans Road realignment (near top)
USFWS Information, Planning, and Conservation System (IPaC) website
web pageNot linked to a paper · Linear Pipeline City of Baxley (SAS-2015-00389) · cited link
"Stream Restoration Plan, Taylor County Solar Site", prepared by Prime Engineering Incorporated, on November 8, 2017
research reportNot linked to a paper · Taylor County Tract - Sandhill Solar Site (SAS-2014-00905)
2007 Savannah District Manatee Conditions for Aquatic Construction
government reportNot linked to a paper · SAS-2015-00670 Copeland Dock (manatee conditions)
Information, Planning and Conservation (IPaC) System database
web pageNot linked to a paper · SAS-2016-00062 GDOT - CR 50 / Lyons Road over Joes Creek (IPaC database) · cited link
Short-term Development Program for improvements to the SAV
research reportNot linked to a paper · SAS-2016-00034 Georgia Air National Guard-165th Airlift Wing (Short-term Development Program)
Savannah District credit calculation worksheet
government reportNot linked to a paper · SAS-2015-00933 River Brook (credit calculation worksheet)
FY 16-PGPS for savannah district civil works project lakes
government reportNot linked to a paper · SAS-2016-00033 FY 16-PGPS for savannah district civil works project lakes
Archaeological Assessment In-House Survey Report dated August 26, 2014.
research reportNot linked to a paper · Archaeological resources (beginning of document)
“QuikTrip 0749 Wetlands and Stream Site Plan”, prepared by Wolverton & Associates on January 18, 2016, unrevised.
research reportNot linked to a paper · SAS-2016-00080 (QuikTrip Corporation - 3110 Roswell Rd Store Redevelopment)
“Construction Plans for: Georgia Power Company, East Point – Villa Rica 230kv Transmission Line, Stream Restoration and Stabilization for Structure 22”, prepared by Engineering 303, dated March 30, 2016, unrevised.
research reportNot linked to a paper · SAS-2016-00128 (GA Power Emergency Permit)
“BMW of South Atlanta Renovation”, prepared by Doulgerakis Consulting Engineers, Incorporated, last revised February 3, 2016.
research reportNot linked to a paper · SAS-2016-00192 (BMW of South Atlanta - Stormwater management for facility expansion)
“Glenn Property – Glenridge Tract” prepared by Corblu Ecology Group, Project number 02-020412.
research reportNot linked to a paper · SAS-2016-00191 (Ashton Woods, Glenn West Residential subdivision)
“Cross Section Design: Chattahoochee River Streambank Stabilization, 420 Ferry Landing NW, Sandy Spring, Fulton County, GA for Mr. Ken Campbell.”, dated April 5, 2016, prepared by Contour Environmental, LLC.
research reportNot linked to a paper · SAS-2016-00231 (420 Ferry Landing Streambank Stabilization)
“Figure 3 – Site Impact Map, 5584 Five Notch Trail” (site plans), submitted January 11, 2017.
research reportNot linked to a paper · SAS-2016-00493 (5584 Five Notch Trail Stream Crossing)
“Lake Frances Dam, Colliers International Management - Atlanta”, dated September 22, 2016, prepared by Schnabel Engineering.
research reportNot linked to a paper · SAS-2016-00476 (Lake Frances Dam Repair)
“Kingsland S/D, Phase I”, prepared by Watts & Browning Engineers, Incorporated, dated October 29, 2015, unrevised.
research reportNot linked to a paper · SAS-2016-00377 (Kingsland Subdivision Phase 1)
Scope from Haight Davis & Associates (Court Order issued January 25th, 2016) for Vineyards Homeowner association pond repair.
research reportNot linked to a paper · SAS-2016-00232 (Vineyards Pond & Streambank Remediation)
Bat survey conducted by Eco-Tech consultants in August 2015.
research reportNot linked to a paper · SAS-2016-00265 (Paudling County Parks and Recreation - Union Park)
United States Fish and Wildlife Service Information, Planning, and Conservation (IPaC) system (website).
web pageNot linked to a paper · Referenced in multiple project biological reviews (e.g., SAS-2016-00312) · cited link
Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) (website).
web pageNot linked to a paper · SAS-2016-00590 (SR 56 widening - mitigation banks) · cited link
“QuikTrip 0742”, prepared by Wolverton & Associates, dated March 17, 2016, unrevised.
research reportNot linked to a paper · SAS-2016-00587 (QuikTrip 291 Six Flags Drive redevelopment)
Project plans prepared by Engineering 303 for Georgia Power (same as “Construction Plans for: Georgia Power Company…”) referenced elsewhere.
research reportNot linked to a paper · SAS-2016-00128 (GA Power Emergency Permit)
Maintenance Plans for River Glen Dams, dated December 4, 2015, unrevised, sheets 1-10 of 10. (Schnabel Engineering)
research reportNot linked to a paper · SAS-2016-00715 (River Glen Subdivision) fn: near description of maintenance activities
"Colonial Pipeline Company, SE, Line 2 Maintenance – Dig No. 69", prepared by Corblu Ecology Group, LLC (plans), submitted as Figure 5 with the PCN.
research reportNot linked to a paper · SAS-2016-01028 (Colonial Pipeline Company Line 2 Maintenance) fn: project description
Sapelo Cross Shore Measurements in Duplin River (University of Georgia, DiIorio Physical Oceanography research group) Georgia Coastal Ecosystems Long Term Ecological Research related study
research reportNot linked to a paper · SAS-2016-00704 (Sapelo Cross Shore Measurements in Duplin River) fn: project description
"2004 Standard Operating Procedure (SOP) tables"
research reportNot linked to a paper · SAS-2017-00478 (State Route 253 over Spring Creek) — discussion of mitigation credit calculations
"2018 (SOP) for Compensatory Mitigation table"
research reportNot linked to a paper · SAS-2017-00478 (State Route 253 over Spring Creek) — discussion of mitigation credit calculations
project plans entitled "Fort Benning, Georgia, Good Hope maneuver Area Trails, PN 87980", prepared by Mason & Hanger, dated December 2016
research reportNot linked to a paper · SAS-2017-00197 (Good Hope Trails) — Phase I project plans citation
project plans entitled "Fort Benning, Georgia, Good Hope Heavy Maneuver Training Area PHII, FY17, PN 89215", prepared by Mason & Hanger, dated December 2017
research reportNot linked to a paper · SAS-2017-00197 (Good Hope Trails) — Phase II project plans citation
project plans entitled "Douglas Hill Road Chafin Property" prepared by Eberly & Associates on January 30, 2017, unrevised
research reportNot linked to a paper · SAS-2017-00085 (Douglas-Factory Site) — project plans citation
project plans entitled "Preferred Site Layout, Switch" prepared by Bohler Engineering, dated May 22, 2018 (identified as Appendix J, Figure 2)
research reportNot linked to a paper · SAS-2017-00419 (Mystery Data Center / SWITCH Keep Campus) — Appendix J reference
"Wetland Exhibit, Marne Road Fitness Trail", prepared by EMC Engineering Services, Incorporated, dated September 18, 2017
research reportNot linked to a paper · SAS-2017-00897 (Marne Road Tract)
"Cochran Shoals Sewer Project", prepared by Kemron Environmental Services, dated December 14, 2017, Figure 3
research reportNot linked to a paper · SAS-2018-00051 (Cochran Shoals National Park Service Sewer line replacement)
"Wetlands Impact Exhibit, Dollar General, Meansville", dated September 22, 2017, prepared by EMC Engineering Services, Incorporated
research reportNot linked to a paper · SAS-2017-00951 (Meansville, GA)
"Mike Pate Property, Noland Drive", prepared by French & Associates, sheets C1 – C.3
research reportNot linked to a paper · SAS-2018-00368 (Mike Tate Noland Drive Stream Restoration)
← PreviousNext →