Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
Erosion and Sediment Control plans entitled, "Macon Quarry Amendment 1", prepared by Kleinfelder, last revised on June 9, 2017
project plans entitled, "Final Site Development Plans for CSX Fairburn Capacity Expansion" prepared by Evans, Mechwar, Hambleton & Tilton, Incorporated and AEC Civil Engineering, last revised on May 22, 2017
plans entitled, "The Exchange at 1105 ¿ Apartments", dated September 8, 2017, unrevised, prepared by Stothard Engineering, Incorporated, sheet C-2 (Enclosure 2)
Georgia Storm Water Management Manual
2009 FAA Environmental Assessment
Final Banking Instrument (BI), dated July 16, 2018
Southern Ionics Mission Mine South Surface Mining Land Use Plan Amendment No. 2, dated February 2014
National Science Foundation funded Savannah River monitoring by Institute of Applied Ecology at Clemson University; Intelligent River Environmental Monitoring Project
U.S. Army Corps of Engineers 1987 Wetland Delineation Manual
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0)
GDOT Bridge Structure Maintenance and Rehabilitation Repair Manual
"Corrosion-Free Precast Prestressed Concrete Piles Made with Stainless Steel Reinforcement: Construction, Test and Evaluation"
National Register of Historic places
EDGES
United States Geological Survey (USGS) Martinez and Augusta West 7.5 Minute Topographic Quadrangles
USFWS Information, Planning, and Conservation System (IPaC) website
"Stream Restoration Plan, Taylor County Solar Site", prepared by Prime Engineering Incorporated, on November 8, 2017
2007 Savannah District Manatee Conditions for Aquatic Construction
Information, Planning and Conservation (IPaC) System database
Short-term Development Program for improvements to the SAV
Savannah District credit calculation worksheet
FY 16-PGPS for savannah district civil works project lakes
Archaeological Assessment In-House Survey Report dated August 26, 2014.
“QuikTrip 0749 Wetlands and Stream Site Plan”, prepared by Wolverton & Associates on January 18, 2016, unrevised.
“Construction Plans for: Georgia Power Company, East Point – Villa Rica 230kv Transmission Line, Stream Restoration and Stabilization for Structure 22”, prepared by Engineering 303, dated March 30, 2016, unrevised.
“BMW of South Atlanta Renovation”, prepared by Doulgerakis Consulting Engineers, Incorporated, last revised February 3, 2016.
“Glenn Property – Glenridge Tract” prepared by Corblu Ecology Group, Project number 02-020412.
“Cross Section Design: Chattahoochee River Streambank Stabilization, 420 Ferry Landing NW, Sandy Spring, Fulton County, GA for Mr. Ken Campbell.”, dated April 5, 2016, prepared by Contour Environmental, LLC.
“Figure 3 – Site Impact Map, 5584 Five Notch Trail” (site plans), submitted January 11, 2017.
“Lake Frances Dam, Colliers International Management - Atlanta”, dated September 22, 2016, prepared by Schnabel Engineering.
“Kingsland S/D, Phase I”, prepared by Watts & Browning Engineers, Incorporated, dated October 29, 2015, unrevised.
Scope from Haight Davis & Associates (Court Order issued January 25th, 2016) for Vineyards Homeowner association pond repair.
Bat survey conducted by Eco-Tech consultants in August 2015.
United States Fish and Wildlife Service Information, Planning, and Conservation (IPaC) system (website).
Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS) (website).
“QuikTrip 0742”, prepared by Wolverton & Associates, dated March 17, 2016, unrevised.
Project plans prepared by Engineering 303 for Georgia Power (same as “Construction Plans for: Georgia Power Company…”) referenced elsewhere.
Maintenance Plans for River Glen Dams, dated December 4, 2015, unrevised, sheets 1-10 of 10. (Schnabel Engineering)
"Colonial Pipeline Company, SE, Line 2 Maintenance – Dig No. 69", prepared by Corblu Ecology Group, LLC (plans), submitted as Figure 5 with the PCN.
Sapelo Cross Shore Measurements in Duplin River (University of Georgia, DiIorio Physical Oceanography research group) Georgia Coastal Ecosystems Long Term Ecological Research related study
"2004 Standard Operating Procedure (SOP) tables"
"2018 (SOP) for Compensatory Mitigation table"
project plans entitled "Fort Benning, Georgia, Good Hope maneuver Area Trails, PN 87980", prepared by Mason & Hanger, dated December 2016
project plans entitled "Fort Benning, Georgia, Good Hope Heavy Maneuver Training Area PHII, FY17, PN 89215", prepared by Mason & Hanger, dated December 2017
project plans entitled "Douglas Hill Road Chafin Property" prepared by Eberly & Associates on January 30, 2017, unrevised
project plans entitled "Preferred Site Layout, Switch" prepared by Bohler Engineering, dated May 22, 2018 (identified as Appendix J, Figure 2)
"Wetland Exhibit, Marne Road Fitness Trail", prepared by EMC Engineering Services, Incorporated, dated September 18, 2017
"Cochran Shoals Sewer Project", prepared by Kemron Environmental Services, dated December 14, 2017, Figure 3
"Wetlands Impact Exhibit, Dollar General, Meansville", dated September 22, 2017, prepared by EMC Engineering Services, Incorporated
"Mike Pate Property, Noland Drive", prepared by French & Associates, sheets C1 – C.3