Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 18Download these results: CSV · JSON
Stafford County Department of Utilities, Truslow Road Neighborhood, Sanitary Sewer Project, Stafford County, Virginia (engineered by Thrasher, dated December 9, 2015)
research reportNot linked to a paper · fn: NAO-2015-02191-rdb (Truslow Road Utility)
Overall Wetland and Waters of the US Impact Map (Carter’s Mill) (prepared by Wetland Studies and Solutions, Inc, dated December, 2017)
research reportNot linked to a paper · fn: NAO-2016-00028-arl
Proposed: Timber Pier & Boatlift, In: West Branch Lynnhaven River, At: 4010 Richardson Road, Applicant: C. Dobzyniak (by Calvert Marine and Blakeway Corp. dated January 15, 2016)
research reportNot linked to a paper · fn: NAO-2016-00234
Stoehr Plans, Pages 1-4 (prepared and submitted by the applicant, Mark Stoehr, undated) 'Stoehr Plans'
research reportNot linked to a paper · fn: NAO-2015-02132-drc (Giles River Bank Stabilization)
Appalachian Trail with Site Locations; Site Location Map, Givens; Wetlands Delineation (prepared by The National Park Service and dated 2015)
research reportNot linked to a paper · fn: NAO-2015-02133-drc
Project Area Locator Map; VCRIS maps; profile sketches of the stabilization plans and the cross section plans of coir log placements (submitted by Mr. James Dolan) for Fort Eustis temporary shoreline stabilization
research reportNot linked to a paper · fn: NAO-2015-02151-man; NAO-2016-00251-man
Figure 2 PCN Map Project: Bank Stabilization & Culvert Installation FY 2017 Zone D- Location 63 Brigadoon I -Virginia Beach, VA dated 8-8-2016 by Kimley Horn and submitted on 8-10-2016.
research reportNot linked to a paper · opening (first paragraph)
Figures 1, 2, 2.1, 2.2, and 2.3 entitled 'Project: Culvert and Forebay Maintenance at 3 Road Crossings Virginia Beach, VA; dated 4/13/2016 by Kimley Horn.
research reportNot linked to a paper · NAO-2016-00698 (City of Virginia Beach Windsor Woods Forebay maintenance)
Sheets 1-5 entitled "Project Location: Lake Joyce, For: Lewis Affronti, 4441 Blackbeard Road, Virginia Beach VA 23455; Proposed Riprap, Piling & Dock, Purpose: Erosion Control" dated 3-2-2016 by Professional Construction Consultants, LLC.
research reportNot linked to a paper · NAO-2016-00461 (Lewis Affronti Jr)
Sheets 1-9 entitled "Project Location: Lake Joyce, For: Joanne Renn, 4429 Blackbeard Road, Virginia Beach VA 23455; Proposed Bulkhead/Riprap/Ramp, Purpose: Erosion Control" dated 3-8-2016 by Professional Construction Consultants, LLC.
research reportNot linked to a paper · NAO-2016-00572 (Joanne Renn)
Sheets 1-12 prepared by Gallup Surveyors & Engineers, Ltd. and stamped as received by our office on March 17, 2016.
research reportNot linked to a paper · NAO-2016-00549 (Atherton Pier and Lift)
Figures 1-6 entitled 'Aviation Maintenance Instruction Building Fort Eustis' dated 1 June 2018 by the Department of Army, Norfolk District, Corps of Engineers.
government reportNot linked to a paper · NAO-2016-00872-man (Fort Eustis Aviation Maintenance Facility)
Figures G-001, G-002, V-100, C101-C104, C-301,and C-501 dated August 11, 2017 by Moffatt & Nichol titled 'Green Run Lake #3 Mechanical Dredging'.
research reportNot linked to a paper · NAO-2016-00832 (Green Run Lake #3)
Drawings prepared by Ecosystem Services titled 'Commonwealth Boat Broker, 423 S. Washington Highway, Wetland Impact Map, Hanover County, Virginia' dated July 20, 2016.
research reportNot linked to a paper · NAO-2016-00390-sbg (Commonwealth Boat Brokers)
Drawings entitled "NAS Oceana Dam Neck Annex, SOF Perimeter Security Improvements" By Waller, Todd & Sadler for NAVFAC, revised on August 11, 2016.
otherNot linked to a paper · NAO-2016-01061-man
drawings titled "Jurisdictional Impacts Map – Apple Manor" prepared and submitted on behalf of the applicant by Stantec and dated July, 2016.
otherNot linked to a paper · NAO-2016-01023-arl
"Railroad Bridges 4 & 5 Rehabilitation, Fort Eustis, Virginia," prepared by the U.S. Army Corps of Engineers dated December 20, 2016.
otherNot linked to a paper · NAO-2016-01140
Final Environmental Impact Statement (FEIS) conducted in 2013 by VDOT for the entire I-64 corridor between Richmond, Virginia (I-95) to Hampton, Virginia (I-664).
government reportNot linked to a paper · NAO-2016-01096-SAF
"GREENSPRINGS DRAINAGE IMPROVEMENT PROJECT STREAM RESTORATION PLAN" sheets 1 through 31, prepared and submitted on behalf of the applicant by Stantec Consulting Services, Inc. dated December 22, 2016.
otherNot linked to a paper · NAO-2016-01196-ndh
map prepared by Timmons entitled "Shoppes at Harpers Mill-Phase II, Chesterfield County, Virginia, Figure 3 Preliminary Jurisdictional Waters of the U.S. Impacts Map" dated June 1, 2017.
otherNot linked to a paper · NAO-2016-01497-sbg
drawings entitled "Project Location: Boat Basin, For: Outdoor Resorts V.B. Gary Crooks 3665-1001 Sandpiper Road Virginia Beach, VA 23456, Proposed Bulkhead, Purpose: Erosion Control" dated 6/16/2016 by Professional Construction Consultants, LLC and received by the Corps on 8/22/2016.
otherNot linked to a paper · NAO-2016-01231
drawings titled "Wetlands & Waters of the US Impact Map – Lonesome Road" prepared and submitted on behalf of the applicant by TNT Environmental and dated September 2, 2016.
otherNot linked to a paper · NAO-2016-01623-arl
"Rip Rap Revetment Plan, The Property of MCBRK Bilowus Trust (TM 38 Parcel 20)," prepared and submitted by Allison Baird & Sehl, PC and dated August 2, 2016.
otherNot linked to a paper · NAO-2016-01554-rdb
¿Replace Perimeter Fence Fort Story, JEBLCFS-Fort Story, Virginia Beach, Virginia,¿ prepared by NAVFAC dated August 5, 2016
research reportNot linked to a paper · NAO-2016-01648 (JEBFS -Fort Story Perimeter Fence) fn near that entry
¿Project: Culvert and Forebay Maintenance at 791 Oriole Drive, Virginia Beach, VA¿ dated 9/9/2016 and submitted on 9/21/2016 by Kimley Horn.
research reportNot linked to a paper · NAO-2016-01711-man (City of Virginia Beach Oriole Drive culvert and forebay)
¿NOVEC Duct Bank Installation¿ prepared ... by TNT Environmental and dated October 11, 2016.
research reportNot linked to a paper · NAO-2016-01947 (673 Novec)
¿Harrison Crossing Place Impact Map¿ prepared on behalf of the applicant by Stantec and dated August 25, 2016.
research reportNot linked to a paper · NAO-2016-01954 (Harrison Crossing Place Sewer)
¿Pelham Lake ¿ Figure 2¿ prepared and submitted on behalf of the applicant by Timmons Group and dated October 4, 2016.
research reportNot linked to a paper · NAO-2016-02096 (Lake Pelham Boat Ramp)
¿Chesapeake Energy Center, Proposed Groundwater Profiling Locations,¿ by Haley Aldrich and dated November, 2016 (attached).
research reportNot linked to a paper · NAO-2016-02227-alc (CEC Boring Well Study / CEC soil samples)
¿Markel Business and Industrial Park, Wetland Delineation, Goochland County, Virginia, Impact Summary Map¿ dated July 31, 2018, prepared by VHB.
research reportNot linked to a paper · NAO-2017-00050-sbg (Markel)
¿Branch Point Drive Project, 6500 Branch Point Drive, Midlothian, Chesterfield County, Virginia¿, dated April 11, 2017, drawings prepared by ECS.
research reportNot linked to a paper · NAO-2016-02252-jsh (Branch Point-Chesterfield)
Construction Plans for the Rehabilitation of NRCS Mountain Run Dam No.11 prepared and submitted on behalf of the applicant by EEE Consulting and dated December, 2016.
research reportNot linked to a paper · NAO-2017-00259
Figures 1-3 entitled "Project: Baillio Drive Bank Stabilization, Virginia Beach, VA" dated March 2, 2017 by Kimley-Horn and Associates, Inc.
research reportNot linked to a paper · NAO-2017-00426
"Existing Conditions of Baillio Drive Ditch Project" by Precision Measurements, Inc. dated December 20, 2016.
research reportNot linked to a paper · NAO-2017-00426
Drawings prepared by Environ-Civil Engineering and Greeley and Hansen entitled "City of Richmond, Virginia, Department of Public Utilities, Almond Creek Interceptor, Creek Crossing Replacement and Creek Stabilization", dated November 2016.
research reportNot linked to a paper · NAO-2017-00512-ekh
Drawings entitled "JBLE AIRFIELD DRAINAGE PROJECT, WETLAND IMPACTS FOR FINAL PHASE I DESIGN & PRELIMINARY PHASE II/III DESIGN," dated April 4, 2018.
research reportNot linked to a paper · NAO-2017-00574-nla
Figures 1-5 entitled "Project Location: `Impoundment C', For: Lincoln & Terrina Thomas, 2528 Sanderson Lane, Virginia Beach, VA, Proposed: Bulkhead" dated April 1, 2017 by Richard T. Bartlett.
research reportNot linked to a paper · NAO-2017-00672
Drawings entitled "Erosion and Sediment Control Plans FY18 Off-Road Ditch Maintenance CIP # 7-023 Prepared for City of Virginia Beach, Department of Public Works-Operations Division" submitted on behalf of the applicant by Kimley-Horn and Associates, Inc., dated March 21, 2017.
research reportNot linked to a paper · NAO-2017-00612-man
Drawings entitled "Project: Baillio Drive Bank Stabilization, Virginia Beach, VA" (also referenced as Figures 1-3) and the project drawing entitled "Existing Conditions of Baillio Drive Ditch Project" by Precision Measurements, Inc. dated December 20, 2016.
research reportNot linked to a paper · NAO-2017-00426
York County, Virginia / AFE # XXXX-XXXXXX, pages 16-19, prepared and submitted on behalf of the applicant by Elizabeth Atherton / Kimley -Horn and dated Oct. 5, 2017
research reportNot linked to a paper · paragraph describing NAO-2017-01000-nla (near start)
¿Falling Creek Reservoir Restoration¿, figures G-1 to G-26 dated February 2018, revised May 2018
research reportNot linked to a paper · NAO-2017-01072-jsh (Falling Creek Reservoir-Chesterfield)
¿Culvert Repair Plan, Wetlands Permit Plan, Sheet 1 of 1,¿ prepared by Sullivan Donahoe Ingalls and dated May 16, 2017
research reportNot linked to a paper · NAO-2017-01071-rdb (McClean Culvert NWP)
¿Pump Station #43 & #16 Abandonment Project, Spotsylvania County, Virginia,¿ Figures 1-9, prepared and submitted on behalf of the applicant by Rummel, Klepper & Kahl, LLP and dated April 4, 2017 and revised June 30, 2017 and August 23, 2017
research reportNot linked to a paper · NAO-2017-01385-rdb (Pump Station 43 and 16 in Spotsylvania County)
¿Project: Lake Bradford Ditch & Outfall Maintenance, JEB-LC-FS, Virginia Beach, VA¿ dated 9-21-2017 by Kimley Horn
research reportNot linked to a paper · NAO-2017-01161-JEBLC-FS VA BEACH PCN-Lake Bradford Ditch Maintenance
¿Indian River Creek Drainage Outfall Improvements¿ Sheets 1-5 dated June 25, 2018 by AECOM and Waterway Surveys & Engineering, Ltd.
research reportNot linked to a paper · NAO-2017-01520 (Indian River Creek Drainage Improvements)
¿Chesapeake Beach Nourishment, Virginia Beach, VA,¿ dated July 28, 2017
research reportNot linked to a paper · NAO-2017-01269-nla (Chesapeake Beach and Ocean Park Beach Replenishment)
¿Chesapeake Beach Shoal Borrow Area¿ (location and borrow area used in Chesapeake Beach Nourishment application)
otherNot linked to a paper · NAO-2017-01269-nla (Chesapeake Beach Nourishment)
¿Cape Harbor Holdings LLC Marine Terminal & Boat Yard¿, sheets 1-11, prepared by VHB and dated July 27, 2017
research reportNot linked to a paper · NAO-2017-01457 (Cape Harbor Holdings LLC commercial marine terminal)
¿Cape Harbor Holding Co. LLC - Tidal Wetland Mitigation Plan¿ dated 5/18/18
research reportNot linked to a paper · NAO-2017-01457 (Cape Harbor Holdings LLC commercial marine terminal)
¿Downshire Chase Channel Stabilization¿ dated August 25, 2017 by Kimley-Horn and Figures 1-3 entitled 'Project: 925 Downshire Chase Bank Stabilization & Culvert Maintenance-Virginia Beach, VA' dated September 6, 2017 and Figure 4 revised on October 6, 2017 by Kimley-Horn
research reportNot linked to a paper · NAO-2017-01581 (Downshire Chase Channel Stabilization - Virginia Beach, VA)