Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
¿Enon Public Safety Complex, BMP Retrofits, County Project Number 13-0745¿ dated February 2018 by Arcadis
¿Proposed Utility Crossing Project in Chesterfield County, Applicant; Columbia Gas of VA, Windermere, Sections B & E, Figure 3¿ dated September 20, 2017 (prepared by Townes)
Final Environmental Impact Statement (FEIS) conducted in 2013 by VDOT for the entire I-64 corridor between Richmond, Virginia (I-95) to Hampton, Virginia (1-664).
Back River Navigation Channel, dated October 5, 2017
OHIO CREEK WATERSHED PROJECT (33 sheets numbered 1 through 18) dated September 2018 (Sheets 5-9, 11, and 13-18 were revised on February 2019) by VHB, ARCADIS, and the City of Norfolk
LAKE SHORELINE STABILIZATION, LANGLEY EAGLEWOOD GOLF COURSE, dated July 19, 2018
City of Virginia Beach Department of Public Works, Operations Division- Sherwood Lake Interconnect (CIP 7-413-000) dated January 2018 by Hazen and Sawyer
Figures 2-9, City of Virginia Beach-Department of Public Works, Windsor Woods Tide Gate (CIP 7-078) dated Dec 2019 By Michael Baker International
Erosion and Sediment Control Plans FY2019 Ditch Maintenance Program Zones A and I, CIP # 7-023, prepared for City of Virginia Beach, Department of Public Works-Operations Division submitted on behalf of the applicant by Kimley-Horn, dated June 15, 2018
Project: Spotsylvania Livingston Landfill Expansion Area, Waters of the U.S., Impacts Map, Spotsylvania County, Virginia, dated May 27, 2020, and last revised on July 13, 2020, drawings prepared by RES
"Lot 212 Section 7, Fawn Lake Subdivision, RPA Encroachment & Mitigation Plan," prepared and submitted by Welford Engineering and dated October 24, 2018.
Project: Burton Station Phase III PS 370, Location: Virginia Beach, Virginia dated April 12, 2019 by MAP Environmental Inc.
Figure JPA1 entitled "Project: Burton Station Pump Station, Site Plan-Wetlands Impacts" dated May 28, 2019 by MAP Environmental, Inc.
"Floating Boat Dock btw Piers 36, 37 & 38 for CRG Project Site, JEB LC FS" submitted on June 27, 2018 by NAVFAC (referenced in Desert Cove project)
"Proposed: Timber Bridge, IN: Island Creek, AT: Mulberry Island Road and Wilson Road Fort Eustis VA, Application By: Joint Base Langley-Eustis" dated June 15, 2018 by Waterfront Consulting, Inc.
"Project: Boat Basin & Lift, Docks, Mooring Piles, Jet Ski Platforms For: Robert Giuffra At: 300 Pintail Crescent, Virginia Beach, Virginia" dated August 10, 2020 by Sigma Environmental Services, Inc.
"South Harbor Subdivision Bridge Exhibit" for EH2 Development Company, LLC Isle of Wight, Virginia dated January 2021 by Stantec
"Carrington Court Dredge, Phase 2 E&S Plan, Spotsylvania VA" dated 9/13/2018
"Attachment A, Aerial View of Proposed Eastern Branch Living Shoreline for 705 Woodstock Road" and "Attachment B, Typical Cross-Sectional View of Proposed Eastern Branch Living Shoreline," dated 7/27/2018 by the Elizabeth River Project
Site Development Plan dated June 10, 2020 (Revised June 22, 2010) by Wilkins-Noble, LLC
Lot Grading Plan, Bridi Subdivision, Lot 1 dated August 7, 2020
"Morning Star Properties, LLC, Little Creek Marina," dated September 9, 2020
"Erosion and Sediment Control Plans FY 15 & FY 16 ORD Make-Up 2020 Ditch Maintenance Program, CIP # 7-023," prepared for City of Virginia Beach, Department of Public Works-Operations Division, submitted by Kimley-Horn, dated December 3, 2020
"Wetland Delineation-Green Garden FM Replacement - Virginia Beach, Virginia" dated February 16, 2021 by Kimley-Horn
"Overall Impacts to Wetlands and Waters Map, Samsara Place," Figures 1 of 1, prepared by TNT Environmental, Inc., dated April 29, 2021
"Jurisdictional Area Impacts Map Cut Sheet, Sojourner Substation 230kV Transmission Line Extension," Figures 1 of 1, prepared by C2 Environmental Inc, dated March 19, 2021
"EC – JEBLC – WON 1683382 – Pier 59 Remove Sunken LCM-6 – FY21" provided by NAVFAC MIDLANT on January 9, 2021
Plate – V Distribution of Shellfish Resources in Relation to the New Jersey Intracoastal Waterway Longport to Cape May, prepared by the US Department of the Interior, Fish and Wildlife Service, dated January 1963
Biological Opinion (BO) developed by the Bureau of Ocean Energy Management. The BO can be found at http://www.nmfs.noaa.gov/pr/consultation/opinions/boem_atlantic_gological_geophysical_biop_2013.pdf.
Guidelines for Providing Geophysical, Geotechnical, and Geohazard Information Pursuant to 30 CFR Part 585 that was developed by the Bureau of Ocean Energy Management for survey work on the outer continental shelf. This document can be found at https://www.boem.gov/G_G_Guidelines_Providing_Geophysical_Geotechnical_Geohazard_Information_Pursuant_to_30_CFR_Part_585/
Center for the Inland Bays Oyster Gardening Program
A Phase 1 Bog Turtle Habitat Survey was completed by Lotus Environmental Consulting LLC on 3/18/2016.
plans developed by Niclaus Engineering dated June 2014
National Artificial Reef Plan
State Artificial Reef Management Plan
National Fish and Wildlife Foundation (NFWF) Grant for Coastal Resiliency (CENAP-OP-R-2014-1037)
Penn's Trail Environmental letter dated June 7, 2017
Johnson, Mirmiran & Thompson conduct an inspection of the existing culvert (December 8, 2010) — report of their observations, photos, recommendations, and cost analysis
http://www.penndot.gov/ProjectAndPrograms/p3forpa/Pages/RBR-Map.aspx
http://parapidbridges.com/bridgesbycounty/Northamptoncounty/bridge201.html
PA DEP Erosion and Sediment Pollution Control Program Manual-- Technical Guidance Number 363-2134-008, March 2012 Figure 3.11 -- Temporary Cofferdam and Pump Bypass Around In-channel Work Areas.
Pennsylvania Natural Diversity Inventory (PNDI) system (Project Search ID: PNDI-621908).
U.S. Fish and Wildlife Service response letter dated June 23, 2014.
Environmental Mitigation Plan dated August 2012
USGS quad maps
NRCS design standards
Kansas Watershed Restoration and Protection Strategy
2015-2019 Cheyenne Bottoms Management Plan
2020-2024 Cheyenne Bottoms Management Plan
Nishnabotna/Platte Rivers Umbrella Mitigation Bank Instrument