Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
“Shortt’s Knob Wetland Restoration Plan Map Blue Ridge Parkway — Floyd County, VA” and “Shortt’s Knob Wetland Restoration Typical Cross-Section Map Blue Ridge Parkway — Floyd County, VA” prepared and submitted by Bob Cherry, National Park Service, date stamped as received August 18, 2014.
“Detail Schematic- Wetland Impact Map, Huckleberry Trail and Waterline Extension, Blacksburg, VA, Pages 1-20” prepared and submitted by Draper Aden Associates, dated February 26, 2015.
“Link Spring Pipe Replacement, Giles County, Virginia” prepared by Anderson and Associates, Inc., received April 16, 2015 (location map referenced).
“Proposed: CREEK BANK STABILIZATION DETAIL - TEMPORARY IMPACT - OPEN CUT IMPACT AREA 1 AND 2” (duplicate plan referenced in NAO-2014-01115-hjw)
AEP Smith Mountain Lake Recreation Projects Scruggs Boat Ramp, prepared and submitted on behalf of the applicant by Wiley Wilson and dated August 26, 2014
Trout Run Culvert Rehabilitation, Roanoke VA, For the City of Roanoke in Roanoke County, VA Construction Plans, Sheets 1, 2, 3, 4, 13,16, prepared and submitted on behalf of the applicant by Crouch Engineering and dated October 16, 2014
Green Flash Brewery and the Off-Site Improvements, Environmental Permitting Exhibit dated November 4, 2014 by Kimley-Horn and Associates, Inc.
Rocky Branch Sewer Replacement, Waters of the U.S., Impacts Map, Henrico County, dated December 13, 2017 by RES
Sandy Level Water Line Extensions, Sheets 2, 9, 10, 11, 12; Sandy Level Water Line Extensions, Flume Pipe Crossing; Sandy Level Water Line Extensions, Directional Drill Pipe Crossing, prepared on behalf of the applicant by The Lane Group and dated February 4, 2015
Unnamed Tributary ¿ Hahn Reach Stream Restoration and Riparian Buffer Establishment Project, Plan Sheets 1-20, prepared and submitted on behalf of the applicant by Carter Land and Water Design, LLC and dated November 11, 2014
Permit Application NAO-2015-00183 (Royal Oak Close) dated 10-12-2015 submitted by Kimley Horn
Pungo Ferry Bridge Fender System Repairs dated April 30, 2010 by Clark Nexsen
Structure Inspection Report - Figure 1- Field Notes dated 12-28-2019 by Moffatt & Nichol
Proposed: Dredging; In: Dreary Cove; At: 1501 Cornwell Lane Virginia Beach, VA 23454; Application by: Alex and Andrea Bell dated September 15, 2014 by Waterfront Consulting Inc.
Skiffs Creek Upland Placement Interior Site Rehabilitation Plans for Construction Fort Eustis, Virginia, prepared by the Norfolk District Corps of Engineers dated June 30, 2014
Fiber Optic Communications Network for the Roanoke Valley Broadband Authority. Project Location Map Exhibits 1-A and 1-B; Flood Maps pages 1-21; Crossing Pictures for sites SC-1-SC-32; and Tables 1-3 showing site location data for site crossings SC-1 through SC-32, prepared and submitted on behalf of the applicant by Thompson and Litton and dated February 2015
Fairgrounds Streambank Restoration Preliminary Plan Set, Roanoke County, VA, prepared and submitted on behalf of the applicant by Gay and Neel, Inc. and Ecosystem Services and dated August 13, 2015
Murray Run Stream Restoration Preliminary Plan Set, Roanoke County, VA, prepared and submitted on behalf of the applicant by Gay and Neel, Inc. and Ecosystem Services dated August 13, 2015
¿Fiber Optic Communications Network for the Roanoke Valley Broadband Authority. Project Location Map Exhibits 1-A and 1-B¿ (attached)
¿Proposed: Pier, Additions, Boat Lift, and Roof, In: Lynnhaven River, At: 1708 River Court, Virginia Beach, Application By: Brant Feldman¿, dated February 6, 2018 and received by the Corps on March 12, 2018 from Waterfront Consulting, Inc.
¿Fairgrounds Streambank Restoration, Bland County Service Authority Community Wastewater Improvements Project, Figure 2; Cofferdam Detail Bland County Service Authority Community Wastewater Improvements Project Figure 3¿, prepared and submitted on behalf of the applicant by CHA Consulting, Inc., and dated April 2015
¿Project: Jakeman Ditch Improvements, Virginia Beach, VA¿ dated October 11, 2016 by Kimley-Horn and Associates, Inc.
¿Green Run Lake #2 Mechanical Dredging¿ Figures G-001, G-002, V-100, C-101-C-105, C-301,and C-501 dated April 25, 2016
¿WETLAND PERMIT GRAPHIC NI RIVER COMMERCIAL WATER AND SEWER EXTENSIONS ¿ SPOTSYLVANIA COUNTY, VIRGINIA¿ dated June 12, 2015 (enclosed)
¿Fauquier County Central Complex ¿ Impacts Map¿, with a final revision date of February 17, 2016 and submitted on your behalf by Timmons Group
¿Overall Wetland and WOUS Impact Map¿ prepared by Wetland Studies and Solutions, Inc. and dated June 2015 (Clevenger's Village/South Wales Water Connection)
¿Skiffs Creek Upland Placement Interior Site Rehabilitation Plans for Construction Fort Eustis, Virginia,¿ prepared by the Norfolk District Corps of Engineers dated June 30, 2014 and submitted on March 5, 2015.
¿For Eustis Entrance Culvert Replacement¿ prepared by Mr. James Dolan (Fort Eustis Pines Golf Course Culvert replacement)
¿Proposed: Pier, Additions, Boat Lift, and Roof, In: Lynnhaven River, At: 1708 River Court, Virginia Beach, Application By: Brant Feldman¿, dated February 6, 2018 (attached)
¿Tuckahoe Creek Park Phase I, Ridgefield Parkway to Old Coach Lane Section, Henrico County, Virginia¿ dated June 18, 2015 (prepared by VHB)
¿Riverbend Boat Ramp,¿ Sheets 1-9, prepared and submitted on behalf of the applicant by Anderson and Associates, Inc., and dated January 5, 2015
¿Riverbend Boat Ramp Supplemental Sketch 1, Ramp Section, Profile and Plan¿, dated April 23, 2015
¿Bluff City Boat Ramp,¿ Sheets 1-7 dated November 11, 2014 (on file with the Corps) and ¿Supplemental Sketch, Ramp Section, Profile, and Plan¿, dated April 23, 2015 prepared and submitted on behalf of the applicant by Anderson and Associates, Inc.
¿Kirk Pit¿ (dredged material disposal location) — referenced for Bennetts Creek Marina dredging
¿Proposed: Pier, Additions, Boat Lift, and Roof, In: Lynnhaven River, At: 1708 River Court, Virginia Beach, Application By: Brant Feldman¿ (project drawings) received March 12, 2018
Storck, VA USGS Quadrangle Map
BCG (Report and Map dated May 22, 2015)
"Virginia Natural Gas Laskin Road Relocation" by Kimley Horn dated April 2015
"Typical Plan and Profile for WVWA Field Operation Manhole Rehab Project"; "Cofferdam Crossing"; "Manhole 08A-1026-1029 Location Sketch and Cofferdam Limits WVWA, July 17, 2015" prepared and submitted by Western Virginia Water Authority and dated June 11, 2015
"Rutrough Cross Section"; "Rutrough Erosion Project with Length" prepared and submitted by William Tanger with the Virginia Recreation Facilities Authority and dated July 20, 2015
Figures 3-33 prepared by Townes Site Engineering and dated September 16, 2015
"Village at Caldwell Park, Hanover County, Virginia, Figure 5: Preliminary Jurisdictional Waters of the U.S. Impacts Map" dated September 23, 2015, prepared by Timmons
Outfall 001 Plan View and Crossectional View
Outfall 004 Plan View and Crossectional View
Water Country USA, Dive Show Erosion Repair Project, Proposed Conditions Map dated 10-9-2015 by VHB and Water Country USA
Dominion Warehouse - Waters of the U.S. Impacts Map
Impact Detail – Dominion Warehouse (prepared by Angler Environmental, revised on March 14, 2016)
Oaks of Stafford Sewage Pump Station, Stafford County Dept of Utilities, Civil Wetland Impacts (prepared by Hazen and Sawyer and dated October 2015)
Upper Powhatan Lake Dam Rehabilitation, Powhatan, Virginia (prepared by AMT dated March 11, 2016)
County of Henrico Department of Public Utilities, Western Area Trunk Sewer, I-64 Crossing, Plan and Profile & ESC Plan, Manhole SMH008875 to Manhole MH-2, STA 10+00 to STA 15+32 (dated June 2017) by AECOM