Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-01-15 Docket documentMay 2025 Memorandum on Clarification Regarding Application of Scope
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 16Download these results: CSV · JSON
Atlee Road Extension Hanover County, Virginia Drawing 6: Wetland Impacts Map - Topo, by Timmons Group, dated January 28, 2013
research reportNot linked to a paper · NAO-2011-01999-tmm (Atlee Road Extension) - description of impacts and drawing citation
U.S. Army Garrison, Directorate of Public Works, Fort AP Hill, Virginia, Renovation of Upper Travis Lake Dam and Control Structure, Sheets 1-9, dated February 2011
research reportNot linked to a paper · NAO-2011-02026 (MEB General Contractors Upper Lake Travis Dam) - referenced drawings dated February 2011
Woodstock Cove shoreline Stabilization, Figures 1-4, prepared and submitted on behalf of the applicant by Kerr Environmental Services Corp., dated August 5, 2014
research reportNot linked to a paper · NAO-2011-02370-nla (PCN-Woodstock Cove Park) - referenced drawings dated August 5, 2014
Rudee Loop Walkway Virginia Beach, VA, Figures 1-6, submitted on behalf of the City of Virginia Beach by Moffatt & Nichol, dated December 28, 2011
research reportNot linked to a paper · NAO-2011-02465-krd (Rudee Inlet - Rudee Loop Walkway) - plans dated December 28, 2011
¿Wetland Impact Location Map ¿ Over All Plan View (1-4) Warrenton Crossing¿, prepared by Bowman consulting an dated November, 2014.
research reportNot linked to a paper · NAO-2011-02598-arl (Warrenton Crossing)
The USFWS issued a Biological Opinion dated June 9, 2014 for the Roanoke Logperch
government reportNot linked to a paper · NAO-2012-00117-drc (Blacksburg Country Club / Roanoke Logperch)
¿Aviation Complex-Joint Base Langley-Eustis Soil Boring Pre-Construction Notification¿ prepared by HNTB and submitted on January 15, 2016.
research reportNot linked to a paper · NAO-2012-00031-man (Flight Concepts Division Compound at Fort Eustis)
¿Proposed Project for Erosion Control and Planting; For Keith and Dale Bangel, 3192 Adam Keeling Road, Virginia Beach, VA 23454,¿ Sheets 1-4, submitted on behalf of the applicants by Mid Atlantic Environmental L.L.C., dated October 19, 2011 and revised on January 25, 2012 and date stamped as received on January 17, 2012.
research reportNot linked to a paper · NAO-2012-00121-krd (Keith and Dale Bangel Living Shoreline)
These impacts are detailed on the enclosed drawings entitled Figure 1 ¿Stream Crossing Location Patrick Springs Phase 2 Water Extensions Project¿; figures 2, 3, 4, 5 ¿Plan and Profile Patrick Springs Water Extensions Phase 2¿; figure 6 ¿Directional Drill Detail¿ and figure 7 ¿Stream Crossing Detail¿, prepared and submitted on behalf of the applicant by Adams-Heath Engineering and dated October 23, 2011 and date stamped as received by this office on dated February 2, 2012 (attached).
research reportNot linked to a paper · NAO-2012-00236 (Patrick Springs Waterlines)
¿Frac-Out Contingency Plan For Horizontal Drilling (received May 11, 2012 from DLB, Inc)¿ prepared and submitted on behalf of the applicant by CHA Consulting, Inc, dated January 2012 and date stamped as received by this office on February 7, 2012 (on file at the Corps).
research reportNot linked to a paper · NAO-2012-00276-nla (Covington Phase II Sanitary Sewer Separation Project)
These impacts are detailed on the enclosed drawings entitled ¿Figure 1Location Map¿;v¿Figure 2 Cross Sections on North Fork Roanoke River¿; ¿Figure 3 Project Area Photographs¿, prepared and submitted on behalf of the applicant by Department of Game and Inland Fisheries and Blacksburg Country Club (not dated but received February 1, 2013) and date stamped as approved by this office on February 26, 2013 (attached).
research reportNot linked to a paper · NAO-2012-00117-drc (Blacksburg Country Club restoration)
These impacts are detailed on the enclosed drawings entitled ¿Cedar Creek Boulder Replacement,¿ Figures 1 and 2, prepared and submitted on behalf of the applicant by John Pound and dated April, 2012 and date stamped as received by this office on April 4, 2012 (attached).
research reportNot linked to a paper · NAO-2012-00728 (Cedar Creek Fish Structures)
These impacts are detailed on the enclosed drawings entitled ¿Pre-Construction Notification; Bow Creek Recreation Center¿ Figures 1-4, prepared and submitted on behalf of the applicant by Kimley-Horn and Associates, Inc. and dated May 7, 2012 and date stamped as received by this office on dated May 14, 2012 (attached).
research reportNot linked to a paper · NAO-2012-00603-krd (Bow Creek Recreation Center Stormwater Improvements)
¿Angel Rose Farm NRCS Wetland Mitigation sheets 1-9, and map WI, prepared and submitted on behalf of the applicant by Jon Roller / Ecosystem Services, dated 6/28/16 (attached).
research reportNot linked to a paper · NAO-2012-00371-SAF (Angel Rose Farm)
The Nature Conservancy CB-19 Dragon Run (Carlson), Mitigation/Restoration Plan, Gloucester County and King & Queen County, Virginia; sheets 1-10; prepared by Ecosystem Services, LLC, dated November 26, 2012 and revised May 28, 2013.
research reportNot linked to a paper · NAO-2012-01241 (fn near text)
Plan of Development, Tax Map43-A-6, Farm Pond, Caroline County, Virginia; Figures 1 and 3; prepared and submitted on your behalf by Webb and Associates; dated February 28, 2012 and revised July 9, 2012.
research reportNot linked to a paper · NAO-2012-01105 (fn near text)
Proposed Riprap Revetment and Sill, Francis R. White, Trust, Sheets 1 through 4; dated July 19, 2012.
research reportNot linked to a paper · NAO-2012-01559 (fn near text)
Hampton Roads Sanitation District, Virginia Initiative Plant; Figures 2-3, and 1-1, 1-2, 1-3 and 1-4; by HDR Engineering, Inc., dated August, 2012.
research reportNot linked to a paper · NAO-2012-01224 (fn near text)
Schematic Stream Restoration Design Plan, The Greens at Virginia Center, Henrico County, Virginia; prepared by Williamsburg Environmental Group; dated February 4, 2014.
research reportNot linked to a paper · NAO-2012-01555 (fn near text)
Jurisdictional Area Impacts Maps, Fines Corner Substation, Stafford County, Virginia; Sheet 1; prepared and submitted on behalf of the applicant by Williamsburg Environmental Group; dated November 12, 2012.
research reportNot linked to a paper · NAO-2012-01550 (fn near text)
Proposed 'Corduroy Farm Entrance Road, Mr. and Mrs. Mark Howland, 14103 Louisa Road, Louisa, Virginia 23093' Sheets 1 through 5; dated August 5, 2012.
research reportNot linked to a paper · NAO-2012-01700 (fn near text)
Proposed 'Impact map, Stafford Lakes Village, Regional Stormwater Pond 4A Expansion'; prepared and submitted on behalf of the applicant by Williamsburg Environmental Group, Inc.; dated August, 2012.
research reportNot linked to a paper · NAO-2012-01079 (fn near text)
Proposed 'The Nature Conservancy CB-19 Dragon Run (Carlson), Mitigation/Restoration Plan' (duplicate mention of Ecosystem Services, LLC plan sheets and dates).
research reportNot linked to a paper · NAO-2012-01241 (repeat location)
ARCADIS entitled, “16 VNGL A/C Mitigation, Erosion and Sediment Control Plan, Zinc Ribbon Installation in Hanover, New Kent, Charles City, James City, and York Counties and the Cities of Williamsburg and Newport News, Virginia”, dated and revised on May 2013, date stamped by this office on 6-13-13
research reportNot linked to a paper · NAO-2013-00189 (near “VNGL 35 miles”)
plans prepared by Angler entitled “Typical E&S Plan, Overhead Structure, Line 296, Halifax County, received by the Corps on January 11, 2013, and revision submitted on February 21, 2013”
research reportNot linked to a paper · NAO-2013-00187 (Transmission Line 296)
drawings prepared by Angler Environmental and dated January 29, 2013 entitled “Fredericksburg to Elmont Phase I Ariel and Soils Overview”
research reportNot linked to a paper · NAO-2013-00311 (Elmont Fiber Optic Replacement line)
drawings entitled “Lower Dam Repairs Tracen Yorktown” dated July 26, 2013 by U.S. Coast Guard Facilities Engineering Division
government reportNot linked to a paper · NAO-2013-00253 (USCG Training Center Yorktown)
“JOINT PERMIT APPLICATION DRAWINGS; Old Donation Creek SSD Neighborhood Dredging; Sheets 1-18,” dated October 30, 2013 and date stamped as received on October 31, 2013
research reportNot linked to a paper · NAO-2013-00619-krd (Old Donation Creek SSD Dredging Project)
drawings entitled “Proposed Riprap, Pier, Ramp, Lift for Joe Mantych at 1911 Clifton Road in Virginia Beach, VA” dated February 22, 2013
research reportNot linked to a paper · NAO-2013-00443-man (Mantych waterfront improvements)
plans entitled “Proposed Fixed Dock, Gangway & Floating Dock; Application By: Chesapeake Bay Foundation,” dated April 2013 and date stamped as received by this office on May 15, 2013
research reportNot linked to a paper · NAO-2013-00809-krd (CBF Pier & Mooring Piles)
drawings entitled “Proposed Boat Roof and Boat Lift, Preston Hummer, 22 Marlborough Point Road, Stafford, Virginia 22554” date stamped March 18, 2013 (enclosed with application)
research reportNot linked to a paper · NAO-2013-00532 (Preston Hummer)
drawings entitled “Bruton High School Pump Station and Force Main Replacement,” dated February 8, 2013 and date stamped as received by this office on dated February 28, 2013
research reportNot linked to a paper · NAO-2013-00312-nla (Bruton High School Pump Station & Force Main Replacement)
drawings entitled “Fredericksburg to Elmont Phase I Aerial and Soils Overview,” Figures 1 through 15, prepared and submitted on behalf by Angler Environmental and dated January 29, 2013
research reportNot linked to a paper · NAO-2013-00311 (duplicate wording)
drawings entitled “Joint Permit Application Drawings; Old Donation Creek SSD Neighborhood Dredging; Sheets 1-18,” dated October 30, 2013 (duplicate appearance)
research reportNot linked to a paper · NAO-2013-00619-krd (duplicate)
drawings entitled “Lower Dam Repairs Tracen Yorktown” dated July 26, 2013 by U.S. Coast Guard Facilities Engineering Division (duplicate)
government reportNot linked to a paper · NAO-2013-00253 (duplicate)
drawings prepared by ARCADIS referenced in NAO-2013-00189 (same as first entry)
research reportNot linked to a paper · NAO-2013-00189 (duplicate)
Schnabel Engineering / Geotechnical Exploration Plan Submission, I-64 High Rise Bridge Project — Chesapeake, VA (Schnabel Project #17C1386), pages 14-45, prepared and submitted ... dated October 16, 2017
research reportNot linked to a paper · NAO-2013-01120-SAF (I-64 High Rise Bridge section)
Franklin County Western Virginia Water Authority Burnt Chimney Water Extension Plan and Profile, prepared and submitted on behalf of the applicant by Anderson and Associates, Inc., and dated June 21, 2013
research reportNot linked to a paper · NAO-2013-01185-drc (Burnt Chimney Water Extension section)
BALLENTRAYE SANITARY SEWER EXTENTION-WETLANDS JURISDICTIONAL AND IMPACT MAP prepared by Sullivan, Donahoe & Ingalls and dated 6-13-13
research reportNot linked to a paper · NAO-2013-01155-hjw (Ballentraye UGSS section)
Fredericksburg to Elmont, Phase II, Caroline and Hanover Counties, Virginia, Sheets 6-28, prepared and submitted by Angler Environmental and dated June 17, 2013
research reportNot linked to a paper · NAO-2013-01257-rdb (Elmont Fiber Optic Replacement Phase II section)
Proposed Replacement Bulkhead, Vogel, 1149 Riverdale Road, Rappahannock River, Richmond County — Figures 1-3, prepared and submitted by Bayshore Design and dated May 22, 2013
research reportNot linked to a paper · NAO-2013-01222-rdb (Vogel bulkhead section)
Proposed Riprap Sill, Deborah Dever, PO Box 574, Occoquan, Virginia 22125, Sheets 1 through 5, dated May 28, 2013
research reportNot linked to a paper · NAO-2013-01223-rdb (Dever Riprap sill and beach nourishment section)
AEP Smith Mountain Lake Recreation Sites Oak Grove Drive Boating Access Facility Site Improvement Plan Sheet C-104, prepared and submitted on behalf of the applicant by Wiley Wilson Inc., dated July 6, 2011
research reportNot linked to a paper · NAO-2013-01337-drc (AEP Boat Ramp / Oak Grove Drive section)
Suffolk Seaboard Coastline Trail, drawings entitled 'Suffolk Seaboard Coastline Trail' dated May 17, 2013 by Clark Nexsen
research reportNot linked to a paper · NAO-2013-01130-man (Seaboard Coastline Trail, Phase IV section)
Norfolk District's Regional Permit 19 (08-RP-19), referenced in multiple permit determinations (e.g., Deborah Dever project text cites compliance with Regional Permit 19)
government reportNot linked to a paper · Multiple entries (e.g., NAO-2013-01223-rdb Dever section)
Detailed Project Report and Environmental Assessment were completed in 2004 (Beaver Creek Dam modification; TVA)
government reportNot linked to a paper · NAO-2013-01254 (TVA Beaver Creek Dam modification section)
“ROUTE 1 SEWER IMPROVEMENTS — PROPOSED GRAVITY SANITARY SEWER” prepared by Whitman Requardt & Associates, LLP, dated March 2014 (Plates 1&2) and July 2014 (Plate 3 of 3).
research reportNot linked to a paper · NAO-2014-01027-hjw
“Ditch Maintenance Erosion and Sediment Control Plans for Adrian Circle Ditch, Hampton Virginia” sheets 1 through 4 stamped as received by the Corps on December 3, 2014.
research reportNot linked to a paper · NAO-2014-01076
“CREEK BANK STABILIZATION DETAIL - TEMPORARY IMPACT - OPEN CUT IMPACT AREA 1 AND 2” prepared by Townes Site Engineering, dated 6/4/14 and revised 8/4/14.
research reportNot linked to a paper · NAO-2014-01115-hjw
“Chesterfield County, Virginia, Ashton Creek, Force Main Replacement” prepared by Arcadis, dated May, 2016.
research reportNot linked to a paper · NAO-2014-01200-sbg
← PreviousNext →