Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
Atlee Road Extension Hanover County, Virginia Drawing 6: Wetland Impacts Map - Topo, by Timmons Group, dated January 28, 2013
U.S. Army Garrison, Directorate of Public Works, Fort AP Hill, Virginia, Renovation of Upper Travis Lake Dam and Control Structure, Sheets 1-9, dated February 2011
Woodstock Cove shoreline Stabilization, Figures 1-4, prepared and submitted on behalf of the applicant by Kerr Environmental Services Corp., dated August 5, 2014
Rudee Loop Walkway Virginia Beach, VA, Figures 1-6, submitted on behalf of the City of Virginia Beach by Moffatt & Nichol, dated December 28, 2011
¿Wetland Impact Location Map ¿ Over All Plan View (1-4) Warrenton Crossing¿, prepared by Bowman consulting an dated November, 2014.
The USFWS issued a Biological Opinion dated June 9, 2014 for the Roanoke Logperch
¿Aviation Complex-Joint Base Langley-Eustis Soil Boring Pre-Construction Notification¿ prepared by HNTB and submitted on January 15, 2016.
¿Proposed Project for Erosion Control and Planting; For Keith and Dale Bangel, 3192 Adam Keeling Road, Virginia Beach, VA 23454,¿ Sheets 1-4, submitted on behalf of the applicants by Mid Atlantic Environmental L.L.C., dated October 19, 2011 and revised on January 25, 2012 and date stamped as received on January 17, 2012.
These impacts are detailed on the enclosed drawings entitled Figure 1 ¿Stream Crossing Location Patrick Springs Phase 2 Water Extensions Project¿; figures 2, 3, 4, 5 ¿Plan and Profile Patrick Springs Water Extensions Phase 2¿; figure 6 ¿Directional Drill Detail¿ and figure 7 ¿Stream Crossing Detail¿, prepared and submitted on behalf of the applicant by Adams-Heath Engineering and dated October 23, 2011 and date stamped as received by this office on dated February 2, 2012 (attached).
¿Frac-Out Contingency Plan For Horizontal Drilling (received May 11, 2012 from DLB, Inc)¿ prepared and submitted on behalf of the applicant by CHA Consulting, Inc, dated January 2012 and date stamped as received by this office on February 7, 2012 (on file at the Corps).
These impacts are detailed on the enclosed drawings entitled ¿Figure 1Location Map¿;v¿Figure 2 Cross Sections on North Fork Roanoke River¿; ¿Figure 3 Project Area Photographs¿, prepared and submitted on behalf of the applicant by Department of Game and Inland Fisheries and Blacksburg Country Club (not dated but received February 1, 2013) and date stamped as approved by this office on February 26, 2013 (attached).
These impacts are detailed on the enclosed drawings entitled ¿Cedar Creek Boulder Replacement,¿ Figures 1 and 2, prepared and submitted on behalf of the applicant by John Pound and dated April, 2012 and date stamped as received by this office on April 4, 2012 (attached).
These impacts are detailed on the enclosed drawings entitled ¿Pre-Construction Notification; Bow Creek Recreation Center¿ Figures 1-4, prepared and submitted on behalf of the applicant by Kimley-Horn and Associates, Inc. and dated May 7, 2012 and date stamped as received by this office on dated May 14, 2012 (attached).
¿Angel Rose Farm NRCS Wetland Mitigation sheets 1-9, and map WI, prepared and submitted on behalf of the applicant by Jon Roller / Ecosystem Services, dated 6/28/16 (attached).
The Nature Conservancy CB-19 Dragon Run (Carlson), Mitigation/Restoration Plan, Gloucester County and King & Queen County, Virginia; sheets 1-10; prepared by Ecosystem Services, LLC, dated November 26, 2012 and revised May 28, 2013.
Plan of Development, Tax Map43-A-6, Farm Pond, Caroline County, Virginia; Figures 1 and 3; prepared and submitted on your behalf by Webb and Associates; dated February 28, 2012 and revised July 9, 2012.
Proposed Riprap Revetment and Sill, Francis R. White, Trust, Sheets 1 through 4; dated July 19, 2012.
Hampton Roads Sanitation District, Virginia Initiative Plant; Figures 2-3, and 1-1, 1-2, 1-3 and 1-4; by HDR Engineering, Inc., dated August, 2012.
Schematic Stream Restoration Design Plan, The Greens at Virginia Center, Henrico County, Virginia; prepared by Williamsburg Environmental Group; dated February 4, 2014.
Jurisdictional Area Impacts Maps, Fines Corner Substation, Stafford County, Virginia; Sheet 1; prepared and submitted on behalf of the applicant by Williamsburg Environmental Group; dated November 12, 2012.
Proposed 'Corduroy Farm Entrance Road, Mr. and Mrs. Mark Howland, 14103 Louisa Road, Louisa, Virginia 23093' Sheets 1 through 5; dated August 5, 2012.
Proposed 'Impact map, Stafford Lakes Village, Regional Stormwater Pond 4A Expansion'; prepared and submitted on behalf of the applicant by Williamsburg Environmental Group, Inc.; dated August, 2012.
Proposed 'The Nature Conservancy CB-19 Dragon Run (Carlson), Mitigation/Restoration Plan' (duplicate mention of Ecosystem Services, LLC plan sheets and dates).
ARCADIS entitled, “16 VNGL A/C Mitigation, Erosion and Sediment Control Plan, Zinc Ribbon Installation in Hanover, New Kent, Charles City, James City, and York Counties and the Cities of Williamsburg and Newport News, Virginia”, dated and revised on May 2013, date stamped by this office on 6-13-13
plans prepared by Angler entitled “Typical E&S Plan, Overhead Structure, Line 296, Halifax County, received by the Corps on January 11, 2013, and revision submitted on February 21, 2013”
drawings prepared by Angler Environmental and dated January 29, 2013 entitled “Fredericksburg to Elmont Phase I Ariel and Soils Overview”
drawings entitled “Lower Dam Repairs Tracen Yorktown” dated July 26, 2013 by U.S. Coast Guard Facilities Engineering Division
“JOINT PERMIT APPLICATION DRAWINGS; Old Donation Creek SSD Neighborhood Dredging; Sheets 1-18,” dated October 30, 2013 and date stamped as received on October 31, 2013
drawings entitled “Proposed Riprap, Pier, Ramp, Lift for Joe Mantych at 1911 Clifton Road in Virginia Beach, VA” dated February 22, 2013
plans entitled “Proposed Fixed Dock, Gangway & Floating Dock; Application By: Chesapeake Bay Foundation,” dated April 2013 and date stamped as received by this office on May 15, 2013
drawings entitled “Proposed Boat Roof and Boat Lift, Preston Hummer, 22 Marlborough Point Road, Stafford, Virginia 22554” date stamped March 18, 2013 (enclosed with application)
drawings entitled “Bruton High School Pump Station and Force Main Replacement,” dated February 8, 2013 and date stamped as received by this office on dated February 28, 2013
drawings entitled “Fredericksburg to Elmont Phase I Aerial and Soils Overview,” Figures 1 through 15, prepared and submitted on behalf by Angler Environmental and dated January 29, 2013
drawings entitled “Joint Permit Application Drawings; Old Donation Creek SSD Neighborhood Dredging; Sheets 1-18,” dated October 30, 2013 (duplicate appearance)
drawings entitled “Lower Dam Repairs Tracen Yorktown” dated July 26, 2013 by U.S. Coast Guard Facilities Engineering Division (duplicate)
drawings prepared by ARCADIS referenced in NAO-2013-00189 (same as first entry)
Schnabel Engineering / Geotechnical Exploration Plan Submission, I-64 High Rise Bridge Project — Chesapeake, VA (Schnabel Project #17C1386), pages 14-45, prepared and submitted ... dated October 16, 2017
Franklin County Western Virginia Water Authority Burnt Chimney Water Extension Plan and Profile, prepared and submitted on behalf of the applicant by Anderson and Associates, Inc., and dated June 21, 2013
BALLENTRAYE SANITARY SEWER EXTENTION-WETLANDS JURISDICTIONAL AND IMPACT MAP prepared by Sullivan, Donahoe & Ingalls and dated 6-13-13
Fredericksburg to Elmont, Phase II, Caroline and Hanover Counties, Virginia, Sheets 6-28, prepared and submitted by Angler Environmental and dated June 17, 2013
Proposed Replacement Bulkhead, Vogel, 1149 Riverdale Road, Rappahannock River, Richmond County — Figures 1-3, prepared and submitted by Bayshore Design and dated May 22, 2013
Proposed Riprap Sill, Deborah Dever, PO Box 574, Occoquan, Virginia 22125, Sheets 1 through 5, dated May 28, 2013
AEP Smith Mountain Lake Recreation Sites Oak Grove Drive Boating Access Facility Site Improvement Plan Sheet C-104, prepared and submitted on behalf of the applicant by Wiley Wilson Inc., dated July 6, 2011
Suffolk Seaboard Coastline Trail, drawings entitled 'Suffolk Seaboard Coastline Trail' dated May 17, 2013 by Clark Nexsen
Norfolk District's Regional Permit 19 (08-RP-19), referenced in multiple permit determinations (e.g., Deborah Dever project text cites compliance with Regional Permit 19)
Detailed Project Report and Environmental Assessment were completed in 2004 (Beaver Creek Dam modification; TVA)
“ROUTE 1 SEWER IMPROVEMENTS — PROPOSED GRAVITY SANITARY SEWER” prepared by Whitman Requardt & Associates, LLP, dated March 2014 (Plates 1&2) and July 2014 (Plate 3 of 3).
“Ditch Maintenance Erosion and Sediment Control Plans for Adrian Circle Ditch, Hampton Virginia” sheets 1 through 4 stamped as received by the Corps on December 3, 2014.
“CREEK BANK STABILIZATION DETAIL - TEMPORARY IMPACT - OPEN CUT IMPACT AREA 1 AND 2” prepared by Townes Site Engineering, dated 6/4/14 and revised 8/4/14.
“Chesterfield County, Virginia, Ashton Creek, Force Main Replacement” prepared by Arcadis, dated May, 2016.