Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
¿HOFD Ashville Park, LLC¿ dated February 2, 2019 and updated on April 23, 2019 by Kimley Horn
Northlake IV Wetland Impact Area by Burns and McDonnell dated January 28, 2016
Elbow Road Ditch and Shoulder Improvements, AC# 10-1014-00 (duplicate phrasing)
Summer Lake Development Chesterfield County, Virginia, Overall Plan by Townes Site Engineering (dated August 7, 2012; last revised February 11, 2018)
Proposed Boat Lift; In: Long Creek; At: 2348 Leeward Shore Drive; Virginia Beach, VA; Application By: Jerry Fink; Sheets 1-3 (dated October 22, 2010)
Joint Permit Application Drawings, Marshview Park Master Plan Site by Kerr Environmental Services Corp. (dated April 18, 2013)
City of Hampton Buckroe Beach Re-Nourishment Project (drawings dated November 12, 2020)
SKIFFES CREEK, PROPOSED MAINTENANCE DREDGING, JAMES RIVER, VIRGINIA (dated April 30, 2012)
Figure 1 Site Development Plan Layout Map (Paradise Creek)
Figure 2 Site Development Plan - Dredge Management Unit Grading (Paradise Creek)
Figure 3 Cross Sections (Paradise Creek)
Figure1, Paradise Creek Mitigation-Construction Modification
Figure 2, Paradise Creek Mitigation-DMU 1A Grading
C-03, Typical SMU Cross Section (Paradise Creek)
Figure 3, Typical Details (Paradise Creek)
¿Rehabilitation of Runway/Taxiway Storm Drainage System, Chambers Field-naval Station Norfolk, Norfolk, VA¿ (N1-N11 & S1-S13)
¿Lakota Stream Restoration Phase II¿ (drawings)
¿Wetlands Impact Exhibit of Nimmo Quay for Kemp Del, Inc.¿ dated 6-05-2014 and revisions
¿Proposed Pier, Covered Slip, and Gazebo, Gilliam-Lot 10, Shores of York, York River-New Kent County¿ dated 11-18-2015 by Bayshore Design, LLC
Drawings titled ¿Nottoway Pump Station Phase II Flood Protection¿ figures Plates 1-4, prepared by Whitman, Requardt & Associates LLP and dated August 2010
Drawings titled ¿Route 58 Improvements, Prepared for City of Suffolk VA¿ Sheets 1-17, prepared by Kimley Horn and dated 9-14-2016
¿Midlothian Mines Park Stream Restoration, Proposed Stream Layout¿ dated July 2014 by VHB
¿Appendix VI, Cross Section 1, Stream Impact Map, ESC Project No. 17203¿ dated October 20, 2010 (Hayfield Quarry)
Drawings titled ¿Proposed Pier, Covered Slip, and Gazebo, Gilliam-Lot 10, Shores of York, York River-New Kent County¿ (Sheets 1-6) dated 11-18-2015 by Bayshore Design, LLC
Drawings titled ¿Rehabilitation of Runway/Taxiway Storm Drainage System, Chambers Field-naval Station Norfolk, Norfolk, VA¿ (N1-N11 & S1-S13) stamped received by the Norfolk District Regulatory on April 29, 2010
Drawings entitled, “Proposed Maintenance Dredging”, revision sheets # 1, 2, 4, 5, and 6 dated January 3, 2011 and revision sheet # 3 dated December 5, 2011; and drawings entitled, “Marine Railway #1 & #2 Dredging” revision sheets # G001, C101, C102, C103 dated November 1, 2011, and revisions “Railway #1” and “Railway # 2” dated February 14, 2012.
Drawings entitled "Figures 1a-4, Department of the Navy, Installation of Oyster Reef, Joint Expeditionary Base Little Creek Fort Story West, Virginia Beach, VA" date stamped as received by this office on January 19, 2010.
"2017 Proposed Oyster Reef Enhancement Site Locations Plans, Joint Expeditionary Base Little Creek" submitted on August 4, 2017 by NACFAC MIDLANT.
Drawings entitled “Site Plan to Accompany Joint Agency Permit Application For: Maintenance Dredging of Naval Station Norfolk, Norfolk, Virginia,” (on file with the Corps) by Naval Facilities Engineering Command- Mid Atlantic as approved by James S. Georgo, PE, dated October 10, 2010.
Drawings titled “Wetland and Stream Impacts” Sheets 1-32, prepared by HDR Engineering, Inc. and dated August 30, 2010 and December and stamped as received by this office on September 23, 2010 and December 22, 2010.
Plans entitled "Proposed Replacement Bulkhead, Pages 1-5" dated January 4, 2010 and date stamped as received by this office on January 6, 2010.
Coliseum Pressure Reducing Station & Off-Line Storage Facility, Wetlands Impact-Alternative 2, Figure C-3 dated April 2011 by RK&K
Glade Creek Sewer Interceptor Replacement, Town of Vinton, Enlarged Plan prepared by Anderson and Associates and dated February 12, 2010
Biological Opinion (BO) that was issued June 10, 2011 for the Town of Vinton Glade Creek Project
Sherwood Lakes Unauthorized Wetland Impacts dated April 19, 2012 and Revised September 12, 2012
Proposed Project for Erosion Control; Application By: Nicholas Wright 103 Ridge Road Virginia Beach, VA 23451; Sheets 1-3 dated August 15, 2010
"Proposed: Bulkhead, Fill & Pier; In: Porters Island Inlet; At: 321 Pike Circle Virginia Beach, VA 23456; Application By: Robert F. and Linda C. Brendli; Sheets 1-6" dated October 13, 2010
"Project Location: Lake Smith; For: William Scott Sr; 1328 Smith Cove Circle Virginia Beach, VA 23455-6832; Proposed Riprap & Pier; Sheets 1-7" dated September 29, 2010
"Proposed Project for Erosion Control; Application By: Nicholas Wright 103 Ridge Road Virginia Beach, VA 23451; Sheets 1-3" dated August 15, 2010
Virginia Erosion & Sediment Control Handbook
USGS Topography Map, Roanoke VA
The Service sent the Biological Opinion to the Corps dated June 22, 2012
"Proposed Bridge Phase 1" prepared by Mattern and Craig Inc., dated February 12, 2010
"Vicinity Map-City of Roanoke"; "Proposed Bridge"; "Proposed Bridge Phase 2"; "Proposed Bridge Profile"; "Upland Disturbance" prepared by Mattern and Craig Inc., dated February 12, 2010
"Capital One West Creek, Waters of the U.S. Authorized Impacts Overview Map, Goochland County, Virginia" dated February 15, 2019 (prepared by RES)
"Wetland Exhibit Huckleberry Trail Extension" figures 1 and 2 and 3 drawn by Draper Aden, dated June 13, 2012
"Stream Crossing 1 Huckleberry Trail Extension"; "Stream Crossing 2 Huckleberry Trail Extension"; "Stream Crossing Detail" prepared by Draper Aden and Associates, dated August 8, 2011
Figures titled "SML Location Map" and "Sites 1 Bull Run; Site 2 Bull Run; Site 3 Little Bull Run; ..." prepared by Bass Federation Nation and received March 6, 2012
"IMPACT SUMMARY" dated August 12, 2011 (attached drawings)
The ¿Wythe County Water and Sewer Study¿ (1995) by Anderson & Associates, Inc.