Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
a drawing prepared by North Woods Engineering entitled, "Site Plan of Area to be Disturbed", drawing no. C10-A, dated June 7, 2019
Overall Plan for DCWWA Greenfield Sewer Rehabilitation, prepared by KC Engineering and Land Surveying, last revised December 12, 2019
plans entitled, "Waterfront Improvements 14 Pryer Lane Larchmont, NY 10538", prepared by RACE Coastal Engineering, dated January 23, 2019 and revised May 21, 2019
The specific applicant-provided details are as shown on the attached permit drawings, titled "Marguerite Strauss", dated May 16, 2019, prepared by DKR Shores Inc.
The regulated work is shown on plans entitled, "Lowe’s Home Centers, Inc. 1065 Curtis Bridge Road Wilkesboro, NC 28697", prepared by Solli Engineering, and dated May 13, 2019, revised June 18, 2019
"Areas to be Affected by Army Corps of Engineers Restrictive Covenant at Town of Chesterfield Water Treatment Plant", dated April 19, 2021, prepared by AES Northeast
"Water Treatment Plan Upgrades & Wells – Revised Wetland Disturbance, Drawing No. SK-002, dated April 6, 2021, prepared by AES Northeast"
Submittal entitled "Haverstraw Recreation Complex" by Hammer Land Engineering, dated March 4, 2020 and revised April 8, 2020
Plans entitled, "Seawall Reconstruction 31 Shore Road Pelham Manor, NY 10803", dated November 4, 2019, certified on November 8, 2019, and prepared by RACE Coastal Engineering
Permit drawings, titled "Lamoretti Residence", dated April 24, 2019, prepared by Dietrich Engineering, P.C.
Submittals entitled "Wetland Restoration, Teatown Lake Reservation", prepared by Willingham Engineering and Restaino Design PC, last revised May 6, 2020
Rosgen in the 2014 River Stability Field Guide
USFS Aquatic Organism Passage methodology
"AuSable Forks Flood Barrier", sheet nos. C-1, C-2 and C-3, prepared by Schoder Rivers Associates, and dated August 22, 2019, and last revised May 8, 2020
"Dormitory Authority of the State of New York Design of Milton Road Drainage Improvements Rye, New York 10580" by Ramboll, dated 05 MAY 2020 and last revised 12 JUN 2020
"Rehabilitation of Dams Various Park Facilities, Wampus Lake Reservoir Dam" by Paul C Rizzo Engineering PLLC, dated April 3, 2020
"New York Athletic Club Maintenance Dredging" by RACE Coastal Engineering dated September 3, 2019
"Peekskill Hollow Road Improvements" by Barton & Loguidice, dated March 2020
"Rehabilitation of Two Bronx River Parkway Bridges Over the Bronx River" by KS Engineering, P.C. dated May 26, 2020
"Bayonne Bridge Rehabilitation of Falcon Nesting Tower" by the Port Authority of New York and New Jersey, dated May 13, 2020
"Unnamed Tributary to Mahwah River Pipeline Exposure, Millennium Pipeline Co., LLC 24" Natural Gas Pipeline" by Bergmann, dated June 18, 2020
"Remediation Early Works Design, COPR Site 131, NJDEP P.I. No. G000008748, Kearny, Hudson County, NJ, Project No. MR1573S, Sheets 1-11" drawn by Geosyntec Consultants, dated January 2021, Revision 1- April 2021, Revision 2 - May 2021, digitally signed by William M. Steiner on May 19, 2021
"Drake Avenue Siphon Chamber: Project Plan" by Arcadis Design & Consultancy last revised July 13, 2020
"Nancy Turett Seawall Improvements" by Race Coastal Engineering, dated June 15, 2020 and last revised August 17, 2020
"Millennium Pipeline..." submittal entitled indicating "Unnamed Tributary to Mahwah River Pipeline Exposure" by Bergmann, dated June 18, 2020
"Rebuild by Design: Living with the Bay-East Rockaway High School Bulkhead"
"Dormitory Authority of the State of New York Design of Milton Road Drainage Improvements Rye, New York 10580" (Ramboll submittal)
"James Caples Park Parking Lot Reconstruction, Amityville, New York" by Nelson, Pope & Voorhis LLC, dated May 2020
"Exhibit 3, Proposed Grading Plan for Filling Under Nationwide Permit #18, Block 108.04, Lot 4, East Rutherford, Bergen County, N.J." dated May 11, 2012, last revised August 13, 2020, prepared by George D. Cascino, Professional Engineer and Planner
"Exhibit 2, Conceptual Site Plan of Proposed Residential Development, Block 108.04, Lot 4, East Rutherford, Bergen County, New Jersey", dated February 18, 2010, last revised April 20, 2012, prepared by George D. Cascino
"Lower Raritan Center 2019 Aerial Imagery Map", dated February 14, 2020; and "Figure 1 Lower Raritan Center Vicinity Map Block 395 Lots 37 and 3-B, Edison Township, Middlesex County, New Jersey", dated February 24, 2020; and "Preliminary and Final Site Plan, Block 395, Lot 37, Permitting/Regulatory Plan — Overall (Waterfront), Sheet 1 of 1", and seven drawings "Permitting/Regulatory Plan (Waterfront), Sheets 1 through 7", prepared by Princeton Hydro, LLC, dated January 24, 2018 and last revised May 15, 2019
"Wetland Disturbance Plan for Hyman Located in Village of Wesley Hills Rockland County, New York", prepared by Paul Gdanski, PE, PLLC, dated June 1, 2020, last revised October 6, 2020
"Bowman Pond Clearing Design, 239 Bowman Ave, Purchase, NY 10577" by O’Brien & Gere Engineers, Inc., dated 21 AUG 2020
"Lake Suzanne Dam Rehabilitation Project," prepared by WSP USA, dated November 24, 2020
"Wildflower Studios" prepared by Bjarke Ingels Group, dated June 26, 2020 and last revised November 20, 2020
"Locust Avenue Sewer Modifications Contract No. 14-031-EF (CON 98228)" by Charles A. Manganaro Engineering, dated July 25, 2019 and last revised March 24, 2020
"DPW Project #20-010 Marina Bulkhead Repair," prepared by M.G. McLaren Engineering & Land Surveying, P.C., dated July 15, 2020
"Watchtower Bible and Tract Society of New York, Inc. Stone Bridge Repairs," prepared by McLaren Engineering Group, dated July 24, 2020 and last revised August 07, 2020
Submittal entitled "James Caples Park Parking Lot Reconstruction, Amityville, New York" by Nelson, Pope & Voorhis LLC, dated May 2020 (duplicate listing reflected in text)
Submittals entitled by First Coastal (e.g., "Michael Labadorf 612 Dune Road, Westhampton, NY" and multiple similar living shoreline submittals), dated June 24, 2019, last revised July 9, 2020, prepared by First Coastal
Submittal entitled, "Wetland Map", prepared by Brett L. Steenburgh, P.E. PLLC, last revised January 6, 2020; and "Wetland Impact/Mitigation Plan", Sheet no. 1 of 1, prepared by Brett L. Steenburgh, P.E. PLLC, last revised December 1, 2020 (submitted Sept 18, 2020 and Dec 2, 2020)
"Preliminary and Final Site Plan, Block 395, Lot 37, Permitting/Regulatory Plan — Overall (Waterfront), Sheet 1 of 1" and seven drawings "Permitting/Regulatory Plan (Waterfront), Sheets 1 through 7", prepared by Princeton Hydro, LLC, dated January 24, 2018 and last revised May 15, 2019 (duplicate grouping from Garden State Buildings LP description)
"Lower Raritan Center 2019 Aerial Imagery Map" dated February 14, 2020 (from Garden State Buildings LP submittal)
Hampton Roads Crossing Study. Proposed SEIS is to evaluate new information regarding resource impacts and alternatives described in the March 2001 FEIS and June 2001 Record of Decision (ROD)
June 2001 Record of Decision (ROD)
AECOM Figure 3, Sampling Points Location Map, dated November 2011.
"HRBT Expansion Project Benthic Survey Benthic Infauna Sites 1 Through 10, Sheets 2-6, dated May 2017"
"Regional Location Map"; "Project Location Map"; "HRBT Location Map, Sheet 1, dated March 2017"
Elbow Road Ditch and Shoulder Improvements, Environmental Impact Exhibit, Sheets 1 through 6 by the City of Chesapeake, Public Works (final revision date of February 4, 2014)
Elbow Road Ditch and Shoulder Improvements, AC# 10-1014-00 by the City of Chesapeake, Public Works, dated 9-23-2013