Economic Analysis
Original sourcePDF (833 KB)Attachment (116 KB)Attachment (279 KB)Attachment (330 KB)Attachment (326 KB)Attachment (549 KB)Attachment (788 KB)Attachment (237 KB)Attachment (437 KB)Attachment (918 KB)Attachment (200 KB)Attachment (220 KB)Attachment (128 KB)Attachment (153 KB)Attachment (271 KB)Attachment (3.7 MB)Attachment (2.3 MB)Attachment (5.3 MB)Attachment (316.1 MB)Attachment (58 KB)Attachment (612 KB)
Other documents for the same rulemaking (all, by stage)
References: 2,490 extracted, 505 linked to papers
1987 Corps Manual, 3-parameter approach
Virginia Institute of Marine Science (VIMS) mapping
The Chesapeake Bay National Estuarine Research Reserve conducts valuable long term monitoring on Monie Creek
Lawhon & Associates, Inc. (L&A) completed a jurisdictional waters and isolated wetlands delineation
Sawmill Creek Watershed Assessment Report (See overall Sawmill Creek Design Report for additional information)
overall Sawmill Creek Design Report
plans entitled ‘Rockland Avenue Outfall Stream Channel Extension City of Portland, Maine by Woodard & Curran 41 Hutchins Drive Portland, Maine’
2012 Iso New England Regional System Plan
Vineyard Wind FEIS
2016 Eversource Best Management Practices for Connecticut and Massachusetts
Alternatives Analysis for Stamford WTP ABW Filter Building Retrofit for Centrifuge and Chemical Delivery
2016 Eversource BMPs for Connecticut and Massachusetts
Proposed Pier, Ramp, and Floating Dock in Port Chester Harbor as 23 Shore Drive, Village of Port Chester, Westchester County, New York — prepared by John Hilts, dated 8 February 2017; and plans dated 8 February 2018, revised 14 June 2017
Amawalk Dam Ogee Spillway Replacement of Spillway Approach Walls
Rehabilitation of Tuckahoe Road Bridge (BIN #3364940) Over the Bronx River City of Yonkers & Village of Tuckahoe, New York — dated May 22, 2017
Base Map "Existing Plan and Profile of Lower Manitou Station Road" and "Preliminary Plan of Lower Manitou Station Road," prepared by Stantec, revised October 18, 2017
Shoreline Enhancement for Avalon Bay Communities Development, City of Yonkers, Westchester County, New York — dated September 2, 2016
"Edge-on-Hudson Shoreline Repair Project Sleepy Hollow, NY" — dated April 26, 2017
"Site Plan - Pond Maintenance Project" (undated)
"Palumbo Sand & Gravel Pond Sections"
"Mining Plan (excerpt) Palumbo Sand and Gravel Proposed Dredging Project," revised September 13, 2017
"Pond Maintenance Project Narrative," pages 1 and 2, prepared by Roy T. Budnik & Associates, Inc., revised July 21, 2017
Clarence Fahnestock Memorial SP - Canopus Lake (drawings), dated March 27, 2017
Clarence Fahnestock Memorial SP - Upper Canopus benthic mat configuration, dated March 10, 2017
"Amawalk Dam Ogee Spillway Replacement of Spillway Approach Walls" (duplicate listing of the Amawalk submittal)
Submittals entitled "Maybrook II Bikeway Phase B Town of Southeast," drawings nos. WDP-1, WDP-2, WDP-3, WDP-4, WDP-5, WDP-6, and TYP-1, prepared by WSP, dated January 2018
Submittals entitled "CVEC Wetland Impact and Status", pages 1-4, received by our office on September 6, 2017
"Cricket Valley Energy - Figure 1 - Generating Facility Location"; "Cricket Valley Energy - Figure 3"; "Cricket Valley Energy - Figure 3 cont." prepared by ARCADIS, undated
"Plan 1 - Existing Conditions Survey of Property," sheets 1 and 2, prepared by Zarecki & Associates, LLC, revised March 17, 2012
"Plan 2 - General Arrangement Plot Plan Study," prepared by Burns and Roe Enterprises, Inc., revised August 4, 2010
"Plan 3 - Preliminary Site Plan," prepared by the Chazen Companies, revised August 10, 2012
"Plan 4 - Conceptual Subsurface Sewage Disposal System and Stormwater Management Plan," prepared by the Chazen Companies, revised April 24, 2012
"Plan 5 - Existing Wetland and Future Work Limits"; "Plan 5 cont. - Wetland Area W2-A Restoration Plan"; and "Plan 5 cont. - Planting Area Plan," prepared by ARCADIS, dated April 2011
"Figure 5 - Temporary Wetland Impacts Along Transmission Line ROW - Plan View", sheets 1-7 and "Figure 6 - Temporary Wetland Impacts Along Transmission Line ROW - Cross-Sectional View", sheets 1 and 2, dated April 2014
Submittals received by this office on December 21, 2015, including the drawings prepared by the New York City Transit Authority entitled "207th Street Yard Site Plan" dated as stamped
"Flower and Sons Aquaculture Operations Location Map."
Proposed Pier Foundation Repairs long Island Sound, City of Rye, County of Westchester, State of New York, dated December 7, 2017 and revised April 26, 2018, prepared by BTMI Engineering, P.C.
Clove Brook Culvert Replacement, 225 Chestnut Ridge Road, Millbrook NY 12534, sheets 1-3, prepared by TJ Engineering, LLC, revised March 1, 2018
Central Hudson EF Transmission Line Rebuild — Corps of Engineers Wetland Impacts, drawings nos. V100-V104, prepared by Chazen Engineering, Land Surveying, & Landscape Architecture Co., D.P.C., revised March 15, 2018
Dearborn Avenue Wall Repair, Rye Town Beach, Town of Rye, New York, dated November 28, 2017, prepared by Grossfield Macri Consulting Engineers
(three attached sheets prepared by) Dolph Rotfeld Engineering (attached to 'Dearborn Avenue Wall Repair' plans)
Continental Building Products 350 Broadway, Buchanan, New York 10511, plans dated April 17, 2018 and revised June 11, 2018
Losee Shoreline Stabilization, plans dated January 26, 2018
"Proposed Drainage and Irrigation Pond Improvements Pelham Country Club 940 Wynnewood Road Pelham Manor, New York", prepared by WSP, dated November 1, 2018, revised April 2, 2019
"Wetland Mitigation Plans", prepared by JD Barrett and Associates, dated June 11, 2019
a subsequent submittal entitled "Freshkills Park-North Park Phase 1", prepared by Langan, dated February 1, 2016 and January 14, 2019
"Freshkills North Park Phase 1-Draft Conceptual Compensatory Mitigation Plan" prepared by AKRF and dated March 24, 2020
plans entitled, "Brooklyn Cruise Terminal 12 Substructure Rehabilitation at Atlantic Basin, NYC Economic Development Corp., Buttermilk Channel, Brooklyn, Kings County, New York", prepared by Maser Consulting, dated September 27, 2017 and revised July 25, 2019
subsequent submittals entitled, "Prepared For: Weber Projects III, LLC, PO Box 688, Beacon, NY 12508," prepared by Hudson Land Design Professional Engineering, revised July 18, 2019
drawings entitled, "Gore Mountain Reservoir Expansion, Town of Johnsburg, Warren County, NY 12843", drawing nos. L-1.0 – L-7.3, prepared by the LA Group, all last revised on January 16, 2020