Policy Replication

Economic Analysis

Regulatory impact analysis2026-01-15 · EPA · economic_analysis · EPA-HQ-OW-2025-2929-0009
RIN 2040-AG47 · Docket EPA-HQ-OW-2025-2929

Other documents for the same rulemaking (all, by stage)

2026-01-15 Federal RegisterUpdating the Water Quality Certification Regulations
2026-01-15 Docket documentDocumentation of E.O. 12866 Review
2026-01-15 Docket documentPrior Federal Register Notices
2026-01-15 Docket documentLegislative History
2026-01-15 Docket documentMeeting Tracker and Outreach
2026-01-15 Docket documentClean Water Act Section 401(a)(2) Federal Agency Notification
2026-01-15 Docket documentTribes Approved for Treatment as a State (TAS) USEPA
2026-01-15 Docket documentICR Supporting Statement
2026-01-15 Docket documentWater Quality Improvement Act, Pub. L. No. 91-224, § 21(b)(1), 84 Stat. 91 (1970)
2026-01-15 Docket documentPrior Regulations
2026-02-19 Docket documentCWA 401 Public Meeting Transcripts Cover Page

References: 2,490 extracted, 505 linked to papers

Page 12Download these results: CSV · JSON
Level 1 Report generated by the NHR review
otherNot linked to a paper · MVS-2014-00625 (Shively performed an initial T&E review...)
ISMM worksheets
otherNot linked to a paper · MVS-2015-00266 (Martin Family Lake - "The compensatory mitigation plan was ran through the ISMM worksheets")
NERC Alert FAC-008
web pageNot linked to a paper · MVS-2015-00281 (Ameren Makanda GT... "As part of Ameren’s response plan to North American Reliability Corporation (NERC) Alert FAC-008")
DeLong Landscape Architecture’s Stream Bank Protection drawing updated March 15, 2106
otherNot linked to a paper · MVS-2014-00718 (299 Clarkson - American Eagle Credit Union)
Hyland Green Development, L.L.C. March 31, 2004
otherNot linked to a paper · top of document (first paragraph)
formal mitigation plan submitted on February 13, 2017
otherNot linked to a paper · top of document (first paragraph)
Wildhorse Riverworks plan sheets dated March 11, 2016
research reportNot linked to a paper · Creek 8 / LPSTP #1 and #2 stabilization areas (first paragraph)
2016 Waverly Lake Watershed TMDL and Implementation Plan
research reportNot linked to a paper · Bergschneider Bank Stabilization (Woods Creek) (MVS-2017-00845)
Missouri Stream Mitigation Method
research reportNot linked to a paper · Land Learning Foundation Big Creek Site (MVS-2017-00868)
Illinois Plant Manual prepared by NRCS
research reportNot linked to a paper · Murphysboro New Wastewater Treatment Road (MVS-2017-00899)
Letter of recommendations and construction design standards, dated September 13, 2017 (Brad Pobst, Missouri Department of Conservation)
otherNot linked to a paper · Little White Water Creek Construct Weirs / Frissell Bank Stabilization (MVS-2017-00679)
NRCS design specifications
research reportNot linked to a paper · Bergschneider Bank Stabilization (Woods Creek) (MVS-2017-00845)
Restoration Site Management Plan dated February 2019
research reportNot linked to a paper · MVS-2018-00676 (Doe Run Scoggins Branch)
Sediment Trap Plans dated May 2019
research reportNot linked to a paper · MVS-2018-00676 (Doe Run Scoggins Branch)
Interim Corrective Measure Scoggins Branch Remediation and Confirmation Sampling Work Plan Addendum
research reportNot linked to a paper · MVS-2018-00676 (Doe Run Scoggins Branch)
September 18, 2018 report
research reportNot linked to a paper · MVS-2018-00676 (Doe Run Scoggins Branch)
compensatory mitigation plan dated December 5, 2019
research reportNot linked to a paper · MVS-2018-00482 (McClintock Farm Drainage Ditch & Berm Improvements)
compensatory mitigation plan dated January 9, 2018
research reportNot linked to a paper · MVS-2019-00066 (Ostendorf Wetland Mitigation)
Standards and Specification for Erosion and Sediment Control
otherNot linked to a paper · MVS-2018-00694 (Replace Culverts Trib To Lost Cr IL RT 50)
ERNST seeds FACW Meadow Mix ERNMX-122
web pageNot linked to a paper · Wetland crossings description (Bluestone pipeline paragraph)
Grain size distribution analysis by Oberry Engineering, Inc dated 8/26/11 for the dredge area
research reportNot linked to a paper · NAB-2011-61435-M18 (Laura Jacobsen/Dredging) — near text describing dredge 14' x 100' channel in Severn
underwater reprot by Pennoni Associates, Inc. (Sept. 26, 2011)
research reportNot linked to a paper · fn 1 (Derry Township underpinning / EP-22-12-103 section)
Ulster, PA US Geological Survey (USGS) 7.5-minute quadrangle
datasetNot linked to a paper · NAB-2012-01988-PA (2nd Street South Bridge Replacement Project)
Flood Insurance Study for the Borough of Hummelstown, PA, Dauphin County dated September 1976
government reportNot linked to a paper · NAB-2012-01730-PA (890 West Main Street Replacement)
Ulster, PA United States Geological Survey (USGS) 7.5-minute quadrangle
datasetNot linked to a paper · NAB-2012-02595-PA (Ulster, PA USGS 7.5-minute quadrangle)
DEP Erosion and Sediment Pollution Control Program Manual
government reportNot linked to a paper · NAB-2012-03014-PA (reference to DEP Erosion and Sediment Pollution Control Program Manual)
Hydraflow Express
otherNot linked to a paper · NAB-2012-03251-PA (use of Hydraflow Express in calculating design flows)
PennDOT Publication 72M
government reportNot linked to a paper · NAB-2012-03143-PA (BMP's will reference PennDOT Publication 72M)
PennDOT Publication 464
government reportNot linked to a paper · NAB-2012-03181-PA (work to be performed in accordance to PennDOT Publication 464)
USDA, NRCS specifications
government reportNot linked to a paper · NAB-2012-02917-PA (work performed according to USDA, NRCS specifications)
PFBC specifications
government reportNot linked to a paper · NAB-2012-02927-PA (work will follow PFBC specifications)
PNDI
datasetNot linked to a paper · multiple entries (e.g., NAB-2012-02599-PA and many others) (PNDI search results referenced)
AASHTO No. 57 stone
otherNot linked to a paper · NAB-2012-02630-PA (reference to AASHTO No. 57 stone)
Magnolia Stormwater Management Retrofit, dated April 2012, Sheets 1 through 4
research reportNot linked to a paper · NAB-2012-60848-M22
Magnolia Stormwater Management Retrofit, 95% Design Submittal, dated December 21, 2012, Sheets 1 through 13
research reportNot linked to a paper · NAB-2012-60848-M22
Sykesville, MD U.S. Geological Survey (USGS) 7.5-mintue topograpic quadrangle map
datasetNot linked to a paper · Columbia Gas Transmission, LLC/Line MB Replacement Project (NAB-2013-60416-M02) - "Sykesville, MD U.S. Geological Survey (USGS) 7.5-mintue topograpic quadrangle map"
Pub 464
otherNot linked to a paper · PA DOT - SR 3006, Seg 10, Off 289 over South Branch of Cordorus Creek (NAB-2013-02477-PA) - "we will be following Pub 464 for E and S"
MPA-Poplar Island-Paul S Sarbanes Environmental Restoration Project
research reportNot linked to a paper · MPA-Poplar Island-Paul S Sarbanes Environmental Restoration Project (NAB-2013-60487-M13)
South River Watershed Assessment completed by Anne Arundel County Department of Public Works
research reportNot linked to a paper · fn NAB-2013-61526-M37 (AA DPW/Bacon Ridge Rd/Stream Restoration) and NAB-2013-61484-M37 (AA DPW/Dividing Creek/Stream Restoration/TMDL) nearest mentions
the great Anacostia watershed TMDL nutrient and sediment reduction plan for Prince George's County
government reportNot linked to a paper · fn NAB-2013-61310-M30 (PG DER/FORDHAM STREET)
Dorsey Center/Deep Run Stream Mitigation ¿ Final Mitigation Plan 2015-61093 Dated: 6/17/2020
research reportNot linked to a paper · NAB-2015-61093-M02
Google Earth
web pageNot linked to a paper · NAB-2016-60392-M18 (Muise entry) · cited link
Maryland Department of Natural Resources - MERLIN
datasetNot linked to a paper · NAB-2016-60392-M18 (Muise entry) · cited link
NOAA – EFH Mapper
web pageNot linked to a paper · NAB-2016-60392-M18 (Muise entry) · cited link
Chesapeake Bay Total Maximum Daily Load initiative
government reportNot linked to a paper · Multiple stream restoration entries (e.g., NAB-2016-60068-M15, NAB-2016-60087-M15) · cited link
Clean Water Partnership
web pageNot linked to a paper · NAB-2016-60837-M03 (Muirkirk Pond entry) · cited link
Phase II Nontidal Wetland and Stream Advanced Mitigation Plans dated July 5, 2016
research reportNot linked to a paper · NAB-2016-60669-M30 (Green Vest, Beltsville Ag. Research Cntr entry)
Chesapeake Bay Trust-Maryland Department of the Environment Nontidal Wetland Grant Program dated July 21, 2016
web pageNot linked to a paper · NAB-2016-60669-M30 (Green Vest, Beltsville Ag. Research Cntr entry)
U.S. EPA Rapid Bioassessment Protocols
otherNot linked to a paper · NAB-2018-61067 (crellin wireless tower)
Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Eastern Mountains & Piedmont
government reportNot linked to a paper · NAB-2018-61067 (crellin wireless tower)
← PreviousNext →