Modernizing Reactor Licensing, Safety Oversight, and Siting Practices
Federal Register2026-07-16 · NUCLEAR REGULATORY COMMISSION · Proposed Rule · 2026-14341
Proposed rule and guidance; request for comment.
Consistent with Executive Order 14300, "Ordering the Reform of the Nuclear Regulatory Commission," the U.S. Nuclear Regulatory Commission (NRC) is conducting a review and wholesale revision of its regulations. This proposed rule aims to modernize reactor licensing, safety oversight, and siting practices addressing sections 5(f), 5(h), and 5(i) of Executive Order 14300, and additional items that contribute to adding additional generation to the electrical grid. Additionally, as part of the NRC's overarching review of all of its regulations, the agency identified a number of further changes to the NRC's regulations that will improve the efficiency and efficacy of its licensing process that are also included in this rulemaking.
Original sourceXML (1.1 MB)PDF (2.1 MB)
Other documents for the same rulemaking (all, by stage)
References: 113 extracted, 0 linked to papers
Page 1Download these results: CSV · JSON
NUREG-0800, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition”
government reportNot linked to a paper · V. Background—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.233, “Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors,” dated June 2020
government reportNot linked to a paper · IV.A. Definition of Construction
DG-1454, “Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments”
government reportNot linked to a paper · II. Executive Order 14300; V. Background—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.183, “Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors”
government reportNot linked to a paper · VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.76, “Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants”
government reportNot linked to a paper · VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.221, “Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants”
government reportNot linked to a paper · VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.208, “A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion”
government reportNot linked to a paper · VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments
RG 1.174, Revision 3, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,” dated January 2018
government reportNot linked to a paper · XI.A. Use of Quantitative Risk Results
DG-1466, draft Revision 4 to RG 1.187, “Guidance for Implementation of 10CFR50.59, `Changes, Tests, And Experiments.'”
government reportNot linked to a paper · XII.A. Use of Quantitative Risk Results
ISO 19443, “Quality management systems—Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety [ITNS],” (2018-05)
otherNot linked to a paper · XVI.A. Introduction and Scope
IEEE Standard 308, “IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations”
otherNot linked to a paper · VII. Background—Removal of IEEE-323-1974 Reference in Footnote 3 of 10 CFR 50.49
ASME Nuclear Quality Assurance (NQA)-1, “Quality Assurance Requirements for Nuclear Facility Applications”
otherNot linked to a paper · XVI.C. General Requirements
SECY-23-0061, “Clarification of the Staff's Position on Certain American Society of Mechanical Engineers Code Alternatives for More Than One 10-Year Inservice Inspection Interval Under Title 10 of the Code of Federal Regulations 50.55a,” dated July 21, 2023
government reportNot linked to a paper · X. Discussion—Expanded Alternative Requests Under 10 CFR 50.55a(z)
SECY-17-0075, “Planned Improvements in Design Certification Tiered Information Designations,” dated July 24, 2017
government reportNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
SECY-19-0034, “Improving Design Certification Content,” dated April 8, 2019
government reportNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
SECY-22-0052, “Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66),” dated June 6, 2022
government reportNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
SRM-SECY-22-0052, “Staff Requirements—SECY-22-0052—Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66),” dated November 20, 2024
government reportNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors,” dated June 6, 2012
government reportNot linked to a paper · XXI.C. Severe Accidents
“10 CFR part 52 Construction Lessons Learned Report,” issued January 16, 2024
government reportNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
Draft industry guideline developed by the Nuclear Energy Institute (NEI), dated May 27, 2015
otherNot linked to a paper · XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications
FDA-2021-D-0980; November 17, 2023 (guidance centered on credibility assessments)
government reportNot linked to a paper · XI.B. Background—Risk-Informing 10 CFR 50.59 and Allowing Flexibility for Changes to Methods
NUREG/CR-7285, “Nonradiological Health Consequences from Evacuation and Relocation,” issued September 2021
research reportNot linked to a paper · XXIII.B
NUREG-0396, “Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants,” dated December 1978
government reportNot linked to a paper · XXIII.B
NUREG/CR-7160, “Emergency Preparedness Significance Quantification Process: Proof of Concept,” dated June 2013
research reportNot linked to a paper · XXIV.B
Task 1.5-1.6 Report to User Need Request NSIR-2017-002, “Analyses Informing Emergency Planning Zone Size Determinations: Identification of Parameter Sensitivities,” dated December 2019
research reportNot linked to a paper · XXIV.B
SAND2022-3706, “Scoping Analysis of MACCS Modeling Improvements for the Study of Protective Action Recommendations, dated March 2022
research reportNot linked to a paper · XXIV.B
SAND2025-08913, “Dose Exceedance Distance Sensitivity Based on Parametric Uncertainty,” dated July 2025
research reportNot linked to a paper · XXIV.B
NUREG-1437, “Generic Environmental Impact Statement for License Renewal of Nuclear Plants,” (LR GEIS), Revision 1, issued June 2013
government reportNot linked to a paper · XXIV.B
NUREG-0654/FEMA-REP-1, Supplement 3, “Guidance for Protective Action Strategies,”
government reportNot linked to a paper · XXIV.C
NUREG/CR-7002, “Criteria for Development of Evacuation Time Estimate Studies,” Revision 1
research reportNot linked to a paper · XXIV.C
EPA, “PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents,” issued in 2017
government reportNot linked to a paper · XXIV.B
IAEA Safety Standards in General Safety Requirements (GSR) No. 7, “Preparedness and Response for a Nuclear or Radiological Emergency,”
government reportNot linked to a paper · XXIV.B
NEI white paper, “The Economic Benefits and Challenges with Utilizing Increased Enrichment and Fuel Burnup for Light-Water Reactors,” (referenced February 2019)
research reportNot linked to a paper · XXXV.B
WASH-1248, “Environmental Survey of the Uranium Fuel Cycle,” issued April 1974
government reportNot linked to a paper · XXXV.B
NUREG-0116, “Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle: A Task Force Report,” Supplement 1 to WASH-1248, issued October 1976
government reportNot linked to a paper · XXXV.B
WASH-1238, “Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants,” issued December 1972
government reportNot linked to a paper · XXXV.B
NUREG-75/038, Supplement 1, “Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants,” issued April 1975
government reportNot linked to a paper · XXXV.B
NUREG-2191, “Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report,” (referenced as draft interim staff guidance LR-ISG-2026-01)
government reportNot linked to a paper · XXXII.A
NUREG-1430, NUREG-1431, NUREG-1432, NUREG-1433, NUREG-1434, NUREG-2194 (Standard Technical Specifications documents referenced collectively)
government reportNot linked to a paper · XXXV.C.(i)
ICRP Publication 109, “Application of the Commission's Recommendations for the Protection of People in Emergency Exposure Situations,” issued in 2009
otherNot linked to a paper · ## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions
IAEA 2024 guidance, “Portable Digital Assistant for First Responders to a Radiological Emergency: Emergency worker turn-back dose guidance,”
government reportNot linked to a paper · ## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions
NCRP Report No. 180, “Management of Exposure to Ionizing Radiation: Radiation Protection Guidance for the United States,” 2018
research reportNot linked to a paper · ## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions
RG 8.29, Revision 1, “Instruction Concerning Risks from Occupational Radiation Exposure,”
government reportNot linked to a paper · ## Modern Health Physics and Radiation Epidemiology Knowledge
NUREG-0713, Volume 43, “Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities,” published in 2021
government reportNot linked to a paper · ## Modern Health Physics and Radiation Epidemiology Knowledge
NUREG-0933, “Resolution of Generic Safety Issues,” issued September 2021
government reportNot linked to a paper · ## (a) 10 CFR 50.46 and Fuel Dispersal
NUREG-2121, “Fuel Fragmentation, Relocation, and Dispersal During the Loss-of-Coolant Accident,” issued March 2012
government reportNot linked to a paper · ## (a) 10 CFR 50.46 and Fuel Dispersal
NUREG/CR-7307, “Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors,”
government reportNot linked to a paper · ## (a) 10 CFR 50.46 and Fuel Dispersal
NUREG/CR-6967, “Cladding Embrittlement during Postulated Loss-of-Coolant Accidents,” dated July 31, 2008
government reportNot linked to a paper · ## 2. Major Research Findings Cladding Embrittlement
NUREG/CR-7219, “Cladding Behavior During Postulated Loss-of-Coolant Accidents,”
government reportNot linked to a paper · ## i. Hydrogen-Enhanced Beta-Layer Embrittlement
NUREG-2119, “Mechanical Behavior of Ballooned and Ruptured Cladding,”
government reportNot linked to a paper · ## iii. Determining the Ongoing Validity of the Transition Break Size