Regulatory Analysis for the Proposed Rule Modernizing reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44

Regulatory impact analysis2026-07-16 · NRC · regulatory_analysis · NRC-2025-0975-0012
RIN 3150-AL44 · Docket NRC-2025-0975

Other documents for the same rulemaking (all, by stage)

2026-07-16 Federal RegisterModernizing Reactor Licensing, Safety Oversight, and Siting Practices
2026-07-16 Docket documentUnofficial Redline Rule Language for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44
2026-07-16 Docket documentDG-1454 Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments Proposed New Regulatory Guide 1.269
2026-07-16 Docket documentDraft Environmental Assessment for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44
2026-07-27 Federal RegisterModernizing Reactor Licensing, Safety Oversight, and Siting Practices; Correction

References: 13 extracted, 0 linked to papers

Page 1Download these results: CSV · JSON
NUREG/CR-1508, “Evaluation of the Cost Effects on Nuclear Power Plant Construction Resulting from the Increase in Seismic Design Level,” April 1981 (ML19352A293).
research reportNot linked to a paper · References
NUREG/CR-3568, “A Handbook for Value-Impact Assessment,” December 1983 (ML062830096).
research reportNot linked to a paper · References
NUREG-1829, “Estimating Loss-of-Coolant Accident (LOCA) Frequencies Through the Elicitation Process,” April 2008 (ML082250436).
research reportNot linked to a paper · References
NUREG-1903, “Seismic Considerations for the Transition Break Size,” February 2008 (ML080880140).
research reportNot linked to a paper · References
Vogtle ESP (ESP-004) (NRC, 2009) (ML092290157).
government reportNot linked to a paper · References
“Regulatory Analysis: Risk-Informed Changes to Loss-of-Coolant Accident Technical Requirements,” December 29, 2010 (ML103230250).
research reportNot linked to a paper · References
NUREG/BR-0058, draft Revision 5, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory Commission,” January 2020 (NRC, 2020) (ML19261A277).
government reportNot linked to a paper · Section 3.1; References
DG-1263, Revision 1 (RG 1.224), “Establishing Analytical Limits for Zirconium-Alloy Cladding Material,” 2026 (ML24304A946).
government reportNot linked to a paper · References
BLS, 2024. “May 2024 National Industry Specific Occupational Employment and Wage Estimates;" NAICS 221100—Electric Power Generation, Transmission, and Distribution' and 221113—Nuclear Electric Power Generation, U.S. Department of Labor, April 2024, https://www.bls.gov/oes/2024/may/oessrci.htm.
datasetNot linked to a paper · References; Section 3.2.3 · cited link
Electric Power Research Institute, 2022. “Leveraging Risk Insights for Aging Management Program Implementation,” Electric Power Research Institute Report 300202071, April 2022.
research reportNot linked to a paper · References; Table 20
NEI, 2023a. “The Future of Nuclear Power: 2023 Baseline Survey – White Paper,” 2023, Available at https://www.nei.org/getContentAsset/15e265de-2b75-47c6-9d68-2d0535ead359/8d8ff8d6-b2ae-401b-a63c-f6b108e809d2/The-Future-of-Nuclear-Power-2023-Baseline-Survey.pdf?language=en-US.
web pageNot linked to a paper · Section 3.2.2; References · cited link
NEI, 2023b. “Nuclear Costs in Context,” 2023, Available at https://www.nei.org/resources/reports-briefs/nuclear-costs-in-context.
web pageNot linked to a paper · References; Section 4.2 · cited link
Energy Information Administration. U.S. Nuclear Statistics. 2021. Available online at: https://www.eia.gov/energyexplained/nuclear/data-and-statistics.php