{"document":{"doc_id":81622,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices","date":"2026-07-16","url":"https://www.federalregister.gov/documents/2026/07/16/2026-14341/modernizing-reactor-licensing-safety-oversight-and-siting-practices","source_native_id":"2026-14341","status":"fetched","abstract":"Consistent with Executive Order 14300, \"Ordering the Reform of the Nuclear Regulatory Commission,\" the U.S. Nuclear Regulatory Commission (NRC) is conducting a review and wholesale revision of its regulations. This proposed rule aims to modernize reactor licensing, safety oversight, and siting practices addressing sections 5(f), 5(h), and 5(i) of Executive Order 14300, and additional items that contribute to adding additional generation to the electrical grid. Additionally, as part of the NRC's overarching review of all of its regulations, the agency identified a number of further changes to the NRC's regulations that will improve the efficiency and efficacy of its licensing process that are also included in this rulemaking.","action":"Proposed rule and guidance; request for comment."},"dockets":["NRC-2025-0975"],"rins":["RIN 3150-AL44"],"related":[{"doc_id":87725,"source":"ria","org":"NRC","doc_type":"regulatory_analysis","title":"Regulatory Analysis for the Proposed Rule Modernizing reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":127298,"source":"docket_item","org":"NRC","doc_type":"review_record","title":"Unofficial Redline Rule Language for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":162683,"source":"docket_item","org":"NRC","doc_type":"other","title":"DG-1454 Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments Proposed New Regulatory Guide 1.269","date":"2026-07-16"},{"doc_id":162685,"source":"docket_item","org":"NRC","doc_type":"other","title":"Draft Environmental Assessment for the Proposed Rule Modernizing Reactor Licensing Safety Oversight and Siting Practices NRC-2025-0975 RIN 3150-AL44","date":"2026-07-16"},{"doc_id":81590,"source":"fr_rule","org":"NUCLEAR REGULATORY COMMISSION","doc_type":"Proposed Rule (administrative)","title":"Modernizing Reactor Licensing, Safety Oversight, and Siting Practices; Correction","date":"2026-07-27"}],"references":[{"citation_id":540198,"raw_reference":"NUREG-0800, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"NUREG-0800, \"Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition\"","cited_venue":"NUREG (NRC)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"V. Background—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540199,"raw_reference":"RG 1.233, “Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors,” dated June 2020","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2020","cited_title":"RG 1.233, \"Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"IV.A. Definition of Construction","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540200,"raw_reference":"DG-1454, “Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"DG-1454, \"Implementation of Determinate and Data-Backed Thresholds for Reactor Safety Assessments\"","cited_venue":"NRC Draft Guidance","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"II. Executive Order 14300; V. Background—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540201,"raw_reference":"RG 1.183, “Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"RG 1.183, \"Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540202,"raw_reference":"RG 1.76, “Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"RG 1.76, \"Design-Basis Tornado and Tornado Missiles for Nuclear Power Plants\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540203,"raw_reference":"RG 1.221, “Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"RG 1.221, \"Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540204,"raw_reference":"RG 1.208, “A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"RG 1.208, \"A Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"VI. Discussion—Determinate and Data-Backed Thresholds for Reactor Safety Assessments","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540205,"raw_reference":"RG 1.174, Revision 3, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,” dated January 2018","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2018","cited_title":"RG 1.174, Revision 3, \"An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis\"","cited_venue":"NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XI.A. Use of Quantitative Risk Results","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540206,"raw_reference":"DG-1466, draft Revision 4 to RG 1.187, “Guidance for Implementation of 10CFR50.59, `Changes, Tests, And Experiments.'”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"DG-1466, draft Revision 4 to RG 1.187, \"Guidance for Implementation of 10CFR50.59, `Changes, Tests, And Experiments.'\"","cited_venue":"NRC Draft Guidance","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XII.A. Use of Quantitative Risk Results","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540207,"raw_reference":"ISO 19443, “Quality management systems—Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety [ITNS],” (2018-05)","cited_authors":"International Organization for Standardization (ISO)","cited_year":"2018","cited_title":"ISO 19443, \"Quality management systems—Specific requirements for the application of ISO 9001:2015 by organizations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety [ITNS]\"","cited_venue":"ISO Standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"XVI.A. Introduction and Scope","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540208,"raw_reference":"IEEE Standard 308, “IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations”","cited_authors":"Institute of Electrical and Electronics Engineers (IEEE)","cited_year":null,"cited_title":"IEEE Standard 308, \"IEEE Standard Criteria for Class 1E Power Systems for Nuclear Power Generating Stations\"","cited_venue":"IEEE Standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"VII. Background—Removal of IEEE-323-1974 Reference in Footnote 3 of 10 CFR 50.49","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540209,"raw_reference":"ASME Nuclear Quality Assurance (NQA)-1, “Quality Assurance Requirements for Nuclear Facility Applications”","cited_authors":"American Society of Mechanical Engineers (ASME)","cited_year":null,"cited_title":"ASME NQA-1, \"Quality Assurance Requirements for Nuclear Facility Applications\"","cited_venue":"ASME Standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"XVI.C. General Requirements","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540210,"raw_reference":"SECY-23-0061, “Clarification of the Staff's Position on Certain American Society of Mechanical Engineers Code Alternatives for More Than One 10-Year Inservice Inspection Interval Under Title 10 of the Code of Federal Regulations 50.55a,” dated July 21, 2023","cited_authors":"U.S. Nuclear Regulatory Commission (NRC staff)","cited_year":"2023","cited_title":"SECY-23-0061, \"Clarification of the Staff's Position on Certain American Society of Mechanical Engineers Code Alternatives for More Than One 10-Year Inservice Inspection Interval Under Title 10 of the Code of Federal Regulations 50.55a\"","cited_venue":"NRC SECY paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"X. Discussion—Expanded Alternative Requests Under 10 CFR 50.55a(z)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540211,"raw_reference":"SECY-17-0075, “Planned Improvements in Design Certification Tiered Information Designations,” dated July 24, 2017","cited_authors":"U.S. Nuclear Regulatory Commission (NRC staff)","cited_year":"2017","cited_title":"SECY-17-0075, \"Planned Improvements in Design Certification Tiered Information Designations\"","cited_venue":"NRC SECY paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540212,"raw_reference":"SECY-19-0034, “Improving Design Certification Content,” dated April 8, 2019","cited_authors":"U.S. Nuclear Regulatory Commission (NRC staff)","cited_year":"2019","cited_title":"SECY-19-0034, \"Improving Design Certification Content\"","cited_venue":"NRC SECY paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540213,"raw_reference":"SECY-22-0052, “Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66),” dated June 6, 2022","cited_authors":"U.S. Nuclear Regulatory Commission (NRC staff)","cited_year":"2022","cited_title":"SECY-22-0052, \"Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66)\"","cited_venue":"NRC SECY paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540214,"raw_reference":"SRM-SECY-22-0052, “Staff Requirements—SECY-22-0052—Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66),” dated November 20, 2024","cited_authors":"Nuclear Regulatory Commission (Commission SRM)","cited_year":"2024","cited_title":"SRM-SECY-22-0052, \"Staff Requirements—SECY-22-0052—Proposed Rule: Alignment of Licensing Processes and Lessons Learned from New Reactor Licensing (RIN 3150-AI66)\"","cited_venue":"NRC Staff Requirements Memorandum","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540215,"raw_reference":"SECY-12-0081, “Risk-Informed Regulatory Framework for New Reactors,” dated June 6, 2012","cited_authors":"U.S. Nuclear Regulatory Commission (NRC staff)","cited_year":"2012","cited_title":"SECY-12-0081, \"Risk-Informed Regulatory Framework for New Reactors\"","cited_venue":"NRC SECY paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.C. Severe Accidents","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540216,"raw_reference":"“10 CFR part 52 Construction Lessons Learned Report,” issued January 16, 2024","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2024","cited_title":"10 CFR part 52 Construction Lessons Learned Report","cited_venue":"NRC report","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540217,"raw_reference":"Draft industry guideline developed by the Nuclear Energy Institute (NEI), dated May 27, 2015","cited_authors":"Nuclear Energy Institute (NEI)","cited_year":"2015","cited_title":"Draft industry guideline (first principles for developing Tier 1 information and a set of standard ITAAC)","cited_venue":"NEI draft guideline","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"XXI.B. Licensing Experience and Improvement Initiatives Regarding Information Designation and Change Processes for Design Certifications","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540218,"raw_reference":"FDA-2021-D-0980; November 17, 2023 (guidance centered on credibility assessments)","cited_authors":"U.S. Food and Drug Administration","cited_year":"2023","cited_title":"FDA-2021-D-0980 (guidance centered on credibility assessments)","cited_venue":"FDA guidance docket","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XI.B. Background—Risk-Informing 10 CFR 50.59 and Allowing Flexibility for Changes to Methods","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540219,"raw_reference":"NUREG/CR-7285, “Nonradiological Health Consequences from Evacuation and Relocation,” issued September 2021","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2021","cited_title":"Nonradiological Health Consequences from Evacuation and Relocation","cited_venue":"NUREG/CR-7285","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIII.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540220,"raw_reference":"NUREG-0396, “Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants,” dated December 1978","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"1978","cited_title":"Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants","cited_venue":"NUREG-0396","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXIII.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540221,"raw_reference":"NUREG/CR-7160, “Emergency Preparedness Significance Quantification Process: Proof of Concept,” dated June 2013","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2013","cited_title":"Emergency Preparedness Significance Quantification Process: Proof of Concept","cited_venue":"NUREG/CR-7160","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540222,"raw_reference":"Task 1.5-1.6 Report to User Need Request NSIR-2017-002, “Analyses Informing Emergency Planning Zone Size Determinations: Identification of Parameter Sensitivities,” dated December 2019","cited_authors":null,"cited_year":"2019","cited_title":"Analyses Informing Emergency Planning Zone Size Determinations: Identification of Parameter Sensitivities","cited_venue":"Task 1.5-1.6 Report to User Need Request NSIR-2017-002","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540223,"raw_reference":"SAND2022-3706, “Scoping Analysis of MACCS Modeling Improvements for the Study of Protective Action Recommendations, dated March 2022","cited_authors":"Sandia National Laboratories","cited_year":"2022","cited_title":"Scoping Analysis of MACCS Modeling Improvements for the Study of Protective Action Recommendations","cited_venue":"SAND2022-3706","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540224,"raw_reference":"SAND2025-08913, “Dose Exceedance Distance Sensitivity Based on Parametric Uncertainty,” dated July 2025","cited_authors":"Sandia National Laboratories","cited_year":"2025","cited_title":"Dose Exceedance Distance Sensitivity Based on Parametric Uncertainty","cited_venue":"SAND2025-08913","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540225,"raw_reference":"NUREG-1437, “Generic Environmental Impact Statement for License Renewal of Nuclear Plants,” (LR GEIS), Revision 1, issued June 2013","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"2013","cited_title":"Generic Environmental Impact Statement for License Renewal of Nuclear Plants","cited_venue":"NUREG-1437 (LR GEIS), Revision 1","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540226,"raw_reference":"NUREG-0654/FEMA-REP-1, Supplement 3, “Guidance for Protective Action Strategies,”","cited_authors":"U.S. Nuclear Regulatory Commission and Federal Emergency Management Agency","cited_year":null,"cited_title":"Guidance for Protective Action Strategies (Supplement 3 to NUREG-0654/FEMA-REP-1)","cited_venue":"NUREG-0654/FEMA-REP-1 Supplement 3","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXIV.C","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540227,"raw_reference":"NUREG/CR-7002, “Criteria for Development of Evacuation Time Estimate Studies,” Revision 1","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Criteria for Development of Evacuation Time Estimate Studies","cited_venue":"NUREG/CR-7002, Revision 1","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXIV.C","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540228,"raw_reference":"EPA, “PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents,” issued in 2017","cited_authors":"U.S. Environmental Protection Agency","cited_year":"2017","cited_title":"PAG Manual: Protective Action Guides and Planning Guidance for Radiological Incidents","cited_venue":"EPA Manual","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540229,"raw_reference":"IAEA Safety Standards in General Safety Requirements (GSR) No. 7, “Preparedness and Response for a Nuclear or Radiological Emergency,”","cited_authors":"International Atomic Energy Agency","cited_year":null,"cited_title":"Preparedness and Response for a Nuclear or Radiological Emergency","cited_venue":"IAEA GSR No. 7","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXIV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540230,"raw_reference":"NEI white paper, “The Economic Benefits and Challenges with Utilizing Increased Enrichment and Fuel Burnup for Light-Water Reactors,” (referenced February 2019)","cited_authors":"Nuclear Energy Institute (NEI)","cited_year":"2019","cited_title":"The Economic Benefits and Challenges with Utilizing Increased Enrichment and Fuel Burnup for Light-Water Reactors","cited_venue":"NEI white paper","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXXV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540231,"raw_reference":"WASH-1248, “Environmental Survey of the Uranium Fuel Cycle,” issued April 1974","cited_authors":null,"cited_year":"1974","cited_title":"Environmental Survey of the Uranium Fuel Cycle","cited_venue":"WASH-1248","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540232,"raw_reference":"NUREG-0116, “Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle: A Task Force Report,” Supplement 1 to WASH-1248, issued October 1976","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"1976","cited_title":"Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle: A Task Force Report","cited_venue":"NUREG-0116 (Supplement 1 to WASH-1248)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540233,"raw_reference":"WASH-1238, “Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants,” issued December 1972","cited_authors":null,"cited_year":"1972","cited_title":"Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants","cited_venue":"WASH-1238","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540234,"raw_reference":"NUREG-75/038, Supplement 1, “Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants,” issued April 1975","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":"1975","cited_title":"Environmental Survey of Transportation of Radioactive Materials to and from Nuclear Power Plants","cited_venue":"NUREG-75/038, Supplement 1","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXV.B","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540235,"raw_reference":"NUREG-2191, “Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report,” (referenced as draft interim staff guidance LR-ISG-2026-01)","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report","cited_venue":"NUREG-2191","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXII.A","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540236,"raw_reference":"NUREG-1430, NUREG-1431, NUREG-1432, NUREG-1433, NUREG-1434, NUREG-2194 (Standard Technical Specifications documents referenced collectively)","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Standard Technical Specifications—various (NUREG-1430, -1431, -1432, -1433, -1434) and NUREG-2194","cited_venue":"NUREG series","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXV.C.(i)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540237,"raw_reference":"ICRP Publication 109, “Application of the Commission's Recommendations for the Protection of People in Emergency Exposure Situations,” issued in 2009","cited_authors":"ICRP","cited_year":"2009","cited_title":"Application of the Commission's Recommendations for the Protection of People in Emergency Exposure Situations","cited_venue":"ICRP Publication 109","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540238,"raw_reference":"IAEA 2024 guidance, “Portable Digital Assistant for First Responders to a Radiological Emergency: Emergency worker turn-back dose guidance,”","cited_authors":"IAEA","cited_year":"2024","cited_title":"Portable Digital Assistant for First Responders to a Radiological Emergency: Emergency worker turn-back dose guidance","cited_venue":"IAEA guidance","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540239,"raw_reference":"NCRP Report No. 180, “Management of Exposure to Ionizing Radiation: Radiation Protection Guidance for the United States,” 2018","cited_authors":"NCRP","cited_year":"2018","cited_title":"Management of Exposure to Ionizing Radiation: Radiation Protection Guidance for the United States","cited_venue":"NCRP Report No. 180","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"## Scientific Recommendations for Radiation Protection for Worker and Regulations Under Accident and Emergency Conditions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540240,"raw_reference":"RG 8.29, Revision 1, “Instruction Concerning Risks from Occupational Radiation Exposure,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Instruction Concerning Risks from Occupational Radiation Exposure","cited_venue":"Regulatory Guide 8.29, Revision 1","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## Modern Health Physics and Radiation Epidemiology Knowledge","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540241,"raw_reference":"NUREG-0713, Volume 43, “Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities,” published in 2021","cited_authors":"U.S. NRC","cited_year":"2021","cited_title":"Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities","cited_venue":"NUREG-0713, Volume 43","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## Modern Health Physics and Radiation Epidemiology Knowledge","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540242,"raw_reference":"NUREG-0933, “Resolution of Generic Safety Issues,” issued September 2021","cited_authors":"U.S. NRC","cited_year":"2021","cited_title":"Resolution of Generic Safety Issues","cited_venue":"NUREG-0933","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (a) 10 CFR 50.46 and Fuel Dispersal","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540243,"raw_reference":"NUREG-2121, “Fuel Fragmentation, Relocation, and Dispersal During the Loss-of-Coolant Accident,” issued March 2012","cited_authors":"U.S. NRC","cited_year":"2012","cited_title":"Fuel Fragmentation, Relocation, and Dispersal During the Loss-of-Coolant Accident","cited_venue":"NUREG-2121","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (a) 10 CFR 50.46 and Fuel Dispersal","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540244,"raw_reference":"NUREG/CR-7307, “Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors","cited_venue":"NUREG/CR-7307","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (a) 10 CFR 50.46 and Fuel Dispersal","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540245,"raw_reference":"NUREG/CR-6967, “Cladding Embrittlement during Postulated Loss-of-Coolant Accidents,” dated July 31, 2008","cited_authors":"U.S. NRC / Argonne program contributors","cited_year":"2008","cited_title":"Cladding Embrittlement during Postulated Loss-of-Coolant Accidents","cited_venue":"NUREG/CR-6967","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## 2. Major Research Findings Cladding Embrittlement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540246,"raw_reference":"NUREG/CR-7219, “Cladding Behavior During Postulated Loss-of-Coolant Accidents,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Cladding Behavior During Postulated Loss-of-Coolant Accidents","cited_venue":"NUREG/CR-7219","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## i. Hydrogen-Enhanced Beta-Layer Embrittlement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540247,"raw_reference":"NUREG-2119, “Mechanical Behavior of Ballooned and Ruptured Cladding,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Mechanical Behavior of Ballooned and Ruptured Cladding","cited_venue":"NUREG-2119","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## iii. Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540248,"raw_reference":"ORNL/TM-2024/3350, “Scoping Studies on the Impacts of Increased Enrichment on Nuclear Criticality Safety,” May 2024","cited_authors":"Oak Ridge National Laboratory (ORNL)","cited_year":"2024","cited_title":"Scoping Studies on the Impacts of Increased Enrichment on Nuclear Criticality Safety","cited_venue":"ORNL/TM-2024/3350","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"## A. Criticality Accident Requirements in 10 CFR 50.68","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540249,"raw_reference":"RG 1.240, “Fresh and Spent Fuel Pool Criticality Analyses,” (issued March 2021)","cited_authors":"U.S. NRC","cited_year":"2021","cited_title":"Fresh and Spent Fuel Pool Criticality Analyses","cited_venue":"Regulatory Guide 1.240","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## A. Criticality Accident Requirements in 10 CFR 50.68","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540250,"raw_reference":"NEI 12-16, Revision 4, “Guidance for Performing Criticality Analyses of Fuel Storage at Light-Water Reactor Power Plants,” dated September 2019","cited_authors":"NEI (Nuclear Energy Institute)","cited_year":"2019","cited_title":"Guidance for Performing Criticality Analyses of Fuel Storage at Light-Water Reactor Power Plants","cited_venue":"NEI 12-16, Revision 4","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"## A. Criticality Accident Requirements in 10 CFR 50.68","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540251,"raw_reference":"NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors—Final Report,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Generic Environmental Impact Statement for Licensing of New Nuclear Reactors—Final Report","cited_venue":"NUREG-2249","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## B. Uranium Fuel Cycle Environmental Data—Table S-3 in 10 CFR 51.51","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540252,"raw_reference":"NUREG-2266, “Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels","cited_venue":"NUREG-2266","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## B. Uranium Fuel Cycle Environmental Data—Table S-3 in 10 CFR 51.51","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540253,"raw_reference":"WASH-1248","cited_authors":"\"\"","cited_year":"\"\"","cited_title":"WASH-1248","cited_venue":"(historical NRC/Atomic Energy Commission document)","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## B. Uranium Fuel Cycle Environmental Data—Table S-3 in 10 CFR 51.51","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540254,"raw_reference":"DOE Article, “New Railcar Designed to Transport Spent Nuclear Fuel Cleared for Operation,” June 4, 2024","cited_authors":"U.S. Department of Energy","cited_year":"2024","cited_title":"New Railcar Designed to Transport Spent Nuclear Fuel Cleared for Operation","cited_venue":"DOE article","cited_doi":null,"cited_url":null,"ref_kind":"news","section":"## C. Environmental Effects of Transportation of Fuel and Waste—Table S-4 in 10 CFR 51.52","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540255,"raw_reference":"WASH-1238","cited_authors":"\"\"","cited_year":"\"\"","cited_title":"WASH-1238","cited_venue":"(historical report)","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## C. Environmental Effects of Transportation of Fuel and Waste—Table S-4 in 10 CFR 51.52","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540256,"raw_reference":"ANSI N14.1, “Nuclear Materials-Uranium Hexafluoride-Packagings for Transport” (ANSI N14.1)","cited_authors":"ANSI","cited_year":"\"\"","cited_title":"Nuclear Materials-Uranium Hexafluoride-Packagings for Transport","cited_venue":"ANSI N14.1 standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## D. Fissile Material Packaging Requirements in 10 CFR 71.55","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540257,"raw_reference":"NUREG-1829, “Estimating Loss-of-Coolant Accident (LOCA) Frequencies through the Elicitation Process,” March 2008","cited_authors":"U.S. NRC","cited_year":"2008","cited_title":"Estimating Loss-of-Coolant Accident (LOCA) Frequencies through the Elicitation Process","cited_venue":"NUREG-1829","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (ii) Original Determination of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540258,"raw_reference":"NUREG-1903, “Seismic Considerations for the Transition Break Size,” February 2008","cited_authors":"U.S. NRC","cited_year":"2008","cited_title":"Seismic Considerations for the Transition Break Size","cited_venue":"NUREG-1903","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (ii) Original Determination of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540259,"raw_reference":"NUREG-0313, “Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping,” dated January 1988","cited_authors":"U.S. NRC","cited_year":"1988","cited_title":"Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping","cited_venue":"NUREG-0313","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540260,"raw_reference":"NUREG/CR-6674, “Fatigue Analysis of Components for 60-Year Plant Life,” dated June 2000","cited_authors":"U.S. NRC","cited_year":"2000","cited_title":"Fatigue Analysis of Components for 60-Year Plant Life","cited_venue":"NUREG/CR-6674","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540261,"raw_reference":"NUREG/CR-4792, “Probability of Failure in BWR Reactor Coolant Piping, Volume 1: Summary Report,” dated December 1988","cited_authors":"U.S. NRC","cited_year":"1988","cited_title":"Probability of Failure in BWR Reactor Coolant Piping, Volume 1: Summary Report","cited_venue":"NUREG/CR-4792","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540262,"raw_reference":"Technical Letter Report TLR-RES/DE/REB-2021-09, “Probabilistic Leak-Before-Break Evaluation of Westinghouse Four-Loop Pressurized-Water Reactor Primary Coolant Loop Piping using the Extremely Low Probability of Rupture Code,” dated August 13, 2021","cited_authors":"U.S. NRC RES","cited_year":"2021","cited_title":"Probabilistic Leak-Before-Break Evaluation of Westinghouse Four-Loop Pressurized-Water Reactor Primary Coolant Loop Piping using the Extremely Low Probability of Rupture Code","cited_venue":"TLR-RES/DE/REB-2021-09","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540263,"raw_reference":"Technical Letter Report TLR-RES/DE/REB-2021-14, “Probabilistic Leak-Before-Break Evaluations of Pressurized-Water Reactor Piping Systems using the Extremely Low Probability of Rupture Code,” dated September 28, 2021","cited_authors":"U.S. NRC RES","cited_year":"2021","cited_title":"Probabilistic Leak-Before-Break Evaluations of Pressurized-Water Reactor Piping Systems using the Extremely Low Probability of Rupture Code","cited_venue":"TLR-RES/DE/REB-2021-14","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540264,"raw_reference":"“White Paper on Continued Applicability of NUREG-1829,” dated November 13, 2024","cited_authors":"U.S. NRC","cited_year":"2024","cited_title":"White Paper on Continued Applicability of NUREG-1829","cited_venue":"NRC white paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540265,"raw_reference":"“White Paper on Continued Applicability of NUREG-1903,” dated November 18, 2024","cited_authors":"U.S. NRC","cited_year":"2024","cited_title":"White Paper on Continued Applicability of NUREG-1903","cited_venue":"NRC white paper","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540266,"raw_reference":"NUREG/KM-0017, “Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results,” dated December 16, 2021","cited_authors":"U.S. NRC","cited_year":"2021","cited_title":"Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results","cited_venue":"NUREG/KM-0017","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540267,"raw_reference":"EPRI Report (3002000709), “Seismic Probabilistic Risk Assessment Implementation Guide.”","cited_authors":"EPRI","cited_year":"\"\"","cited_title":"Seismic Probabilistic Risk Assessment Implementation Guide","cited_venue":"EPRI Report 3002000709","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540268,"raw_reference":"“Summary and Evaluation of Historical Strong-Motion Earthquake Seismic Response and Damage to Above-Ground Industrial Piping,” April 1985","cited_authors":"\"\"","cited_year":"1985","cited_title":"Summary and Evaluation of Historical Strong-Motion Earthquake Seismic Response and Damage to Above-Ground Industrial Piping","cited_venue":"report","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540269,"raw_reference":"ASME Code Case N-770, “Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated With UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities,”","cited_authors":"ASME","cited_year":"\"\"","cited_title":"ASME Code Case N-770","cited_venue":"ASME Code Case N-770","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540270,"raw_reference":"ASME Code Case N-716-2, “Alternative Classification and Examination Requirements,”","cited_authors":"ASME","cited_year":"\"\"","cited_title":"ASME Code Case N-716-2","cited_venue":"ASME Code Case N-716-2","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540271,"raw_reference":"“Draft White Paper: Statistical Approach to Optimizing a Performance Monitoring Program,” (2023 white paper)","cited_authors":"ASME / EPRI / industry (as cited)","cited_year":"2023","cited_title":"Draft White Paper: Statistical Approach to Optimizing a Performance Monitoring Program","cited_venue":"white paper","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540272,"raw_reference":"NUREG-1434, “Standard Technical Specifications—General Electric BWR/6 Plants,” Volume 2 of Revision 5.0","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Standard Technical Specifications—General Electric BWR/6 Plants","cited_venue":"NUREG-1434, Volume 2 Revision 5.0","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (c) Acceptable Methodologies and Analysis Assumptions","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540273,"raw_reference":"RG 1.157, “Best-Estimate Calculations of Emergency Core Cooling System Performance”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Best-Estimate Calculations of Emergency Core Cooling System Performance","cited_venue":"Regulatory Guide 1.157","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (v) Alternative ECCS Analysis Requirements and Acceptance Criteria","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540274,"raw_reference":"DG-1263, “Establishing Analytical Limits for Zirconium-Based Alloy Cladding,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Establishing Analytical Limits for Zirconium-Based Alloy Cladding","cited_venue":"DG-1263 (Draft Guidance)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## i. Hydrogen-Enhanced Beta-Layer Embrittlement","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540275,"raw_reference":"DG-1425 (proposed revision 2 of RG 1.183), “Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors,”","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Alternative Radiological Source Terms for Evaluating Design-Basis Accidents at Nuclear Power Reactors","cited_venue":"DG-1425 / RG 1.183 proposed revision 2","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## E. Control Room Requirements in 10 CFR 50.67 and GDC 19","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540276,"raw_reference":"“Method for Graded Risk-Informed Performance-Based Control Room Design Criteria Framework,” dated September 2024","cited_authors":"U.S. NRC staff","cited_year":"2024","cited_title":"Method for Graded Risk-Informed Performance-Based Control Room Design Criteria Framework","cited_venue":"NRC method document","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## E. Control Room Requirements in 10 CFR 50.67 and GDC 19","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540277,"raw_reference":"RG 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis,”","cited_authors":"U.S. NRC","cited_year":"1998","cited_title":"An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis","cited_venue":"Regulatory Guide 1.174","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (vi) Risk-Informed Changes to the Facility, Technical Specifications, or Procedures","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540278,"raw_reference":"RG 1.200","cited_authors":"U.S. NRC","cited_year":"\"\"","cited_title":"Standards for PRA (RG 1.200)","cited_venue":"Regulatory Guide 1.200","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## E. Control Room Requirements in 10 CFR 50.67 and GDC 19","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540279,"raw_reference":"TLR-RES/DE/REB-2021-09 (see above) and TLR-RES/DE/REB-2021-14 (see above)","cited_authors":"U.S. NRC RES","cited_year":"2021","cited_title":"(Technical Letter Reports referenced)","cited_venue":"TLR-RES/DE/REB series","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540280,"raw_reference":"NUREG/KM-0017 (see above)","cited_authors":"U.S. NRC","cited_year":"2021","cited_title":"Seismic Hazard Evaluations for U.S. Nuclear Power Plants: Near-Term Task Force Recommendation 2.1 Results","cited_venue":"NUREG/KM-0017","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"## (iii) Determining the Ongoing Validity of the Transition Break Size","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540281,"raw_reference":"NUREG-1829","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"NUREG-1829","cited_venue":"NUREG","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"XXXVI.F.(xii), “Applicability to New Reactor Designs”","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540282,"raw_reference":"EPRI Alternate Licensing Strategy (topical reports, April 2024)","cited_authors":"EPRI","cited_year":"2024","cited_title":"Alternate Licensing Strategy","cited_venue":"Topical reports submitted to NRC","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"XXXVI.F.(xiv), “Discussion of Public Comments on the Fuel Dispersal Aspects of the Regulatory Basis”","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540283,"raw_reference":"American National Standards Institute/American Nuclear Society 5.4, “Method for Calculating the Fractional Release of Volatile Fission Products from Oxide Fuel,” May 2011","cited_authors":"American National Standards Institute / American Nuclear Society","cited_year":"2011","cited_title":"Method for Calculating the Fractional Release of Volatile Fission Products from Oxide Fuel","cited_venue":"ANSI/ANS 5.4","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"XLVII, “Availability of Guidance” (draft regulatory guide updates)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540284,"raw_reference":"NUREG-1801, Generic Aging Lessons Learned Report for Initial License Renewal","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Generic Aging Lessons Learned Report for Initial License Renewal","cited_venue":"NUREG-1801","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"“Nuclear Power Plant License Renewal — Safety Guidance” (discussion referencing NUREG-1801)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540285,"raw_reference":"NUREG-2191, Generic Aging Lessons Learned Report for Subsequent License Renewal","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Generic Aging Lessons Learned Report for Subsequent License Renewal","cited_venue":"NUREG-2191","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"“Nuclear Power Plant License Renewal — Safety Guidance” (discussion referencing NUREG-2191)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540286,"raw_reference":"NUREG-1800, Standard Review Plan for Initial License Renewal","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Standard Review Plan for Initial License Renewal","cited_venue":"NUREG-1800","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"“Nuclear Power Plant License Renewal — Safety Guidance” (discussion referencing NUREG-1800)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540287,"raw_reference":"NUREG-2192, Standard Review Plan for Subsequent License Renewal","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Standard Review Plan for Subsequent License Renewal","cited_venue":"NUREG-2192","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"“Nuclear Power Plant License Renewal — Safety Guidance” (discussion referencing NUREG-2192)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540288,"raw_reference":"Regulatory Guide 1.97, “Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident.”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Regulatory Guide 1.97, “Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident.”","cited_venue":"U.S. NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§50.49 fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540289,"raw_reference":"Regulatory Guide 2.6, “Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities.”","cited_authors":"U.S. Nuclear Regulatory Commission","cited_year":null,"cited_title":"Regulatory Guide 2.6, “Emergency Planning for Research and Test Reactors and Other Non-Power Production and Utilization Facilities.”","cited_venue":"U.S. NRC Regulatory Guide","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Appendix E fn 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540290,"raw_reference":"WASH-1248, “Environmental Survey of the Uranium Fuel Cycle,” April 1974","cited_authors":"U.S. Atomic Energy Commission (?) / Task Force (as cited)","cited_year":"1974","cited_title":"WASH-1248, “Environmental Survey of the Uranium Fuel Cycle”","cited_venue":"WASH-1248 (report)","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"§51.51 note 1 (Table S-3)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540291,"raw_reference":"NUREG-0116 (Supp.1 to WASH-1248), “Environmental Survey of the Reprocessing and Waste Management Portion of the LWR Fuel Cycle.”","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":null,"cited_title":"NUREG-0116 (Supp.1 to WASH-1248), “Environmental Survey of the Reprocessing and Waste Management Portion of the LWR Fuel Cycle.”","cited_venue":"NUREG report (Supplement 1 to WASH-1248)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§51.51 note 1 (Table S-3)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540292,"raw_reference":"NUREG-0216 (Supp. 2 to WASH-1248), “Public Comments and Task Force Responses Regarding the Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle.”","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":null,"cited_title":"NUREG-0216 (Supp. 2 to WASH-1248), “Public Comments and Task Force Responses Regarding the Environmental Survey of the Reprocessing and Waste Management Portions of the LWR Fuel Cycle.”","cited_venue":"NUREG report (Supplement 2 to WASH-1248)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§51.51 note 1 (Table S-3)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540293,"raw_reference":"NUREG-1307, “Report on Waste Burial Charges.”","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":null,"cited_title":"NUREG-1307, “Report on Waste Burial Charges.”","cited_venue":"NUREG report","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§50.75(c)(2) (table note)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540294,"raw_reference":"NUREG-0396; EPA 520/1-78-016, “Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants,” December 1978.","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG-0396); U.S. Environmental Protection Agency (EPA)","cited_year":"1978","cited_title":"EPA 520/1-78-016, “Planning Basis for the Development of State and Local Government Radiological Emergency Response Plans in Support of Light Water Nuclear Power Plants.”","cited_venue":"EPA report (and NUREG-0396)","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Appendix E fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540295,"raw_reference":"NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors—Final Report,” December 2025.","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":"2025","cited_title":"NUREG-2249, “Generic Environmental Impact Statement for Licensing of New Nuclear Reactors—Final Report”","cited_venue":"NUREG report","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§51.51 note 1 (Table S-3)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540296,"raw_reference":"NUREG-2266, “Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels,” July 2024.","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":"2024","cited_title":"NUREG-2266, “Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels”","cited_venue":"NUREG report","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"§51.51 note 1 (Table S-3)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540297,"raw_reference":"ASME Nuclear Quality Assurance (NQA)-1, “Quality Assurance Requirements for Nuclear Facility Applications.”","cited_authors":"American Society of Mechanical Engineers (ASME)","cited_year":null,"cited_title":"ASME NQA-1, “Quality Assurance Requirements for Nuclear Facility Applications”","cited_venue":"ASME standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix T IV.B.4","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540298,"raw_reference":"ASME Boiler & Pressure Vessel Code, Section III.","cited_authors":"American Society of Mechanical Engineers (ASME)","cited_year":null,"cited_title":"ASME Boiler & Pressure Vessel Code, Section III","cited_venue":"ASME code","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix A to Part 52 VIII.B.6.b(4) and elsewhere","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540299,"raw_reference":"ACI 349 (standard).","cited_authors":"American Concrete Institute (ACI)","cited_year":null,"cited_title":"ACI 349","cited_venue":"Industry standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix A to Part 52 VIII.B.6.b(5)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540300,"raw_reference":"ANSI/AISC N-690 (standard).","cited_authors":"American Institute of Steel Construction / ANSI","cited_year":null,"cited_title":"ANSI/AISC N-690","cited_venue":"Industry standard","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix A to Part 52 VIII.B.6.b(5)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540301,"raw_reference":"Institute for Electrical and Electronics Engineers (IEEE) standards (as example of software engineering standards).","cited_authors":"IEEE","cited_year":null,"cited_title":"IEEE standards (referenced generically)","cited_venue":"IEEE","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix T IV.B.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540302,"raw_reference":"National Institute of Standards and Technology (NIST) standards (as example).","cited_authors":"NIST","cited_year":null,"cited_title":"NIST standards (referenced generically)","cited_venue":"NIST","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix T IV.B.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540303,"raw_reference":"American Nuclear Society (ANS) standards (as example).","cited_authors":"American Nuclear Society (ANS)","cited_year":null,"cited_title":"ANS standards (referenced generically)","cited_venue":"ANS","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix T IV.B.3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540304,"raw_reference":"NUREG-0396 (cited parenthetically with EPA planning basis).","cited_authors":"U.S. Nuclear Regulatory Commission (NUREG)","cited_year":null,"cited_title":"NUREG-0396","cited_venue":"NUREG report","cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"Appendix E fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540305,"raw_reference":"ESBWR Design Control Document, Revision 10","cited_authors":null,"cited_year":null,"cited_title":"ESBWR Design Control Document, Revision 10","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix E to Part 52—Design Certification Rule for the ESBWR Design; II.D.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540306,"raw_reference":"APR1400 Design Control Document Tier 1, Revision 3","cited_authors":null,"cited_year":null,"cited_title":"APR1400 Design Control Document Tier 1, Revision 3","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix F to Part 52—Design Certification Rule for the APR1400 Design; II.D.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540307,"raw_reference":"NuScale Standard Plant Design Certification Application, Certified Design Descriptions and Inspections, Tests, Analyses, & Acceptance Criteria (ITAAC), Part 2—Tier 1, Revision 5","cited_authors":null,"cited_year":null,"cited_title":"NuScale Standard Plant Design Certification Application, Certified Design Descriptions and Inspections, Tests, Analyses, & Acceptance Criteria (ITAAC), Part 2—Tier 1, Revision 5","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Appendix G to Part 52—Design Certification Rule for NuScale; II.D.1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540308,"raw_reference":"ASME Boiler and Pressure Vessel Code, Section III, Subsections NE (Division 1) and CC (Division 2)","cited_authors":"ASME","cited_year":null,"cited_title":"ASME Boiler and Pressure Vessel Code, Section III, Subsections NE (Division 1) and CC (Division 2)","cited_venue":"American Society of Mechanical Engineers","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix E to Part 52—Design Certification Rule for the ESBWR Design; VIII.B.6.b(9)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540309,"raw_reference":"American Concrete Institute 349","cited_authors":"American Concrete Institute","cited_year":null,"cited_title":"American Concrete Institute 349","cited_venue":"American Concrete Institute","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix E to Part 52—Design Certification Rule for the ESBWR Design; VIII.B.6.b(10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":540310,"raw_reference":"American National Standards Institute/American Institute of Steel Construction—N690","cited_authors":"ANSI/AISC","cited_year":null,"cited_title":"American National Standards Institute/American Institute of Steel Construction—N690","cited_venue":"ANSI / American Institute of Steel Construction","cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Appendix E to Part 52—Design Certification Rule for the ESBWR Design; VIII.B.6.b(10)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}