{"document":{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08","url":"https://www.federalregister.gov/documents/2022/04/08/2022-07133/pipeline-safety-requirement-of-valve-installation-and-minimum-rupture-detection-standards","source_native_id":"2022-07133","status":"fetched","abstract":"PHMSA is revising the Federal Pipeline Safety Regulations applicable to most newly constructed and entirely replaced onshore gas transmission, Type A gas gathering, and hazardous liquid pipelines with diameters of 6 inches or greater. In the revised regulations, PHMSA requires operators of these lines to install rupture-mitigation valves (i.e., remote-control or automatic shut-off valves) or alternative equivalent technologies, and establishes minimum performance standards for those valves' operation to prevent or mitigate the public safety and environmental consequences of pipeline ruptures. This final rule establishes requirements for rupture-mitigation valve spacing, maintenance and inspection, and risk analysis. The final rule also requires operators of gas and hazardous liquid pipelines to contact 9- 1-1 emergency call centers immediately upon notification of a potential rupture and conduct post-rupture investigations and reviews. Operators must also incorporate lessons learned from such investigations and reviews into operators' personnel training and qualifications programs, and in design, construction, testing, maintenance, operations, and emergency procedure manuals and specifications. PHMSA is promulgating these regulations in response to congressional directives following major pipeline incidents where there were significant environmental consequences or losses of human life. The revisions are intended to achieve better rupture identification, response, and mitigation of safety, greenhouse gas, and environmental justice impacts.","action":"Final rule."},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":4448,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections","date":"2023-08-01"},{"doc_id":407,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections","date":"2024-06-28"}],"references":[{"citation_id":10721,"raw_reference":"NTSB, Accident Report PAR-12/01, \"Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010\" (July 10, 2012)","cited_authors":"NTSB","cited_year":"2012","cited_title":"Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1201.pdf","ref_kind":"research_report","section":"fn 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10722,"raw_reference":"NTSB, Accident Report PAR-11/01, \"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010\" (Aug. 30, 2011)","cited_authors":"NTSB","cited_year":"2011","cited_title":"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","ref_kind":"research_report","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10723,"raw_reference":"CPUC, \"Sept. 9, 2010 PG&E Pipeline Rupture in San Bruno, CA\" (Jan. 12, 2012)","cited_authors":"CPUC","cited_year":"2012","cited_title":"Sept. 9, 2010 PG&E Pipeline Rupture in San Bruno, CA","cited_venue":"California Public Utilities Commission","cited_doi":null,"cited_url":"https://www.cpuc.ca.gov/uploadedFiles/CPUC_Public_website/Content/Safety/Natural_Gas_Pipeline/News/AgendaStaffReportreOIIPGESanBruno Explosion.pdf","ref_kind":"research_report","section":"fn 5","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10724,"raw_reference":"GAO, \"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response\" (Jan. 2013)","cited_authors":"GAO","cited_year":"2013","cited_title":"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","cited_venue":"Government Accountability Office, GAO-13-168","cited_doi":null,"cited_url":"https://www.gao.gov/assets/660/651408.pdf","ref_kind":"government_report","section":"fn 7","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10725,"raw_reference":"Oak Ridge National Laboratory (ORNL), ORNL/TM-2012/411, \"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves and Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety\" (Oct. 31, 2012)","cited_authors":"Oak Ridge National Laboratory","cited_year":"2012","cited_title":"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves and Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety","cited_venue":"Oak Ridge National Laboratory, ORNL/TM-2012/411","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/16701/finalvalvestudy.pdf","ref_kind":"research_report","section":"fn 8","page":null,"context_sentence":null,"paper_id":273,"paper_title":"Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety","paper_year":2012,"paper_doi":"10.2172/1373899"},{"citation_id":10726,"raw_reference":"Kiefner and Associates, Inc., Report No. 12-173, \"Leak Detection Study—DTPH56-11-D-000001\" (Dec. 10, 2012)","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2012","cited_title":"Leak Detection Study—DTPH56-11-D-000001","cited_venue":"Kiefner and Associates, Inc., Report No. 12-173","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/16691/leak-detection-study.pdf","ref_kind":"research_report","section":"fn 8","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10727,"raw_reference":"Rosenfeld & Fassett \"Study of Pipelines that Ruptured While Operating at a Hoop Stress Below 30% SMYS;\" Pipeline Pigging and Integrity Management Conference (Feb. 13-14, 2013)","cited_authors":"Rosenfeld & Fassett","cited_year":"2013","cited_title":"Study of Pipelines that Ruptured While Operating at a Hoop Stress Below 30% SMYS","cited_venue":"Pipeline Pigging and Integrity Management Conference","cited_doi":null,"cited_url":null,"ref_kind":"conference_paper","section":"Section III.E.3(ii) fn 42","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":10728,"raw_reference":"NTSB, PSS-71-1, Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown (Dec. 31, 1970)","cited_authors":"NTSB","cited_year":"1970","cited_title":"Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown","cited_venue":"National Transportation Safety Board","cited_doi":null,"cited_url":"https://www.ntsb.gov/safety/safety-studies/Documents/PSS7101.pdf","ref_kind":"research_report","section":"Section III.C.3 fn 37","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":15360,"raw_reference":"In the Matter of Viking Gas Transmission, Final Order, C.P.F. No. 32102 (May 1, 1998).","cited_authors":null,"cited_year":"1998","cited_title":"In the Matter of Viking Gas Transmission, Final Order, C.P.F. No. 32102","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"other","section":"Section H, PHMSA Response (fn 44)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":15361,"raw_reference":"NAS, “Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines” (last visited Nov. 23, 2021).","cited_authors":"NAS","cited_year":"2021","cited_title":"Criteria for Installing Automatic and Remote-Controlled Shutoff Valves on Existing Gas and Hazardous Liquid Transmission Pipelines","cited_venue":"National Academy of Sciences","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"Section L, PHMSA Response (fn 48)","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":15362,"raw_reference":"Ryan Emmanuel, et al., “Natural Gas Gathering and Transmission Pipelines and Social Vulnerability in the United States,” 5:6 GeoHealth (June 2021)","cited_authors":"Ryan Emmanuel, et al.","cited_year":"2021","cited_title":"Natural Gas Gathering and Transmission Pipelines and Social Vulnerability in the United States","cited_venue":"GeoHealth","cited_doi":null,"cited_url":"https://agupubs.onlinelibrary.wiley.com/toc/24711403/2021/5/6","ref_kind":"journal_article","section":"Section M, Environmental Justice (fn 59)","page":null,"context_sentence":null,"paper_id":5902,"paper_title":"Natural Gas Gathering and Transmission Pipelines and Social Vulnerability in the United States","paper_year":2021,"paper_doi":"10.1029/2021gh000442"}]}