Policy Replication

NRC's In-Situ Leach Facility Standard Review Plan

Docket document2014-05-02 · EPA · publication · EPA-HQ-OAR-2008-0218-0058
RIN 2060-AP26 · Docket EPA-HQ-OAR-2008-0218

Other documents for the same rulemaking (all, by stage)

2014-05-02 Federal RegisterRevisions to National Emission Standards for Radon Emissions From Operating Mill Tailings
2014-05-02 Docket documentSubpart W Interagency comments under EOs 12866 and 13563
2014-05-02 Docket documentE.O. 12866 review - draft
2014-05-02 Docket documentOMB questions on BID EIA
2014-05-02 Docket documentWork Plan for Risk Assessments
2014-05-02 Docket documentDraft Environmental Impact Statement (EIS) for Proposed NESHAPS for Radionuclides
2014-05-02 Docket documentPinon Ridge Mill: Application for Approval of Construction of Tailings Facility
2014-05-02 Docket documentNovember 10, 2011 Risk Assessment Revision for 40 CFR Part 61 Subpart W - Radon Emissions from Operating Mill Tailings
2014-05-02 Docket documentSubpart W-EIA-BID
2014-05-02 Docket documentHistory of NESHAPS and Subpart W Report 9/25/2008
2014-05-02 Docket documentAgency for Toxic Substances and Disease Registry (ATSDR) Public Health Assessment for Lincoln Park/Cotter Uranium Mill
2014-05-02 Docket documentEvaporation Pond Design Report Pinon Ridge Project Montrose County, Colorado
2014-05-02 Docket documentRisk Assessment Model Selection Methodology
2014-05-02 Docket documentRisk Assessment Revision for 40 CFR Part 61 Subpart W –
2014-05-02 Docket documentTailings Impoundment Technologies Report 9/25/2008
2014-05-02 Docket documentRisk Assessment Methodology, Environmental Impact Statement (EIS), NESHAPS for Radionuclides (1)
2014-05-02 Docket documentReview of Method 115 Report 9/25/2008
2014-05-02 Docket documentQuality Assurance Project Plan (QAPP)
2014-05-02 Docket documentRisk Assessments Methodology, Environmental Impact Statement (EIS), NESHAPS for Radionuclides (2)
2014-05-02 Docket documentRisk Assessments Methodology, Environmental Impact Statement (EIS), NESHAPS for Radionuclides (3)
2014-05-02 Docket documentRaffinate Characterization Pinon Ridge Mill Montrose County, Colorado
2014-05-02 Docket documentUranium Mill Tailings Radon Flux Calculations
2014-05-02 Docket documentUSEPA Contract Number EP-D-05-002
2014-05-02 Docket documentSubpart T Rescission
2014-05-02 Docket documentNational Emission Standards for Hazardous Air Pollutants (NESHAPs), Standards for Radon-222 Emissions from Licensed Uranium Mill Tailings. September 24, 1986 Final Rule
2014-05-02 Docket document40 CFR Part 61 192.32 a Errata
2014-05-02 Docket documentMarch 7, 1989 Proposed Rule, National Emission Standards for Hazardous Air Pollutants; Regulation of Radionuclides
2014-05-02 Docket document40 CFR Part 61 General Requirements Errata
2014-05-02 Docket documentLetter from Kennecott Uranium Company to Mr. Reid Rosnick
2014-05-02 Docket documentRecommended Procedures for Measuring Radon Fluxes from Disposal Sites for Residual Radioactive Materials
2014-05-02 Docket documentNational Emission Standards for Hazardous Air Pollutants; Standards for Radionuclides April 6 1983 Proposed Rule
2014-05-02 Docket documentSurface Water hydrology considerations in predicting radon releases from water-covered areas of uranium tailings ponds
2014-05-02 Docket documentFederal Register 40 CFR Part 61 192.32 a
2014-05-02 Docket documentOctober 17 2000 Errata
2014-05-02 Docket documentRadon Flux Measurements on Gardinier and Royster Phosphogypsum Piles Near Tampa and Mulberry, Florida [EPA-520/5-85-029] January 1986
2014-05-02 Docket documentOctober 31, 1984 ANPR Radionuclides
2014-05-02 Docket document40 CFR Part 61 General Requirements
2014-05-02 Docket documentDecember 15, 1989 Final Rule, National Emission Standards for Hazardous Air Pollutants; Radionuclides
2014-05-02 Docket documentBackground Information Document for Final Rule for Radon-222 Emissions from Licensed Uranium Mill Tailings [EPA 520/1-86-009]
2014-05-02 Docket documentMethod 115- Monitoring for Radon-222 Emissions
2014-07-01 Docket documentU.S. EPA Regulations Review Update
2014-07-01 Docket documentU.S. EPA Regulations Review Update: Subpart W NESHAPS (40 CFR 61)
2014-07-21 Federal RegisterRevisions to National Emission Standards for Radon Emissions From Operating Mill Tailings
2014-08-29 Docket documentEPA withdrew the proposed NESHAPs for Elemental Phosphorus Plants, DOE-Facilities, and NRC-Licensed Facilities
2014-08-29 Docket documentEPA established environmental protection standards for nuclear power operations pursuant to its authority under the Atomic Energy Act (AEA)
2014-09-03 Docket documentFR (Federal Register) 1989b. National Emission Standards for Hazardous Air Pollutants; Radionuclides, Volume 54, p. 51654, December 15, 1989
2014-09-03 Docket documentFR (Federal Register) 1986. 40 CFR Part 61, National Emission Standards for Hazardous Air Pollutants, Standards for Radon-222 Emissions from Licensed Uranium Mill Tailings; Final Rule, Volume 51, p. 34056, September 24, 1986
2014-09-03 Docket documentFR (Federal Register) 1994. National Emission Standards for Hazardous Air Pollutants; Final Rule, Volume 59, p. 36280, July 15, 1994
2014-09-12 Docket documentSC&A (S. Cohen and Associates) 2011. “Risk Assessment Revision for 40 CFR Part 61 Subpart W – Radon Emissions from Operating Mill Tailings, Task 4 – Detailed Risk Estimates”
2014-09-12 Docket documentSC&A (S. Cohen & Associates) 2008. “Report on the Review of Method 115 to Monitor Radon Emissions from Uranium Tailings,” September 25, 2008
2014-09-12 Docket documentSC&A (S. Cohen and Associates) 2010. “Risk Assessment Revision for 40 CFR Part 61 Subpart W – Radon Emissions from Operating Mill Tailings, Task 5 – Radon Emission from Evaporation Ponds,” Contract Number EP-D-10-042, Work Assignment No. 1-04, Task 5, SC&A, Inc., Vienna, Virginia, November 2010
2014-10-23 Docket documentRisk Assessment Methodology Environmental Impact Statement NESHAPS for Radionuclides Background Information Document,” Volumes 1–3, [EPA 520/1-89]
2014-10-23 Docket documentEvaporation Pond Radon Flux Analysis, Pinon Ridge Mill Project, Montrose County Colorado
2014-10-23 Docket documentEPA Determination that Radionuclides Constitute a Hazardous Air Pollutant Within The Meaning of Section 112(a)(1)
2014-10-23 Docket documentEPA promulgated final standards for Elemental Phosphorus Plants, DOE-Facilities, and NRC-Licensed Facilities
2014-10-23 Docket documentEPA established a work practice standard for Underground Uranium Mines
2014-10-23 Docket documentNational Emission Standards for Hazardous Air Pollutants, Standards for Radon-222 Emissions from Licensed Uranium Mill Tailings
2014-10-23 Docket documentNational Emission Standards for Hazardous Air Pollutants; Regulation of Radionuclides; Proposed Rule and Notice of Public Hearing
2014-11-06 Docket documentTechnical Resource Document, Extraction and Beneficiation of Ores and Minerals, Volume 5, “Uranium,” [EPA 530-R-94-032]
2014-12-04 Docket documentRisk Assessment Revision for 40 CFR Part 61 Subpart W – Radon Emissions from Operating Mill Tailings, Task 5 – Radon Emission from Evaporation Ponds (November 2010)

References: 75 extracted, 1 linked to papers

Page 2Download these results: CSV · JSON
NRC has completed its review of the quality assurance program at the in situ leach facility. This review included an evaluation using the review procedures in standard review plan Section 5.7.9.2 and the acceptance criteria outlined in standard review plan Section 5.7.9.3. The applicant has established an acceptable quality assurance program at the in situ leach site. The quality assurance program has been applied to all radiological, effluent, and environmental programs consistent with Regulatory Guides 4.14 (NRC, 1980) and 4.15 (NRC, 1979). The applicant has agreed to retain survey and instrument calibration records for 3 years and to retain records to demonstrate compliance and evaluate dose, intake, and releases to the environment until NRC terminates the license. Based on the information provided in the application and the detailed review conducted of the in situ leach facility, NRC staff concludes quality assurance program at the that the quality assurance program is acceptable and is in compliance with 10 CFR 20.1101, which provides requirements for radiation protection programs; 10 CFR Part 20, Subpart L, which specifies record keeping requirements; and 10 CFR Part 20, Subpart M, which defines reporting and notification requirements. 5-48 5.7.9.5 References
research reportNot linked to a paper · refsec
NRC. Regulatory Guide 4.14, “Radiological Effluent and Environmental Monitoring at Uranium Mills.” Revision 1. Washington, DC: NRC, Office of Standards Development. 1980. –––––. Regulatory Guide 4.15, “Quality Assurance for Radiological Monitoring Programs (Normal Operations)—Effluent Streams and the Environment.” Revision 1. Washington, DC:
research reportNot linked to a paper · refsec
NRC, Office of Standards Development. 1979. 5-49 6.0 GROUND-WATER QUALITY RESTORATION, SURFACE
research reportNot linked to a paper · refsec
NRC. NUREG–1575, “Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM).” Revision 1. Washington, DC: NRC. 2000. Removal and Disposal of Structures, Waste Materials, and Equipment 6.3.1 Areas of Review The staff should review methodologies proposed for removal and disposal of contaminated structures and equipment used during in situ leach operations, as well as techniques for managing toxic and radioactive waste materials. The reviewers should also evaluate approaches for identifying radiological hazards before initiating dismantlement of structures and 6-18 Ground-Water Quality Restoration, Surface
journal articleNot linked to a paper · refsec
Washington, DC: NRC. 2000. Financial Assurance 6.5.1 Areas of Review The staff should review financial assessments (cost estimates) provided by the applicant for the costs of ground-water restoration (standard review plan Section 6.1); reclamation (standard review plan Section 6.2); and decommissioning and waste disposal (standard review plan Section 6.3). These assessments may be provided as an appendix. The staff should review provisions for a financial surety that is consistent with Criteria 9 of 10 CFR Part 40, Appendix A, and the guidance in Appendix C of this standard review plan. 6.5.2 Review Procedures The staff should review the proposed surety amount provided to ensure that it is sufficient to fund all decommissioning activities documented in the license application, that the methods used to establish the surety amount are acceptable, and that the forecast costs are reasonable. Activities to be covered by the surety include reclamation, off-site disposal of 11e.(2) byproduct 6-23 Ground-Water Quality Restoration, Surface
journal articleNot linked to a paper · refsec
Standards Development. 1982. Environmental Effects –––––. Regulatory Guide 1.109, “Calculation of Annual Doses to Man From Routine Releases of Reactor Effluents for the Purpose of Evaluating Compliance With 10 CFR Part 50,
research reportNot linked to a paper · refsec
Development. 1987. 7-11 Environmental Effects –––––. Regulatory Guide 3.51, “Calculational Models for Estimating Radiation Doses to Man From Airborne Radioactive Materials Resulting From Uranium Milling Operations.” Washington,
research reportNot linked to a paper · refsec
DC: NRC, Office of Standards Development. 1982.
research reportNot linked to a paper · refsec
Barnthouse, L.W. “Effects of Ionizing Radiation on Terrestrial Plants and Animals, A Workshop Report.” ORNL/TN–13141. Oak Ridge, Tennessee: Oak Ridge National Laboratory. 1995.
research reportNot linked to a paper · refsec
NRC has completed its review of the nonradiological effects at the leach facility. This review included an evaluation of the methods that will be used to evaluate nonradiological effects using the review procedures in standard review plan Section 7.4.2 and the acceptance criteria outlined in standard review plan Section 7.4.3. The applicant has acceptably described anticipated significant nonradiological environmental impacts from facility operations. The estimated effects of nonradioactive wastes in effluents at the point of discharge and the projected effects for both acute and chronic exposure of biota are acceptable. Based on the information provided in the application and the detailed review conducted of in situ leach facility, the staff nonradiological effects for the concludes that the nonradiological effects are acceptable and are in compliance with 10 CFR Part 51.45 which specifies the content of environmental reports. 7.4.5 References None. Effects of Accidents 7.5.1 Areas of Review The NRC has evaluated the effects of accidents at in situ leach facilities [NUREG–0706 (NRC, 1980); Center for Nuclear Waste Regulatory Analyses, 2001]. These analyses demonstrate that, for most credible potential accidents, consequences are minor so long as effective emergency procedures and properly trained personnel are used. Specific areas where
journal articleNot linked to a paper · refsec
NUREG–1748 (NRC, 2001). 7-22 Environmental Effects 7.6.1.4 Evaluation Findings If the staff review, as described in this section, results in the acceptance of the effects of the economic and social benefits of construction and operation, the following conclusions may be presented in the environmental assessment.
research reportNot linked to a paper · refsec
NMSS Programs.” Washington, DC: NRC. 2001. 7-23 Environmental Effects 7.6.2 Socioeconomic Costs 7.6.2.1 Areas of Review The staff should review information presented concerning the ground-water quality restoration, surface reclamation, and plant decommissioning costs; and research and development costs, including postoperational monitoring requirements. The applicant should discount these costs to present worth. Resource commitments are addressed in Section 7.6.3 of this standard review plan. The staff should also review information on external costs, including the probable number and location of the population group is adversely affected, the estimated economic and social impact, and any special measures taken to alleviate the impact. Environmental justice considerations are presented in NUREG–1748 (NRC, 2001). Temporary external costs should also be evaluated including housing shortages; inflationary rentals or prices; congestion of local streets and highways; noise and temporary aesthetic disturbances; overloading of utilities, water supply, and sewage treatment facilities; crowding of local schools, hospitals, or other public facilities; overtaxing of community services; and disruption of people’s lives or of the local community caused by acquisition of land for the proposed site.
journal articleNot linked to a paper · refsec
NMSS Programs.” Washington, DC: NRC. 2001. 10.0 ENVIRONMENTAL APPROVALS AND CONSULTATIONS 10.1 Areas of Review The staff should review all licenses, permits, and other approvals of construction and operations required by federal, state, local, and regional authorities for the protection of the environment including a list of those federal and state approvals that have already been received, and the status of those pending approvals. The staff should also review similar information regarding approvals, licenses, and contacts with tribal authorities. The staff should examine previously submitted environmental assessments or environmental impact statements, if appropriate. The staff should evaluate discussions of the status of efforts to obtain a water quality certification under Section 401 and discharge permits under Section 402 of the Federal Water Pollution Control Act, as amended, if required, including the rationale if certification is not required. The staff should also note the state, local, and regional planning authorities that have been contacted or consulted.
journal articleNot linked to a paper · refsec
NMSS Programs.” Washington, DC: NRC. 2001. 10-3
research reportNot linked to a paper · refsec
NRC. “Annual Financial Surety Update Requirements for Uranium Recovery Licensees.” Generic Letter 97-03. Washington, DC: NRC. July 1997. Talisman Partners, Ltd. “Introduction to RACER 2000™ (Version 2.1.0)—A Quick Reference.”
research reportNot linked to a paper · refsec
Englewood, Colorado: Talisman Partners, Ltd. 2000.
research reportNot linked to a paper · refsec
Hartley, J.N. et al., 1985, Methods for Estimating Radioactive and Toxic Airborne Source Terms for Uranium Milling Operations, NUREG/CR-4088, PNL-5338, prepared by Pacific Northwest
research reportNot linked to a paper · refsec
Hess, C.T., et al., 1985, “The Occurrence of Radioactivity in Public Water Supplies in the United States,” Health Physics, vol. 48, No. 5, May.
Hunter, J., 1996, “Making a Success of In-Situ Leaching at the Highland Uranium Project,” presented at the annual meeting of the Society for Mining, Metallurgy, and Exploration, Phoenix, Ariz., March 11-14. Mueller Associates, Inc., 1986, Indoor Air Quality Environmental Information Handbook: Radon,
journal articleNot linked to a paper · refsec
Energy, Washington, D.C. Strenge, D.L., and T.J. Bander, 1984, MILDOS — A Computer Program for Calculating Environmental Radiation Doses from Uranium Recovery Operations, NUREG/CR-2011, PNL-3767, Pacific Northwest Laboratory, Richland, Wash., for the U.S. Nuclear Regulatory Commission,
research reportNot linked to a paper · refsec
Washington, D.C. U.S. Nuclear Regulatory Commission, 1980, Final Generic Environmental Impact Statement on Uranium Milling, NUREG-0760, Washington, D.C., Sept.
research reportNot linked to a paper · refsec
Yu, C., et al., 1993, Manual for Implementing Residual Radioactive Material Guidelines Using
research reportNot linked to a paper · refsec
Yuan, Y.C., J.H.C. Wang, and A.J. Zielen, 1989, MILDOS-AREA: An Enhanced Version of MILDOS for Large-Area Sources, ANL/ES-161, Argonne National Laboratory, Argonne, Ill., June. D–19
research reportNot linked to a paper · refsec
NRC. NUREG/CR–5512, “Residual Radioactive Contamination from Decommissioning—User’s Manual.” Volume 2. Washington, DC: NRC. April 2001. –––––. NUREG–1727, “NMSS Decommissioning Standard Review Plan.” Washington, DC:
journal articleNot linked to a paper · refsec
NRC. 2000. –––––. Draft NUREG–1549, “Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination.” Washington, DC: NRC. July 1998. –––––. NUREG/CR–5512, “Residual Radioactive Contamination from Decommissioning—Parameter Analysis.” Draft. Volume 3. Washington, DC: NRC. April 1996. E–10 Appendix E Sandia National Laboratories. “Review of Parameter Data for the NUREG/CR–5512 Residential Farmer Scenario and Probability Distributions for the DandD Parameter Analysis.” Draft Letter Report. January 30, 1998a. –––––. “Review of Parameter Data for the NUREG/CR–5512 Building Occupancy Scenario and Probability Distributions for the DandD Parameter Analysis.” Draft Letter Report. January 30, 1998b. –––––. “Comparison of the Models and Assumptions Used in the DandD 1.0, RESRAD 5.61, and RESRAD-Build Computer Codes with Respect to the Residential Farmer and Industrial Occupant Scenarios Provided in NUREG/CR–5512.” Draft Report. October 15, 1998c. E–11
journal articleNot linked to a paper · refsec
← Previous