November 10, 2011 Risk Assessment Revision for 40 CFR Part 61 Subpart W - Radon Emissions from Operating Mill Tailings
Other documents for the same rulemaking (all, by stage)
References: 31 extracted, 0 linked to papers
Alief, M. Hassan, 2010, “Marquez Uranium Property, McKinley and Sandoval Counties, New
Cain, J., 2008, “Semiannual Effluent Report,” Cotter Corporation, Letter to Steve Tarlton, Program Manager, Radiation Control Program, Hazardous Materials and Waste Management
Cain, J., 2010a, “Semiannual Effluent Report,” Cotter Corporation, Letter to Steve Tarlton, Program Manager, Radiation Control Program, Hazardous Materials and Waste Management
Cain, J., 2010b, “Semiannual Effluent Report,” Cotter Corporation, Letter to Steve Tarlton, Program Manager, Radiation Control Program, Hazardous Materials and Waste Management
Cameco, 2010a, http://www.cameco.com/mining/crow_butte/, accessed 11/16/2010.
Cameco, 2010b, http://www.cameco.com/mining/highland_smith/, accessed 11/16/2010.
Cameco Resources, 2009, “Minor Revision to Source Material License SUA-1548, Docket No. 40-8964,” Letter from Krista Wenzel, Manager, Environment, Health and Safety, to Douglas
Mandeville, U.S. Nuclear Regulatory Commission, July 31. Cogema Mining, Inc., 2008, “Irigaray and Christensen Ranch Projects, U.S. NRC License Renewal Application, Source Material License SUA-1341,” May. Cogema Mining Inc., 2010, “Irigaray and Christensen Ranch Projects, 2009 Annual Effluent and Monitoring Report, January 1 through December 31, 2009, NRC Source Material License No.
SUA-1341, Docket No. 40-8502 and Semi-Annual Monitoring Report, July 1 through December 31, 2009, WDEQ Permit To Mine No. 478,” February. Colorado Department of Public Health and Environment (CDPHE) and U.S. Environmental Protection Agency, Region VIII, 2007, “Community Involvement Plan, Lincoln Park Superfund Site and Associated Activities at the Cotter Corporation Uranium Mill,” March.
Cotter Corporation, 2007, “Environmental and Occupational Performance Report, ALARA
Review, and Annual Report on Remedial Action Plan Activities for Calendar Year 2006, Radioactive Materials License No. 369-01,” June 29.
WA 1-04, Task 5 SC&A – November 10, 2011 Cotter Corporation, 2010, “Environmental and Occupational Performance Report, ALARA
Review, and Annual Report on Remedial Action Plan Activities for Calendar Year 2009, Radioactive Materials License No. 369-01,” June 22. U.S. Court of Appeals, Tenth Circuit (CofA), 2010, “Appeal from the United States Nuclear Regulatory Commission (No. 40-8968-ML),” Elisabeth A. Shumaker, Clerk of Court, No. 079505, March 8. Crow Butte Resources, Inc. (CBR), 2009, “Responses to NRC Request for Additional
SUA-1534,” May. Crow Butte Resources, Inc. (CBR) and ARCADIS U.S., Inc., 2007, “Application for 2007 License Renewal, USNRC Source Materials License SUA-1534, Crow Butte License Area,” ML073480267, November. Denison Mines (USA) Corp, 2007, “White Mesa Uranium Mill License Renewal Application, State of Utah Radioactive Materials License No. UT1900479, Volume 4 - Environmental Report,” February 28. U.S. Environmental Protection Agency (EPA), 1989a, “Risk Assessment Methodology, Environmental Impact Statement, NESHAPS for Radionuclides, Background Information
Document, Volume 1,” EPA 520/1-89-005, Office of Radiation Programs, Washington DC. September. U.S. Environmental Protection Agency (EPA), 1989b, “Risk Assessments, Environmental Impact Statement, NESHAPS for Radionuclides, Background Information Document, Volume 2,” EPA 520/1-89-006-1, Office of Radiation Programs, Washington DC. September. U.S. Environmental Protection Agency (EPA), 1989c, “Risk Assessments Appendixes, Environmental Impact Statement, NESHAPS for Radionuclides, Background Information
Washington DC. September. U.S. Environmental Protection Agency (EPA), 1989d, “Economic Assessment, Environmental Impact Statement, NESHAPS for Radionuclides, Background Information Document, Volume 3,” EPA 520/1-89-007, Office of Radiation Programs, Washington DC. September. Federal Register (FR), 1989, “Final rulemaking package for Subpart W,” Volume 54, page 51679, December 15. Kennecott Uranium Company (KUC), 1994, “Revised Environmental Report for the Sweetwater Uranium Project, Sweetwater County, Wyoming, Source Material License: SUA-1350,” August.
WA 1-04, Task 5 SC&A – November 10, 2011 Kennecott Uranium Company (KUC), 2004, “Sweetwater Uranium Project - Docket Number: 40-8584, Source Material License #: SUA-1350, Request for a Ten (10) Year License Renewal,” May 25.
McNeill, A., 2010, Alta Mesa Uranium Project, http://armcn.blogspot.com/2010/03/sucessfulexploration-program-alta-mesa.html, accessed 11/16/2010.
Melbye, Scott, 2008, “The American Uranium Renaissance - Back from the Brink,” President, Cameco Inc., presented at 33rd World Nuclear Association Annual Symposium. Neutron Energy, Inc. (NE), 2008a, “Subpart 4 Exploration Permit Application, Section 4.A” filed with State of New Mexico, Energy, Minerals, and Natural Resources Department, January Neutron Energy, Inc. (NE), 2008b, “Slides of Neutron Energy’s Presentation to Discuss Proposed Juan Tafoya Conventional Uranium Mill,” presentation to the U.S. Nuclear Regulatory
Commission, ML083170498, November 6. U.S. Nuclear Regulatory Commission (NRC), 1997, “Final Environmental Impact to Construct and Operate the Crownpoint Uranium Solution Crownpoint, New Mexico,” Office of Nuclear Material Safety and Safeguards, NUREG- 1508, in Cooperation With U.S. Bureau of Land
Management, BLM NM-010-93-02, and U.S. Bureau of Indian Affairs, BIA EIS-92-001, February. U.S. Nuclear Regulatory Commission (NRC), 2003, “Standard Review Plan for In Situ Leach Uranium Extraction License Applications, Final Report,” Office of Nuclear Material Safety and
Safeguards, NUREG-1569, June. U.S. Nuclear Regulatory Commission (NRC), 2008, “Environmental Assessment Regarding the License Amendment Request to Return to Operating Status From Decommissioning Status, Cogema Mining, Inc., Irigaray and Christensen Ranch Projects, Wyoming,” Office of Federal and State Materials and Environmental Management Programs, September. U.S. Nuclear Regulatory Commission (NRC), 2009, “Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities,” NUREG-1910, May. U.S. Nuclear Regulatory Commission (NRC), 2010, http://www.nrc.gov/info-finder/ decommissioning/uranium/cogema-mining-inc.html, accessed December 5.
Piedmont Environmental Council, 2010, http://www.pecva.org/anx/index.cfm/ 1,557,2134,0,html/Properties-with-Former-1980s-Uranium-Mining-Leases-and-DownstreamWater-Supplies-Piedmont-region, accessed November 26. Power Resources, Inc. (PRI), 2003, “Smith Ranch -Highland Uranium Project, Source Material License Application,” March 12.
WA 1-04, Task 5 SC&A – November 10, 2011 EnecoTech Inc., 1994, “MILDOS Modeling Analysis, Kennecott Sweetwater Uranium Facility,” prepared for Radiant Energy Management, February. Rio Algom Mining Corp. (RAMC), 1999, “Smith Ranch Facility, Source Material License
Sandia National Laboratories, 2003, “SECPOP2000: Sector Population, Land Fraction, and Economic Estimation Program,” prepared for U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, Division of Risk Analysis and Applications, NUREG/CR-6525, Rev. 1, SAND2003-1684P, August. Sanford Cohen & Associates (SC&A), 2010, “Risk Assessment Revision for 40 CPR Part 61 Subpart W – Radon Emissions from Operating Mill Tailings, Task 3 – Risk Assessment Model,” prepared for U.S. Environmental Protection Agency, August 31.
Savignac, Noel, 2007, “MILDOS Determination of Radiation Doses from Power Resources Inc. Smith Ranch-Highlands Uranium In-Situ Leaching Operation,” Revised May 3.
SENES Consultants Limited (SENES), 2008, “Proposed Development of New Tailings Cell 4B for the White Mesa Uranium Mill,” Prepared for: Denison Mines (USA) Corp. (DUSA), April.
Tanner, George E., and Paul Goranson, 2007, “Newest In Situ Uranium Mine in South Texas,” Bulletin of the Corpus Christi Geological Society and Coastal Bend Geophysical Society, ISSN 0739-5620, February. Texas Department of Health (TDH), 1988, “Environmental Assessment Related to Expansion of the URI, Inc. Kingsville Dome Project, Kleberg County, Texas, License No. L03653,” Bureau of Radiation Control, TBRC EA-14-1S, December 30.
Trihydro Corporation, 2005, “Platte River Basin Water Plan, Section 2.3 – Water Use for Industrial Purposes,” Technical Memorandum 2.3, June 14. Trinity Engineering Associates, Inc., 2007, “CAP88-PC Version 3.0 User Guide,” prepared for U.S. Environmental Protection Agency, Office of Radiation and Indoor Air, December 9. UraniumFree Virginia (UFV), 2010, http://uraniumfreeva.org/intro-to-uranium-mining-in-va/, accessed 12/5/2010.
Uranium One, 2006, “sxr Uranium One Enters into an Exclusivity Agreement with Rio Tinto to Acquire the Sweetwater Uranium Mill and Green Mountain Uranium Properties,” News Release, July 10. Uranium Resources, Inc. (URI), 2010a, “Annual Report Pursuant to Section 13 or 15(D) of the Securities Exchange Act of 1934, For the Fiscal Year Ended December 31, 2009,” Form 10-K, March 16.
WA 1-04, Task 5 SC&A – November 10, 2011 Uranium Resources, Inc. (URI), 2010b, http://www.uraniumresources.com/projects/texas.html, accessed 11/16/2010.