Evaporation Pond Design Report Pinon Ridge Project Montrose County, Colorado
Other documents for the same rulemaking (all, by stage)
References: 44 extracted, 0 linked to papers
ASTM D 6747. 2004. Standard Guide for Selection of Techniques for Electrical Detection of Potential Leak Paths in Geomembranes.
ASTM D 7240. 2006. Standard Practice for Leak Location using Geomembranes with an Insulating Layer in Intimate Contact with a Conductive Layer via Electrical Capacitance Technique (Conductive Geomembrane Spark Test).
Bonaparte, R., Daniel, D.E., and Koerner, R.M. 2002. “Assessment and Recommendations for Optimal Performance of Waste Containment Systems.” EPA/600/R-02/099, December, U.S. EPA, ORD,
Cincinnati, Ohio. CH2M Hill. 2008. “Piñon Ridge Project, Tailings Stream Analysis (Rev. 2).” Memo issued by Brett Berg. 12 March 2008.
Giroud, J.P. 2005. “Contribution of the Geosynthetics to the Geotechnical Aspects of Waste Containment.” The Mercer Lecture, 2005-2006. Sponsored by Tensar International with the endorsement of the International Society for Soil Mechanics and Geotechnical Engineering and the International Geosynthetics Society (ISSMGE & IGS).
Giroud, J.P., Badu-Tweneboah, K., and Soderman, K.L. 1997. “Comparison of leachate flow through compacted clay liners and geosynthetic clay liners in landfill liner systems.” Geosynthetics International, 4 (3-4), 391-431. Golder Associates Inc. (Golder). 2007. “Proposed Facility Layout Concepts and Details, Piñon Ridge Plant and Tailings Facilities, Paradox Valley, Colorado.” Submitted to CDPHE. November 7, 2007. Golder Associates Inc. (Golder). 2008a. “Phase 2 Geotechnical Field and Laboratory Program, Piñon Ridge Project, Montrose County, Colorado.” Report prepared for Energy Fuels Resources
Corporation, September 2008. Golder Associates Inc. (Golder). 2008b. “Resistance of HDPE Geomembrane to Degradation from Ultraviolet (UV) Radiation in Support of Design Work for the Piñon Ridge Project, Montrose
County, Colorado.” Letter report prepared for the Colorado Department of Public Health and Environment (CDPHE), 8 August 2008. i:\07\81694\0400\designrep-evappond-fnl_07oct08\designrep-evappond-fnl_07oct08.docx Golder Associates October 2008 -19- 073-81694.0004 Golder Associates Inc. (Golder) 2008c. “Technical Specifications, Piñon Ridge Project, Montrose
County, Colorado.” Prepared for Energy Fuels Resources Corporation, September 2008. Golder Associates Inc. (Golder). 2008d. “Tailings Cell Design Report, Piñon Ridge Project, Montrose
County, Colorado.” Report prepared for Energy Fuels Resources Corporation, October 2008. Gundle/SLT Environmental Inc. (GSE). 2003. “Technical Note – HDPE, UV Resistance for GSE Geomembranes.” http://www.truslate.com/grid/techspec.pdf.
Hargreaves, G.L., Hargreaves, G.H., and Riley, J.P. 1985. “Agricultural benefits for Senegal River Basin.” Journal of Irrigation and Drainage Engineering. ASCE 111:113-124.
Kleinfelder. 2007a. “Energy Fuels Resource Corporation, Uranium Mill Licensing Support, Climatological Report, Piñon Ridge Mill Site, Montrose County, Colorado.” 4 December 2007.
Kleinfelder. 2007b. “Climatology Report – Addendum No. 1.” Letter to B. Monok of EFRC and K. Morrison of Golder dated 7 December 2007.
Kleinfelder. 2008. “Design Ground Motions at Piñon Uranium Mill, Colorado.” Draft Memo to K.
Morrison, Golder Associates, Inc. 14 January 2008. Layfield Geosynthetics (Layfield). 2008. “UV Resistance.” http://www.geomembranes.com.
Lupo, J.F., and Morrison, K.F. 2005. “Innovative Geosynthetic Liner Design Approaches and Construction in the Mining Industry.” Geotechnical Special Publication (GSP) 140,
Proceedings, Geo-Frontiers 2005, Austin, Texas.
Shackelford, C.D., Benson, C.H., Katsumi, K., Edil, T. and Lin, L. 2000. “Evaluation the Hydraulic Conductivity of GCLs Permeated with Non-Standard Liquids.” Geotextiles and
Geomembranes, 18, 133-161. State of Colorado, Department of Natural Resources, Division of Water Resources, Office of the State Engineer (Office of the State Engineer). 2007. Rules and Regulations for Dam Safety and Dam Construction. January. U.S. Congress. 1976. Migratory Bird Treaty Act. 16 USC §703 et seq. November. U.S. Environmental Protection Agency (U.S. EPA). 1992. “Action leakage rates for detection systems (supplemental background document for the final double liners and leak detection systems rule for hazardous waste landfills, waste piles, and surface impoundments).”
Stokoe II. 2001. “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils.” J. Geotechnical and Geoenvironmental Engineering, Vol. 127, No. 10, ASCE. Zeus Technical Whitepaper (Zeus). 2005. “UV Properties of Plastics: Transmission & Resistance.” http://www.zeusinc.com/pdf/Zeus_UV_Properties.pdf. i:\07\81694\0400\designrep-evappond-fnl_07oct08\designrep-evappond-fnl_07oct08.docx Golder Associates
Allen, R.G., Pereira, L.S., Raes, D. and Smith, M. 1998. “FAO Irrigation and Drainage Paper No. 56– Crop Evapotranspiration”, (latest revision 2002). CH2M Hill. 2008. “Piñon Ridge Project, Tailings Stream Analysis (Rev. 2).” Memo issued by Brett Berg. 12 March 2008.
Hargreaves, G.L., Hargreaves, G.H., and Riley, J.P. 1985. "Agricultural benefits for Senegal River Basin", Journal of Irrigation and Drainage Engineering, ASCE 111:113-124.
Ortega, J.F., Tarjuelo, J.M., Montero, J., and de Juan, J.A. 2000. Discharge Efficiency in Sprinkling Irrigation: Analysis of the Evaporation and Drift Losses in Semi-arid Areas. International Commission of Agricultural Engineering, CIGR E-Journal, Vol. II, March.
Schroeder, P.R., Dozier, T.S., Zappi, P.A., McEnroe, B.M., Sjostrom, J.W., and Peyton, R.L. 1994. “The Hydrologic Evaluation of Landfill Performance (HELP) Model: Engineering Documentation for Version 3.” EPA/600/R-94/168b, U.S. Environmental Protection Agency Office of Research and Development, Washington, DC. i:\07\81694\0400\designrep-evappond-fnl_07oct08\app a\app a.docx Golder Associates
Allen, R. G., Pereira, L. S., Raes, D., and Smith, M. (1998). “Crop evapotranspiration Guidelines for computing crop water requirements.” Irrigation and drainage paper 56, FAO, Rome.
APPENDIX C WATER FOWL PROTECTION SYSTEM i:\07\81694\0400\designrep-evappond-fnl_07oct08\designrep-evappond-fnl_07oct08.docx Golder Associates October 2008 073-81694.0004
REFERENCES U.S. Congress. 1976. Migratory Bird Treaty Act. 16 USC §703 et seq. November.
Au, T., and Christiano, P. 1987. Structural analysis, Prentice-Hall, Englewood Cliffs, New Jersey.
Ortiz-Berrocal, L. 1991. Resistencia de Materiales, McGraw-Hill, Madrid. i:\07\81694\0400\designrep-evappond-fnl_07oct08\app c\app-c birdnet.docx Golder Associates
MATERIAL PROPERTIES: Wood Pole o Allowable bending stress 500 psi (Assumed) Stainless steel cable Type 304 Dia. 3/32” 7x7 o Breaking strength 920 lb o Weight per 1000 ft = 16 lb Stainless steel cable Type 304 Dia. 7/32” 7x19 o Breaking strength 5,000 lb o Weightper l000ft=861b Soil properties (per Golder 2007) o Density 89.9 lb/ft o Friction angle 33.7° o Lateral bearing 150 psf/ft (Assumed) ASSU1Wf IONS: The bird netting and installation hardware strength provided by the manufacturer allows a maximum span equal to 48 feet. The maximum cable dip is assumed to be 10 feet at the center of the 315-foot span. The distance between the cable and the ground is assumed to be 6 feet at mid span. J:O7jOBSfl3-8l694 EFRPirn RdgD A iciErlion ilject Piñon Ridge Project 4ade by ob No 073-81694 05/14/08 vaporation Pond Design Dhecked by )ate 3ird Netting Design pproved by heet No
METHOD: Cable analysis (Au and Christiano 1987: Ortiz-Berrocal 1991) p = distributed load H = horizontal component of reaction N= normal reaction f= dip 1= span L= cable length L= I+ Wind load Simplified wind load method (International Code 2003) 3:O7JOBS734I694 EPR Piin Ridg’Di And 2 of 3 ubject Piñon Ridge Project adeby obNo 073-8 1694 05114/08 ivaporation Pond Design Dhecked by )ate lird Netting Design pproved by_ heet No 3 of 3 Ultimate soil resistance The permissible horizontal force at the pole is calculated using the following equation (Keshavarzian 2002): W=Y*b*K*l O(LO where: y = unit weight of soil (pcf) b = width of pole at butt K = coefficient of Rankine passive pressure E = pole setting depth (Ii) L = pole length (ft)
REFERENCES: Au, T., and Christiano, P. (1987). Structural analysis, Prentice-Hall, Englewood Cliffs, NJ. International Code, C. (2003). International building code 2003, International Code Council, Country Club Hills,
Keshavarzian, M. (2002). “Self-supported wood pole fixity at ANSI groundline.” Practice Periodical on Structural Design and Construction, 7(4), 147-155.
Ortiz-Berrocal, L. (1991). Resistencia de Materiales, McGraw-Hill, Madrid. j:W7JS734i694 EFRPiwnRdrDi SJJfl9IJ
MONTROSE COUNTY, COLORADO REvwED APRIL15, 2008 N.T.S. 073-81694
Au, T., and Christiano, P. (1987). Structural analysis, Prentice-Hall, Englewood Cliffs, NJ.
Ortiz-Berrocal, L. (1991). Resistencia de Materiales, McGraw-Hill, Madrid. I 7JOBSlO71.R 1694 FFR Prnr,. 4.... STflDIJ
MONTROSE COUNTY, COLORADO APRIL15, 2008 N.T.S.
Giroud, J.P., and Bonaparte, R. 1989. “Leakage through liners constructed with geomembranes –
Giroud, J.P., Gross, B.A., Bonaparte, R., and McKelvey, J.A. 1997. “Leachate flow in leakage collection layers due to defects in geomembrane liners.” Geosynthetics International, 4(3-4), 215-292. i:\07\81694\0400\designrep-evappond-fnl_07oct08\app e\app e.docx Golder Associates
A. (1997). “Leachate flow in leakage collection layers due to defects in geomembrane liners.” Geosynthetics International, 4(3-4), 215-292. I I07JOBSO73.8 1694 EFR P.,,oo ,dg,’D,,,g,, M. PdLDS
FLOW THROUGH LINER DEFECT CALCULATIONS The flow rate through a defect in the geomembrane is given by the following equation (Giroud et al. 1997): 0.005 defect diameter hprim := 8 total liquid head over primary geomembrane g := 32.2 ft / sec Q := gravity ./g.hprim where the maximum flow rate through the primary liner geomembrane is: /sec Q = 2.675X i0 ft The permeability of the geonet can be defined by: tLCL := 0.017 o := 0.02 15 tt2 / sec thickness of the geonet geonet transmissivity geonet hydraulic conductivity tLCL k = 1.265 ft/sec The maximum steady-state rate of leachate migration through a defect in the primary liner that a leakage collection layer can accommodate without being filled with leachate (Giroud et al. 1 997b): QfuII ktLCL QfuIl = 3.655X i0 /sec
A. (1997). “Leachate flow in leakage collection layers due to defects in geomembrane liners.” Geosynthetics International, 4(3-4), 215-292.
ATTACHMENT 1 ATTACHMENT 2 LCRS SUMP SIZING WORKSHEET ________ Attachment 2 LCRS Sizing Worksheet Project Name: Pinon Mill Evaporation Ponds Project Number: 073-81694.0004 Client: Energy Fuels Resources Corp. (EFRC) By: KFM Date: 5/20/2008 Pond Depth: Pond Side 1(upper): Pond Side 2 (upper): Pond Side 1(lower): Pond Side 2 (lower): Side Slope: Liner Overlap per Side 0 ft 0.0 m Dry Freeboard 0 ft 0.0 m 5 ft Pond Volume w/o freeboard: 6,750 ftA 50,490 gal. 191 m”3 191,289 liters Liner Area: 2,514 ftA2 234 mA2 Pond Volume w/ freeboard: 6,750 ftA3 50,490 gal. 191 mA3 191,289 liters Golder Associates J:\O7JOBS\073-81 694 EFR Pinon Ridge\Design AnaIysesEvaporation Pond\LDS Design\LDS Sump-Evap Pond January2008 073-81694