White Mesa Mill, Blanding, Utah Semi-Annual Effluent Monitoring Report for Period July 1 through December 31, 2015
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking (all, by stage)
References: 8 extracted, 0 linked to papers
PRE Console #4 Calibration 2014 METHOD 5 DRY GAS METER CALl BRATION USING CRITICAL ORIFICES ihfhillWiilfM.fi,MiWJ 1) Select three critical orifices to calibrate the dry ga~ meter which bracket the expected operating range. 2) Record barometric pressure before and after calibration procedure. 3) Run at tested vacuum (from Orifice Calibration Report), for a period of time necessary to achieve a minimum total volume of 5 cubic feet. 2015 Pre-Calibration 4) Record data and information in the GREEN cells, YELLOW cells are calculated.
PRE Console #6 Calibration 2015 METHOD 5 DRY GAS METER CALIBRAliON USING CRITICAL ORIFICES 1) Select three critical orifices to calibrate the dry gas meter which bracket lhe expected operating range. 2) Record barometric pressure before and after calibration procedure. 3) Run at tested vacuum (from Orifice Calibration Report), for a period of time Energy Fuels necessary to achieve a minimum total volume of 5 cubic feet. 4) Record data and information in the GREEN cells , YELLOW cells are calculated.
ATTACHMENTK CELL 2 RADON FLUX DATA National Emission Standards for Hazardous Air Pollutants 2015 Radon Flux Measurement Program White Mesa Mill 6425 South Highway 191
Blanding, Utah 84511 July 2015 Sampling Results Cell2 Prepared for: Energy Fuels Resources (USA) Inc. 6425 S. Highway 191 P.O. Box 809
Blanding, Utah. The mill began operations in 1980 for the purpose of extracting uranium and vanadium from feed stocks. Processing effluents from the operation are deposited in lined cells, which vary in depth. Celli, Cell4A, and Cell4B did not require radon flux sampling, as explained in Section 3 below. Cell 2, which has a total area of approximately 270,624 m2, has been filled and covered with interim cover. This cell is comprised of one region, an interim soil cover of varying thickness, which requires NESHAPs radon flux monitoring. There was no standing liquid and were no apparent exposed tailings within Cell2 during this sampling. Cell 3, which has a total area of approximately 288,858 m2, is nearly filled with tailings sand and is undergoing pre-closure activities. This cell is comprised of two source regions that require NESHAPs radon monitoring: a soil cover region of varying thickness and an exposed tailings "beaches" region. A portion of Cell 3 is covered by standing liquid in lower elevation areas. As previously mentioned, the results of radon flux measurements for Cell 3 are presented in separate reports.
REGULATORY REQIDREMENTS FOR THE SITE Radon emissions from the uranium mill tailings at this site are regulated by the State of Utah's Division of Radiation Control and administered by the Utah Division of Air Quality under generally applicable standards set by the U.S. Environmental Protection Agency (EPA) for Operating Mills. Applicable regulations are specified in 40 CFR Part 61, Subpart W, National Emission Standards for Radon Emissions from Operating Mill Tailings, with technical procedures in Appendix B. At present, there are no Subpart T uranium mill tailings at this site. These regulations are a subset of the NESHAPs. According to subsection 61.252 Standard, (a) radon-222 emissions to ambient air from an existing uranium mill tailings pile shall not exceed an average of 20 pCi/m2-s for each pile (or cell). Subsection 61.25 3, Determining Compliance, states that: 11 Compliance with the emission standard in this subpart shall be determined annually through the use of Method 115 of Appendix B. 11 Cell 1 is completely covered with standing liquid and therefore no radon flux measurements are required on Celll. The repaired Cell4A, and newly constructed Cell4B, were both constructed after December 15, 1989 and each was constructed with less than 40 acres surface area. Cell 4A and 4B comply with the requirements of 40 CFR 61.252(b), therefore no radon flux measurements are required on either Cell4A or 4B.
ACCURACY APPRAISAL TABLE JULY 2015 RADON SAMPLING
ENERGY FUELS RESOURCES WHITE MESA MILL, BLANDING, UTAH 2015 NESHAPs RADON FLUX MEASUREMENTS CELL2