Policy Replication

Evaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)

Docket document2006-07-25 · EPA · report · EPA-HQ-OAR-2004-0025-0097
RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0025

Other documents for the same rulemaking (all, by stage)

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan
2006-07-25 Docket documentIndividual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)
2006-07-25 Docket documentPEER 1-Conceptual Models Peer Review (CMPR)
2006-07-25 Docket documentInternational Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)
2006-07-25 Docket documentII-G-21: Conceptual Models Second Supplementary Peer Review Report

References

Page 3Download these results: CSV · JSON
Vaughn, in WPO 31084, Sandia National Laboratory, January 16, 1997.
research reportNot linked to a paper · refsec
EEG/Brine reservoirs/3/14/97/p.2 The DOE Conceptual Model Peer Review Panel, in their December 1996 report, essentially agrees with the EEG position, but has accepted the DOE position that there are no significant consequences of the probability and volume assumptions. The EEG does not accept the "no consequence" argument that is based on piecemeal, partial sensitivity analyses. Revisions to Parameters On January 16, 1997, Rick Beauheim of Sandia National Laboratories recommended revising five parameters describing the Castile brine reservoir conditions1. The reasons for these changes are presented in the parameter record packages WPO 31070, 31072, 31082, 31083, and 31084. Even though the parameter ranges recommended by Beauheim are more reasonable than the ones used in the CCA, the EEG disagrees with the recommended values for reservoir volume because the range includes the value derived from testing the ERDA-6 brine reservoir and initial pressure because of the use of data from twelve other brine encounters in the Salado. The combination of the TDEM survey and the estimates of the areal extent of the WIPP-12 brine reservoir provides a strong evidence that the WIPP-12 reservoir and the brine under the repository are one and the same. Therefore, only the WIPP-12 brine reservoir characteristics should be used to define the parameters used in the CCA performance assessment. Beauheim points out that the parameters should be constrained by what he terms the productivity
journal articleNot linked to a paper · refsec
ERDA-6 data should not be used because it is irrelevant to the present WIPP site. Thus, with porosity fixed, the reservoir volume (V) should be inversely correlated with the sampled value of rock compressibility so that PR equals 4x10-2 m3/Pa. Attached is a figure from an October 3, 1996 memo from Rick Beauheim to Les Shephard2 showing PR calculated from the sampled parameters of the CCA calculations. The figure has been modified to point out the 4x10-2 m3/Pa value determined for WIPP-12. Only five out of 300 samples were as large as the WIPP-12
research reportNot linked to a paper · refsec
Swift, P.N., K.W. Larson, and R.L. Beauheim, Treatment of Castile Brine Reservoir in the 1996 CCA Performance Assessment, Memo to L.E. Shephard, WPO 41885, Sandia National
research reportNot linked to a paper · refsec
Laboratory, October 3, 1996. EEG/Brine reservoirs/3/14/97/p.3 measurements. This figure clearly demonstrates the inappropriateness of the Castile brine parameters used in the CCA calculations. The recommended initial pressure range of 16.5 to 11.0 MPa gage is based on pressure measurements from thirteen Castile brine encounters. At WIPP-12 the measured pressure was 12.6 MPa gage. Therefore, the reservoir pressure should be a constant value of 12.6 MPa gage in the revised CCA calculations. Comparison of WIPP-12 Brine Reservoir and the CCA Assumptions Parameter
research reportNot linked to a paper · refsec
CMPRR-Suppl., 12/1996, p. 42; To the Culebra, after 6 encounters
research reportNot linked to a paper · refsec
CMPRR-Suppl., 12/1996, p. 42; In 10,000 years Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
journal articleNot linked to a paper · refsec
Hora, S.C., von Winderfeldt, D., and Trauth, K.M., 1991. Expert Judgment on Inadvertent Human Intrusion into the Waste Isolation Pilot Plant. SAND90-3063. Sandia National Laboratories.
research reportNot linked to a paper · refsec
Glickman, T., Singer, M., Rosenberg, N., Vinovskis, M., 1991. The Report of the Washington Area Second Team on Future Inadvertent Human Intrusion into the WIPP Repository. Appendix F to SAND90-3063. Sandia National Laboratories.
research reportNot linked to a paper · refsec
Hora, S.C., 1992. Probabilities of Human Intrusion into the WIPP Methodology for the 1992 Preliminary Comparison, August 25, 1992. Appendix to SAND92-0700, pp. A-69 to A-99.
research reportNot linked to a paper · refsec
Gordon, T.J., Baram, M., Bell, W., Cohen, B., 1990. Inadvertent Intrusion into WIPP: Some Potential Futures. Appendix C to SAND90-3063. Sandia National Laboratories. Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
journal articleNot linked to a paper · refsec
PASSIVE INSTITUTIONAL CONTROL The CCA claims that passive institutional control will be 99% effective in deterring drilling into the repository from 100 years to 700 years after closure. The components of passive institutional control include government ownership, records, and markers. Based on the DOE's experience with institutional controls in the recent past, a claim of 99% credit for passive institutional controls for 700 years does not appear justifiable. Government Ownership and Regulation With respect to the government ownership, the DOE maintains that "the controls that are crucial to protect the site from inadvertent exploration are BLM leasing procedures and lease records and the internal procedures of the BLM which require the DOE's review and comment for any permit application to drill within one mile of the WIPP site."1 On October 26, 1990, the DOE and the
research reportNot linked to a paper · refsec
MOU specifically required the BLM to notify the DOE of applications for permit to drill for oil and gas within one mile of the WIPP Site Boundary and that "drilling approval will be withheld until comments are received from the DOE."2 The MOU was revoked on October 30, 1992 with the passage of the 1992 WIPP Land Withdrawal Act3 (Section 3 (b)). How effective was the
research reportNot linked to a paper · refsec
MOU. The BLM approved an application to drill Well #4, Section 26, T22S, R31E, on October 15, 1991. Two days later, the BLM4 sent a letter to the DOE requesting a review of an "Application for Permit to Drill" within one mile of the WIPP Site Boundary. The BLM received DOE's review5 on October 25, 1991. However, not only had the application already been approved by
research reportNot linked to a paper · refsec
EEG/Passive Institutional Control/3/14/97/p.2 The MOU failed in twenty-two out of twenty-five applications for an institutional failure rate of 88%. EEG notified DOE of this lapse in institutional control in 19936,7. Fifty-five subsequent applications, processed through July 1994, showed a failure rate of 9%. Records A recent example illustrates the failure of records to communicate important information prohibiting drilling in a certain area. In 1978, the DOE purchased leases in the vicinity of the current WIPP site for the explicit purpose of preventing drilling. One area was the N2 NW3 of Section 6 T23S, R31E (eighty acres) for which the DOE paid Bass Enterprises et al. $207,972 not to drill through the uppermost 6000 feet8,9. In April 1993, Bass Enterprises et al. applied to the BLM to directionally drill eight wells from Section 6 locations outside the WIPP Site to their oil and gas lease reserves 6000 feet below the
research reportNot linked to a paper · refsec
WIPP Site. In August 1994, the BLM denied the drilling applications citing the WIPP Land Withdrawal Act.10 In January 1995, Bass et al. filed a claim in federal court for a takings.11 In June 1996, the federal court awarded Bass et al. $8.9 million plus interest.12 Despite the active involvement of attorneys and officials for the oil companies and four federal agencies (DOE, BLM, EPA, and the Justice Department), the 1978 judgment, forbade drilling wells in Section 6 T23S, R31E, was not discovered until after the June 1996 judgment.13,14,15 (Refs. 14 and 15 attached). Subsequent appeal by the Justice Department states: Among the issues that could be addressed on remand are the implication of the discovery, made after the notice of appeal was entered in this case, that Bass did not have the right to drill from three of the locations from which it proposed to drill C and for which it sought and received compensation C because DOE had
research reportNot linked to a paper · refsec
EEG/Passive Institutional Control/3/14/97/p.3 condemned those surface locations in 1977.13
research reportNot linked to a paper · refsec
Hence, in less than twenty years, records failed to communicate important information concerning the restriction against drilling for oil and gas. Furthermore, a vertical gas well, James Ranch Unit 73, was drilled and completed on the eighty acres in July 1996 prior to the discovery of the lease records by the attorneys for the various federal agencies. Markers "Any compliance application shall include the period of time passive institutional controls are expected to endure and be understood."16. On October 26, 1963 a twelve kiloton device was detonated underground at Fourmile Canyon, Nevada. The site was designated as the Shoal Site. In the late 1970's the DOE placed a substantial marker consisting of a brass plaque set in a concrete podium and anchored to a concrete base at ground zero. By 1985, the marker at the Shoal site had been completely destroyed by a massive explosion with pieces of marker scattered to the west. The brass plaque had disappeared. Shown below are the gathered remains of a DOE marker intended to identify an area contaminated by radioactive fission products. This marker lasted less than ten years. This example raises questions on the DOE's commitment to maintain a marker at WIPP.
research reportNot linked to a paper · refsec
Arthur, W.J., 1992. November 3 letter from the WIPP Project Director to R.H. Neill, Director of the Environmental Evaluation Group. U.S. Department of Energy/U.S Department of Interior, Bureau of Land Management. October 26, 1990 Memorandum of Understanding cited by the 1991 Administrative Land
research reportNot linked to a paper · refsec
Withdrawal, 43 CFR Public Lands Order 6826, January 22, 1991. U.S. Congress, 1992. Waste Isolation Pilot Plant Land Withdrawal Act. Public Law 102­ 579, 102d Congress.
research reportNot linked to a paper · refsec
Manus, R.L., 1991. October 17 letter from BLM Carlsbad Resource Area Manager to A.
research reportNot linked to a paper · refsec
Hunt, DOE WIPP Project Manager. Becker, R.M., 1991. October 23 letter from DOE Repository Technology Group to R.L.
research reportNot linked to a paper · refsec
Neill, R.H., 1993. March 9 letter from the Director of the Environmental Evaluation Group to W.J. Arthur, WIPP Project Director.
research reportNot linked to a paper · refsec
Neill, R.H., 1993. May 26 letter from the Director of the Environmental Evaluation Group to A. Hunt, WIPP Project Manager.
research reportNot linked to a paper · refsec
McGough, J. M., 1981. December 30 letter to G. B. Koski, Area Manager, U.S. Bureau of Land Management, Carlsbad Office.
research reportNot linked to a paper · refsec
Silva, M.K. and Channell, J.K., 1992. Implications of Oil and Gas Leases on the WIPP on Compliance with EPA TRU Waste Disposal Standards. EEG-50.
research reportNot linked to a paper · refsec
Calkins, W.C., 1994. August 22 letter from the U.S. DOI/BLM State Director for New Mexico to Keith E. Bucy of Bass Enterprises Production Company. Bass Enterprises Production Company et al., 1995. January 23 Complaint for a taking in violation of the U.S. Constitution. Case 95-52L, U.S. Court of Federal Claims,
research reportNot linked to a paper · refsec
Washington D.C. Hodges, R.H. Jr., 1996. June 20 Judgment of the United State Court of Federal Claims. 95-CV-52.
research reportNot linked to a paper · refsec
Schiffer, L.J., 1996. Appeal from a judgment of the United States Court of Federal Claims in 95-CV-52 entered June 21, 1996, Judge Robert H. Hodges, Jr.
research reportNot linked to a paper · refsec
Neill, R.H., 1997. January 3 letter from the Director of the Environmental Evaluation Group to Susan Cook, Attorney for the U.S. Justice Department.
research reportNot linked to a paper · refsec
Martin, M.K., 1997. February 13, 1997 letter from Attorney for the U.S. Justice Department to R.H. Neill, Director of the Environmental Evaluation Group. U.S. Environmental Protection Agency, 1996a. 40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 Disposal Regulations, Final Rule. Federal Register (9 February) vol. 61, no. 28, 5224-5245. Environmental Evaluation Group Review of the WIPP CCA, 3/14/97
journal articleNot linked to a paper · refsec
EEG/Potash Mining/3/14/96/p. 5 The objectives of the state are also "to prevent waste, protect correlative rights, assure maximum conservation of the oil, gas and potash resources of New Mexico, and permit the economic recovery of oil, gas, and potash minerals..." (LeMay et al. 1988). Recommendation
research reportNot linked to a paper · refsec
Cone, L.M., 1995. Oct 12 letter from U.S. DOI/BLM District Manager to G.B. Griswold. U.S. Department of Interior, 1993. Preliminary Map Showing Distribution of Potash
research reportNot linked to a paper · refsec
Broadhead, R.F., F. Luo, and S.W. Speer, 1995. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Carlsbad, NM: Westinghouse Electric
research reportNot linked to a paper · refsec
Vaughn, G.L., 1995. December 13 Agency Answer to Appellant's Statement of Reasons by U.S. Department of Interior Bureau of Land Management General Counsel. Yates et al., appellants. IBLA 92-612.
research reportNot linked to a paper · refsec
Griswold, G.B., 1995a. Method of Potash Reserve Evaluation, In Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Carlsbad, NM: Westinghouse Electric Corporation. Waste Isolation Division, vol. 2, Chapter VII.
research reportNot linked to a paper · refsec
Griswold, G.B., 1995b. October 16 letter to J. Barker, of the New Mexico Bureau of Mines and Mineral Resources, P. Anselmo of the New Mexico Institute of Mining and
research reportNot linked to a paper · refsec
Technology, W. Thayer of IMC Corporation, and S. Patchet of Westinghouse Waste Isolation Division. U.S. Department of Energy, 1996. Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant. DOE/CAO-1996-2184. Federal Land Policy and Management Act of 1976. U.S. Code Annotated, 1989. vol. 43, secs. 1701-1784. Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
journal articleNot linked to a paper · refsec
CCA Appendix PAR Values Differ from PA Code Values The parameter database used to construct Appendix PAR is different than the parameter database used by the computer codes at the time PA analysis for the CCA was performed. A later version of the parameter database, in which different values for some of the parameters had been added, was used for Appendix PAR, according to SNL personnel. Table PAR-12 in the CCA shows Parameter ID # 3148, bulk compressibility (COMP_RCK CONC_PLG), to have a value of 1.2E-09 Pa-1, whereas the value used in the CCA PA calculations was 2.64E-09 Pa-1. Supporting documentation (Form 464s in WPO # 36591) indicates the value was 0 Pa-1 from March 14, 1996, to May 2, 1996, when it was changed to the 1.2E-09 Pa-1 value. The 264E-09 Pa-1 value apparently preceded the March 14, 1996 date. This implies that the parameter database used in the CCA PA may have preceded the March 14, 1996 date. A June 17-21, 1996, CAO audit of SNL (A-96-03) discovered that many parameters had been entered into the database without following proper procedure, which included not only completion of records but also required reviews and sign-offs before entry into the database. The list of such parameters eventually grew to more than 230 (out of 1500 total parameters). If the
datasetNot linked to a paper · refsec
Bynum, R.V., 1997. Chemical Conditions Model:
research reportNot linked to a paper · refsec
Novak, C.F., 1997. Memorandum from Craig F. Novak to R. Vann Bynum “Calculation of Actinide Solubilities in WIPP SPC and ERDA6 Brines Under MgO Backfill Scenarios Containing Nesquehonite or Hydromagnesite as the MgO-CO3 Solubility-limiting Phase”. Albuquerque, NM: Sandia National Laboratories. WPO# 46124. U.S. Department of Energy, 1996. Title 40 CFR 191 Compliance Certification Application. DOE/CAO-1996-2184. Nesquehonite
research reportNot linked to a paper · refsec
Bean, J.E., M.E. Lord, D.A. McArthur, R.J. MacKinnon, J.D. Miller, and J.E Schrieber, , 1996, Analysis Package for the Salado Flow Calculations (Task 1) of the Performance Assessment Analysis Supporting the Compliance Certification Application (WPO # 40514).
government reportNot linked to a paper · refsec
DOE, Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant, DOE/CAO-1996-2184,
research reportNot linked to a paper · refsec
December, 1996. Helton, J., Memo: Preliminary Summary of Uncertainty and Sensitivity Analysis Results Obtained in Support of the 1996 Compliance Certification Application for the Waste Isolation Pilot Plant, Sandia National Laboratories, December, 1996.
research reportNot linked to a paper · refsec
Geometry, Memorandum to D.R. Anderson, January 26, 1996, WPO 30840, Sandia National Laboratory, Attachment 4-1 to Appendix Mass of the Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant, DOE/CAO1996-2184, December, 1996. Figures Figure 1: Average Pressure in Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 2: Cumulative Net Brine in and outflow at Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 3: Average Gas Saturation in Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 4: Three dimensional scatter plots for volume of brine reaching the surface due to direct brine release for a drilling intrusion into the lower panel.
research reportNot linked to a paper · refsec
From Helton, 1996. Figure 5: Fraction of Initial Iron Remaining in Repository From: DOE, 1996. Figure 6: Remaining Fraction of Steel Inventory in Waste Panel Modified from Figure 2.2.9 in Helton, 1996. Figure 7: Cumulative Volume of Brine Consumed by Corrosion in the Repository Modified from: Helton, 1996. Figure 8: Cumulative Volume of Brine Consumed in the Waste Panel From Bean et al., 1996 Figure 9: Percentile curves for three replicated LHSs for pressure in waste panel From: Helton, 1996. Figure 10: Pressure in waste panel Modified from Figure 2.3.1 of Helton, 1996. Figure 11: Mean CCDFs for Specific Release Modes, Replicate 1.
research reportNot linked to a paper · refsec
From DOE, 1996. Figure 12: Scatter Plots of the Fraction of Iron Remaining in the Waste Panel (Right Frames) and Rest of the Repository (Left Frames) for Undisturbed Conditions at 10,000 Years.
research reportNot linked to a paper · refsec
From Helton, 1996. Figure 13: Scatter plot of pressure versus total pore volume in the repository.
research reportNot linked to a paper · refsec
From Helton, 1996. Tables Table 1: Stepwise Regression Analysis with Rank-Transformed Data for Pressure in the Waste panel at 10000 years. From Helton, 1996. Table 2: Stepwise Regression Analysis with Rank-Transformed Data for Fraction of Steel Remaining and Total Gas Generation in Upper and Lower Waste Panels at 10000 years.
datasetNot linked to a paper · refsec
From Helton, 1996. FULL TEXT OF ORIGINAL EEG COMMENT Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
journal articleNot linked to a paper · refsec
← PreviousNext →