Evaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
Other documents for the same rulemaking (all, by stage)
References
Vaughn, in WPO 31084, Sandia National Laboratory, January 16, 1997.
EEG/Brine reservoirs/3/14/97/p.2 The DOE Conceptual Model Peer Review Panel, in their December 1996 report, essentially agrees with the EEG position, but has accepted the DOE position that there are no significant consequences of the probability and volume assumptions. The EEG does not accept the "no consequence" argument that is based on piecemeal, partial sensitivity analyses. Revisions to Parameters On January 16, 1997, Rick Beauheim of Sandia National Laboratories recommended revising five parameters describing the Castile brine reservoir conditions1. The reasons for these changes are presented in the parameter record packages WPO 31070, 31072, 31082, 31083, and 31084. Even though the parameter ranges recommended by Beauheim are more reasonable than the ones used in the CCA, the EEG disagrees with the recommended values for reservoir volume because the range includes the value derived from testing the ERDA-6 brine reservoir and initial pressure because of the use of data from twelve other brine encounters in the Salado. The combination of the TDEM survey and the estimates of the areal extent of the WIPP-12 brine reservoir provides a strong evidence that the WIPP-12 reservoir and the brine under the repository are one and the same. Therefore, only the WIPP-12 brine reservoir characteristics should be used to define the parameters used in the CCA performance assessment. Beauheim points out that the parameters should be constrained by what he terms the productivity
ERDA-6 data should not be used because it is irrelevant to the present WIPP site. Thus, with porosity fixed, the reservoir volume (V) should be inversely correlated with the sampled value of rock compressibility so that PR equals 4x10-2 m3/Pa. Attached is a figure from an October 3, 1996 memo from Rick Beauheim to Les Shephard2 showing PR calculated from the sampled parameters of the CCA calculations. The figure has been modified to point out the 4x10-2 m3/Pa value determined for WIPP-12. Only five out of 300 samples were as large as the WIPP-12
Swift, P.N., K.W. Larson, and R.L. Beauheim, Treatment of Castile Brine Reservoir in the 1996 CCA Performance Assessment, Memo to L.E. Shephard, WPO 41885, Sandia National
Laboratory, October 3, 1996. EEG/Brine reservoirs/3/14/97/p.3 measurements. This figure clearly demonstrates the inappropriateness of the Castile brine parameters used in the CCA calculations. The recommended initial pressure range of 16.5 to 11.0 MPa gage is based on pressure measurements from thirteen Castile brine encounters. At WIPP-12 the measured pressure was 12.6 MPa gage. Therefore, the reservoir pressure should be a constant value of 12.6 MPa gage in the revised CCA calculations. Comparison of WIPP-12 Brine Reservoir and the CCA Assumptions Parameter
CMPRR-Suppl., 12/1996, p. 42; To the Culebra, after 6 encounters
CMPRR-Suppl., 12/1996, p. 42; In 10,000 years Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
Hora, S.C., von Winderfeldt, D., and Trauth, K.M., 1991. Expert Judgment on Inadvertent Human Intrusion into the Waste Isolation Pilot Plant. SAND90-3063. Sandia National Laboratories.
Glickman, T., Singer, M., Rosenberg, N., Vinovskis, M., 1991. The Report of the Washington Area Second Team on Future Inadvertent Human Intrusion into the WIPP Repository. Appendix F to SAND90-3063. Sandia National Laboratories.
Hora, S.C., 1992. Probabilities of Human Intrusion into the WIPP Methodology for the 1992 Preliminary Comparison, August 25, 1992. Appendix to SAND92-0700, pp. A-69 to A-99.
Gordon, T.J., Baram, M., Bell, W., Cohen, B., 1990. Inadvertent Intrusion into WIPP: Some Potential Futures. Appendix C to SAND90-3063. Sandia National Laboratories. Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
PASSIVE INSTITUTIONAL CONTROL The CCA claims that passive institutional control will be 99% effective in deterring drilling into the repository from 100 years to 700 years after closure. The components of passive institutional control include government ownership, records, and markers. Based on the DOE's experience with institutional controls in the recent past, a claim of 99% credit for passive institutional controls for 700 years does not appear justifiable. Government Ownership and Regulation With respect to the government ownership, the DOE maintains that "the controls that are crucial to protect the site from inadvertent exploration are BLM leasing procedures and lease records and the internal procedures of the BLM which require the DOE's review and comment for any permit application to drill within one mile of the WIPP site."1 On October 26, 1990, the DOE and the
MOU specifically required the BLM to notify the DOE of applications for permit to drill for oil and gas within one mile of the WIPP Site Boundary and that "drilling approval will be withheld until comments are received from the DOE."2 The MOU was revoked on October 30, 1992 with the passage of the 1992 WIPP Land Withdrawal Act3 (Section 3 (b)). How effective was the
MOU. The BLM approved an application to drill Well #4, Section 26, T22S, R31E, on October 15, 1991. Two days later, the BLM4 sent a letter to the DOE requesting a review of an "Application for Permit to Drill" within one mile of the WIPP Site Boundary. The BLM received DOE's review5 on October 25, 1991. However, not only had the application already been approved by
EEG/Passive Institutional Control/3/14/97/p.2 The MOU failed in twenty-two out of twenty-five applications for an institutional failure rate of 88%. EEG notified DOE of this lapse in institutional control in 19936,7. Fifty-five subsequent applications, processed through July 1994, showed a failure rate of 9%. Records A recent example illustrates the failure of records to communicate important information prohibiting drilling in a certain area. In 1978, the DOE purchased leases in the vicinity of the current WIPP site for the explicit purpose of preventing drilling. One area was the N2 NW3 of Section 6 T23S, R31E (eighty acres) for which the DOE paid Bass Enterprises et al. $207,972 not to drill through the uppermost 6000 feet8,9. In April 1993, Bass Enterprises et al. applied to the BLM to directionally drill eight wells from Section 6 locations outside the WIPP Site to their oil and gas lease reserves 6000 feet below the
WIPP Site. In August 1994, the BLM denied the drilling applications citing the WIPP Land Withdrawal Act.10 In January 1995, Bass et al. filed a claim in federal court for a takings.11 In June 1996, the federal court awarded Bass et al. $8.9 million plus interest.12 Despite the active involvement of attorneys and officials for the oil companies and four federal agencies (DOE, BLM, EPA, and the Justice Department), the 1978 judgment, forbade drilling wells in Section 6 T23S, R31E, was not discovered until after the June 1996 judgment.13,14,15 (Refs. 14 and 15 attached). Subsequent appeal by the Justice Department states: Among the issues that could be addressed on remand are the implication of the discovery, made after the notice of appeal was entered in this case, that Bass did not have the right to drill from three of the locations from which it proposed to drill C and for which it sought and received compensation C because DOE had
EEG/Passive Institutional Control/3/14/97/p.3 condemned those surface locations in 1977.13
Hence, in less than twenty years, records failed to communicate important information concerning the restriction against drilling for oil and gas. Furthermore, a vertical gas well, James Ranch Unit 73, was drilled and completed on the eighty acres in July 1996 prior to the discovery of the lease records by the attorneys for the various federal agencies. Markers "Any compliance application shall include the period of time passive institutional controls are expected to endure and be understood."16. On October 26, 1963 a twelve kiloton device was detonated underground at Fourmile Canyon, Nevada. The site was designated as the Shoal Site. In the late 1970's the DOE placed a substantial marker consisting of a brass plaque set in a concrete podium and anchored to a concrete base at ground zero. By 1985, the marker at the Shoal site had been completely destroyed by a massive explosion with pieces of marker scattered to the west. The brass plaque had disappeared. Shown below are the gathered remains of a DOE marker intended to identify an area contaminated by radioactive fission products. This marker lasted less than ten years. This example raises questions on the DOE's commitment to maintain a marker at WIPP.
Arthur, W.J., 1992. November 3 letter from the WIPP Project Director to R.H. Neill, Director of the Environmental Evaluation Group. U.S. Department of Energy/U.S Department of Interior, Bureau of Land Management. October 26, 1990 Memorandum of Understanding cited by the 1991 Administrative Land
Withdrawal, 43 CFR Public Lands Order 6826, January 22, 1991. U.S. Congress, 1992. Waste Isolation Pilot Plant Land Withdrawal Act. Public Law 102 579, 102d Congress.
Manus, R.L., 1991. October 17 letter from BLM Carlsbad Resource Area Manager to A.
Hunt, DOE WIPP Project Manager. Becker, R.M., 1991. October 23 letter from DOE Repository Technology Group to R.L.
Neill, R.H., 1993. March 9 letter from the Director of the Environmental Evaluation Group to W.J. Arthur, WIPP Project Director.
Neill, R.H., 1993. May 26 letter from the Director of the Environmental Evaluation Group to A. Hunt, WIPP Project Manager.
McGough, J. M., 1981. December 30 letter to G. B. Koski, Area Manager, U.S. Bureau of Land Management, Carlsbad Office.
Silva, M.K. and Channell, J.K., 1992. Implications of Oil and Gas Leases on the WIPP on Compliance with EPA TRU Waste Disposal Standards. EEG-50.
Calkins, W.C., 1994. August 22 letter from the U.S. DOI/BLM State Director for New Mexico to Keith E. Bucy of Bass Enterprises Production Company. Bass Enterprises Production Company et al., 1995. January 23 Complaint for a taking in violation of the U.S. Constitution. Case 95-52L, U.S. Court of Federal Claims,
Washington D.C. Hodges, R.H. Jr., 1996. June 20 Judgment of the United State Court of Federal Claims. 95-CV-52.
Schiffer, L.J., 1996. Appeal from a judgment of the United States Court of Federal Claims in 95-CV-52 entered June 21, 1996, Judge Robert H. Hodges, Jr.
Neill, R.H., 1997. January 3 letter from the Director of the Environmental Evaluation Group to Susan Cook, Attorney for the U.S. Justice Department.
Martin, M.K., 1997. February 13, 1997 letter from Attorney for the U.S. Justice Department to R.H. Neill, Director of the Environmental Evaluation Group. U.S. Environmental Protection Agency, 1996a. 40 CFR Part 194, Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance with the 40 CFR Part 191 Disposal Regulations, Final Rule. Federal Register (9 February) vol. 61, no. 28, 5224-5245. Environmental Evaluation Group Review of the WIPP CCA, 3/14/97
EEG/Potash Mining/3/14/96/p. 5 The objectives of the state are also "to prevent waste, protect correlative rights, assure maximum conservation of the oil, gas and potash resources of New Mexico, and permit the economic recovery of oil, gas, and potash minerals..." (LeMay et al. 1988). Recommendation
Cone, L.M., 1995. Oct 12 letter from U.S. DOI/BLM District Manager to G.B. Griswold. U.S. Department of Interior, 1993. Preliminary Map Showing Distribution of Potash
Broadhead, R.F., F. Luo, and S.W. Speer, 1995. Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Carlsbad, NM: Westinghouse Electric
Vaughn, G.L., 1995. December 13 Agency Answer to Appellant's Statement of Reasons by U.S. Department of Interior Bureau of Land Management General Counsel. Yates et al., appellants. IBLA 92-612.
Griswold, G.B., 1995a. Method of Potash Reserve Evaluation, In Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Carlsbad, NM: Westinghouse Electric Corporation. Waste Isolation Division, vol. 2, Chapter VII.
Griswold, G.B., 1995b. October 16 letter to J. Barker, of the New Mexico Bureau of Mines and Mineral Resources, P. Anselmo of the New Mexico Institute of Mining and
Technology, W. Thayer of IMC Corporation, and S. Patchet of Westinghouse Waste Isolation Division. U.S. Department of Energy, 1996. Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant. DOE/CAO-1996-2184. Federal Land Policy and Management Act of 1976. U.S. Code Annotated, 1989. vol. 43, secs. 1701-1784. Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97
CCA Appendix PAR Values Differ from PA Code Values The parameter database used to construct Appendix PAR is different than the parameter database used by the computer codes at the time PA analysis for the CCA was performed. A later version of the parameter database, in which different values for some of the parameters had been added, was used for Appendix PAR, according to SNL personnel. Table PAR-12 in the CCA shows Parameter ID # 3148, bulk compressibility (COMP_RCK CONC_PLG), to have a value of 1.2E-09 Pa-1, whereas the value used in the CCA PA calculations was 2.64E-09 Pa-1. Supporting documentation (Form 464s in WPO # 36591) indicates the value was 0 Pa-1 from March 14, 1996, to May 2, 1996, when it was changed to the 1.2E-09 Pa-1 value. The 264E-09 Pa-1 value apparently preceded the March 14, 1996 date. This implies that the parameter database used in the CCA PA may have preceded the March 14, 1996 date. A June 17-21, 1996, CAO audit of SNL (A-96-03) discovered that many parameters had been entered into the database without following proper procedure, which included not only completion of records but also required reviews and sign-offs before entry into the database. The list of such parameters eventually grew to more than 230 (out of 1500 total parameters). If the
Bynum, R.V., 1997. Chemical Conditions Model:
Novak, C.F., 1997. Memorandum from Craig F. Novak to R. Vann Bynum “Calculation of Actinide Solubilities in WIPP SPC and ERDA6 Brines Under MgO Backfill Scenarios Containing Nesquehonite or Hydromagnesite as the MgO-CO3 Solubility-limiting Phase”. Albuquerque, NM: Sandia National Laboratories. WPO# 46124. U.S. Department of Energy, 1996. Title 40 CFR 191 Compliance Certification Application. DOE/CAO-1996-2184. Nesquehonite
Bean, J.E., M.E. Lord, D.A. McArthur, R.J. MacKinnon, J.D. Miller, and J.E Schrieber, , 1996, Analysis Package for the Salado Flow Calculations (Task 1) of the Performance Assessment Analysis Supporting the Compliance Certification Application (WPO # 40514).
DOE, Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant, DOE/CAO-1996-2184,
December, 1996. Helton, J., Memo: Preliminary Summary of Uncertainty and Sensitivity Analysis Results Obtained in Support of the 1996 Compliance Certification Application for the Waste Isolation Pilot Plant, Sandia National Laboratories, December, 1996.
Geometry, Memorandum to D.R. Anderson, January 26, 1996, WPO 30840, Sandia National Laboratory, Attachment 4-1 to Appendix Mass of the Title 40 CFR Part 191 Compliance Certification Application for the Waste Isolation Pilot Plant, DOE/CAO1996-2184, December, 1996. Figures Figure 1: Average Pressure in Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 2: Cumulative Net Brine in and outflow at Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 3: Average Gas Saturation in Repository, FEP S-1 Analysis From Vaughn et al, 1996. Figure 4: Three dimensional scatter plots for volume of brine reaching the surface due to direct brine release for a drilling intrusion into the lower panel.
From Helton, 1996. Figure 5: Fraction of Initial Iron Remaining in Repository From: DOE, 1996. Figure 6: Remaining Fraction of Steel Inventory in Waste Panel Modified from Figure 2.2.9 in Helton, 1996. Figure 7: Cumulative Volume of Brine Consumed by Corrosion in the Repository Modified from: Helton, 1996. Figure 8: Cumulative Volume of Brine Consumed in the Waste Panel From Bean et al., 1996 Figure 9: Percentile curves for three replicated LHSs for pressure in waste panel From: Helton, 1996. Figure 10: Pressure in waste panel Modified from Figure 2.3.1 of Helton, 1996. Figure 11: Mean CCDFs for Specific Release Modes, Replicate 1.
From DOE, 1996. Figure 12: Scatter Plots of the Fraction of Iron Remaining in the Waste Panel (Right Frames) and Rest of the Repository (Left Frames) for Undisturbed Conditions at 10,000 Years.
From Helton, 1996. Figure 13: Scatter plot of pressure versus total pore volume in the repository.
From Helton, 1996. Tables Table 1: Stepwise Regression Analysis with Rank-Transformed Data for Pressure in the Waste panel at 10000 years. From Helton, 1996. Table 2: Stepwise Regression Analysis with Rank-Transformed Data for Fraction of Steel Remaining and Total Gas Generation in Upper and Lower Waste Panels at 10000 years.
From Helton, 1996. FULL TEXT OF ORIGINAL EEG COMMENT Environmental Evaluation Group Review of the WIPP-CCA, 3/14/97