Policy Replication

Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report

Docket document2006-07-25 · EPA · report · EPA-HQ-OAR-2004-0025-0089
RIN 2060-AG85 · Docket EPA-HQ-OAR-2004-0025

Other documents for the same rulemaking (all, by stage)

Docket documentWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening of Public Comment Period
1996-11-15 Federal RegisterDecision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria
1997-10-30 Federal RegisterCriteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision
1998-05-18 Federal RegisterCriteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-05-21 Federal RegisterOpportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision
1998-06-24 Federal RegisterQuality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-03-25 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-04-16 Federal RegisterChange in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant
1999-05-13 Federal RegisterInspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant
1999-05-17 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
1999-10-18 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
1999-12-08 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2000-04-14 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2000-08-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2000-11-28 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-04-05 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2001-07-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant
2001-11-27 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant
2002-02-13 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant
2002-03-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant
2002-05-20 Federal RegisterWaste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste
2003-07-28 Docket documentIdaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)
2005-08-29 Docket documentDraft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]
2005-11-03 Docket documentFinal Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]
2006-07-24 Docket documentTechnical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities
2006-07-24 Docket documentTechnical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review
2006-07-24 Docket documentTechnical Support Document for 194.27: Salado Flow Conceptual Models Peer Review
2006-07-24 Docket documentTechnical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment
2006-07-24 Docket documentTechnical Support Document for Section 194.27: Spallings Conceptual Model Peer Review
2006-07-24 Docket documentTechnical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review
2006-07-24 Docket documentTechnical Support Document for Section 194.14: Evaluation of Karst at the WIPP Site
2006-07-24 Docket documentTechnical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation
2006-07-24 Docket documentTechnical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation
2006-07-25 Docket documentComparison of Effects of Brine Pocket Size
2006-07-25 Docket documentPlutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)
2006-07-25 Docket documentSensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)
2006-07-25 Docket documentSalado Flow Peer Review Plan
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report
2006-07-25 Docket documentII-G-22: Conceptual Models Third Supplementary Peer Review Report
2006-07-25 Docket documentII-G-12: Conceptual Models Supplementary Peer Review Report
2006-07-25 Docket documentWaste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report
2006-07-25 Docket documentSpallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow
2006-07-25 Docket documentWaste Isolation Pilot Plant: Conceptual Models Peer Review Report
2006-07-25 Docket documentQuality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]
2006-07-25 Docket documentEvaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)
2006-07-25 Docket documentAnalysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)
2006-07-25 Docket documentWaste Isolation Pilot Plant: Spallings Peer Review Plan
2006-07-25 Docket documentIndividual Radiation Doses From Transuranic Waste Brought To The Surface By Human Intrusion At The WIPP [DOE/AL/58309-66] (EEG-66)
2006-07-25 Docket documentPEER 1-Conceptual Models Peer Review (CMPR)
2006-07-25 Docket documentEvaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
2006-07-25 Docket documentInternational Peer Review of the 1996 Performance Assessment of the US Waste Isolation Pilot Plant (WIPP)
2006-07-25 Docket documentII-G-21: Conceptual Models Second Supplementary Peer Review Report

References

Page 1Download these results: CSV · JSON
Mexico, by the Department of Energy (DOE) as the United States’ first underground repository licensed to safely and permanently dispose of transuranic radioactive waste resulting from the research and production of nuclear weapons programs. The first shipment of transuranic waste arrived at WIPP on April 6, 1999. Peer review of conceptual models developed by the DOE for the WIPP is required by 40
research reportNot linked to a paper · refsec
CFR Part 194.27, which was promulgated by the Environmental Protection Agency (EPA) in 1996. In accordance with this requirement, the Carlsbad Field Office (CBFO) of the DOE has conducted a peer review of three conceptual models that are being revised due to changes invoked by the regulator or due to knowledge gained since the original conceptual models were developed. This peer review addressed revisions to selected salado flow conceptual models that were developed for the Compliance Certification Application (CCA). This report presents the final results of an independent technical peer review of the adequacy of three of the twenty- four conceptual models representing features, processes, and events involved in assessing the long-term performance of the WIPP. These models were identified by the DOE through its scientific advisor, Sandia National Laboratories (SNL). This independent peer review was conducted by a four-member interdisciplinary team having the requisite broad experience and expertise to address the range of issues associated with the ability of WIPP to successfully isolate waste for the 10,000- year regulatory time frame. The peer review was conducted primarily in Carlsbad, New
research reportNot linked to a paper · refsec
Beauheim, R.L. 1996. DRZ Permeability, Revision 1. Records Package. ERMS #232038. Albuquerque, NM.: Sandia National Laboratories.
government reportNot linked to a paper · refsec
Beauheim, R.L.; Roberts, R.M. 2002. Hydraulic-test Interpretation in Systems with Complex Flow Geometries. SAND2000-1588J. Carlsbad, NM: Sandia National Laboratories.
government reportNot linked to a paper · refsec
Brian, C.R., Hansen, F.D., Chapman, D.M., and Snider A.C., 2001. Characteristics of the Disturbed Rock Zone in Salt at the Waste Isolation Pilot Plant, American Association of Rock Mechanics.
research reportNot linked to a paper · refsec
Butcher, B.M., Thompson, T.W., VanBuskirk, R.G., and Patti, N.C. 1991. Mechanical Compaction of Waste Isolation Pilot Plant Simulated Waste. SAND90-1206.
research reportNot linked to a paper · refsec
Christian-Frear, T.L.; Webb, S.W. 1996. Effect of explicit representation of detailed stratigraphy on brine and gas flow at the Waste Isolation Pilot Plant, SAND943173, Albuquerque, NM: Sandia National Laboratories..
research reportNot linked to a paper · refsec
Dunagan, S. 2003. Complimentary Cumulative Distribution Functions (CCDF) for the Technical Baseline Migration (TBM), Rev 0. Carlsbad, NM: Sandia National Laboratories. ERMS #525707.
research reportNot linked to a paper · refsec
Freeze, G.A., Larson, K.W. Davies, P.B. 1995. Coupled Multiphase Flow and Closure Analysis of Repository Response to Waste Generated Gas at the Waste Isolation Pilot Plant (WIPP). SAND93-1986. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Hadug, T. 2002. Analysis Plan for the Analysis of Direct Releases Part of the Technical Baseline Migration, AP-085, Carlsbad, NM: Sandia National Laboratories. ERMS #522634.
research reportNot linked to a paper · refsec
Hansen, C.W., Leigh, C.L., Lord, D. L., Stein, J.S. 2002. BRAGFLO Results for the Technical Baseline Migration, Revision 0. Carlsbad, NM: Sandia National Laboratories. ERMS# 523209
research reportNot linked to a paper · refsec
Hansen, C.W., Leigh, C.L. 2002. A Reconciliation of the CCA and PAVT Parameter
research reportNot linked to a paper · refsec
Holcolm, D.J. and Hardy, R., 2001, Assessing the disturbed rock zone (DRZ) at the Waste Isolation Pilot Plant (WIPP) in salt using ultrasonic waves. DC Rocks 2001, Proceedings of the 38th US Symposium on Rock Mechanics, Washington, DC.
journal articleNot linked to a paper · refsec
Howarth, S.M. and Christian-Frear, T.L. 1997. Porosity, single-phase permeability, and capillary pressure data from preliminary laboratory experiments on selected samples from Marker Bed 139 at the Waste Isolation Pilot Plant underground facility. SAND94-0472/2, Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
James, S.J., Stein, J.S. 2002. Analysis Plan for the Development of a Simplified Shaft Seal Model for the WIPP Performance Assessment, AP-094, Carlsbad, NM: Sandia National Laboratories. ERMS# 524958
research reportNot linked to a paper · refsec
Key, S., et. al. 1994. Background and Basis for the Fluid Flow Model Incorporated in
research reportNot linked to a paper · refsec
Guzowski, H. Iuzzolino, R.P. Rechard, 1989. Performance Assessment Methodology Demonstration: Methodology Development of Evaluating Compliance with US EPA 40 CFR Part 191, Subpart B, for the Waste Isolation Pilot Plant. SAND89-2027. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Park, B.Y. 2002. Analysis Plan for Structural Evaluation of WIPP Disposal Room Raised to Clay Seam G, Rev 1, AP-093. Carlsbad, NM: Sandia National Laboratories. ERMS #524805.
research reportNot linked to a paper · refsec
Stein, J.S., 2002. Analysis Plan for Calculations of Salado Flow: Technical Baseline Migration (TBM), AP-086. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
Stein, J.S. 2002. Minor difference found in TBM grid volumes. Memorandum to M.K.
research reportNot linked to a paper · refsec
Knowles, May 20, 2002. Carlsbad, NM: Sandia National Laboratories. EMRS #522357.
research reportNot linked to a paper · refsec
Stein, J.S., Zelinski, W. 2003. Analysis Plan for the Testing of a Proposed BRAGFLO Grid to be used for the Compliance Recertification Application Performance Assessment Calculations, AP-106, Carlsbad, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
ERMS# 525236 Rechard, R.P., Beyeler, W., McCurley, R.D., Rudeen, D.K., Bean, J.E., and Schreiber, J.D. 1990. Parameter Sensitivity Studies of Selected Components of the Waste Isolation Pilot Plant Repository/Shaft System. SAND89-2030. Albuquerque,
research reportNot linked to a paper · refsec
NM: Sandia National Laboratories. US EPA, 1998. 40CFR Part 194 Final Rule. Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Part 191 Disposal Regulations: Certification Decision, U.S. Environmental Protection
research reportNot linked to a paper · refsec
Webb, S.W., and K.W. Larson. 1996. The Effect of Stratigraphic Dip on Brine and Gas Migration at the Waste Isolation Pilot Plant. SAND94-0932. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
WIPP Performance Assessment Department. l992a. Long-Term Gas and Brine Migration at the Waste Isolation Pilot Plant: Preliminary Sensitivity Analyses for PostClosure 40 CFR Part 268 (RCRA), May 1992. SAND92- l933. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
WIPP Performance Assessment Department. 1992b. Preliminary Performance Assessment for the Waste Isolation Pilot Plan, December 1992- Volume 5: Uncertainty and Sensitivity Analyses of Gas and Brine Migration for Undisturbed Performance. SAND92-0700. Albuquerque, NM: Sandia National Laboratories.
research reportNot linked to a paper · refsec
WIPP Performance Assessment Department, 1993. Preliminary Performance Assessment for the Waste Isolation Pilot Plant, December 1992, Volume 4: Uncertainty and Sensitivity Analyses for 40 CFR Part 191, Subpart B, SAND92-0700/4,
research reportNot linked to a paper · refsec
EPA Principal Investigator for Gas Generation and Source Team models at WIPP (ORIA). Pertinent Research/Other Oxidation of Fe oxides - characterization of oxidation state of 24,000 feet of ash flow core on Yucca Mountain. Determination of Fe oxidation state for paleomagnetic studies at Yucca Mountain. Empirical determination of Hematite-Ilmenite solvus with field samples. Crystal chemical studies of radioactive elements in crystal structures of mineral phases. Technical reviewer for American Mineralogist (1988-1989, 2002-2003) John Gibbons Over thirty years of experience in the geology and mine mechanics of salt deposits, including New Yo rk, New Mexico, Texas, and Kansas bedded salts and domed salts in Louisiana and Texas. Yucca Mountain Project Preparation of site suitability documents for presidential consideration, data qualification and integration for the federal high- level nuclear waste disposal site at Nevada
government reportNot linked to a paper · refsec