Evaluation of the WIPP Project's Compliance with the EPA Radiation Protection Standards for Disposal of Transuranic Waste [DOE/AL/58309-68] (EEG-68)
Other documents for the same rulemaking (all, by stage)
References
IMC Global, Inc. 1-93-03, in Cement Pore Water: A Case Sandia National series radioactive disequilibrium in and fate of reactive pollutants." Annual Report 1996, Serving the Next Agricultural Revolution.
IMC Global, 20,27. 1996. Jackson, D. 1973. "Solution mining pumps new life into Cane Creek potash mine." Engineering and Mining Journal, (July) 59-69. Jacobs, 1998. wins tax break," Jaeger, Cook. News Sun, 19 February, pp. 1, 5. 1976. Fundamentals of Rock Mechanics, 2 edition. London: Chapman and Hall. Jenni M.L. 1994. Rock Mechanics in Salt Mining. Rotterdam, Netherlands: chap. 13. sand gives up secondary oil in West Texas." 1968. (September) 72-76. Jones, World Oil, Assistant Commissioner of New Mexico Public L. 1996. April 29 letter from L. Lands to William Director of the New Mexico Oil Conservation Division. Radiation Surveillance of the 1990. During 1989. Albuquerque, and R.D. Project Environmental Evaluation Group, 1997. Injection Methods: Current Practices and Failure Rates in the Delaware Basin. U.S. Department of Energy, Flanders and R.M. 1985. "Performance of the injection project," in Proceedings of the 60th Society of Petroleum Engineers Annual Technical
Conference, Las Engineers, 89-101. Nevada September 22,1985. Richardson, Society of Petroleum L.F. 1997. "Numerical errors associated with modeling transport and matrix diffusion 78 (17) S138.
Konikow, L.F. 1998. February personal communication, email, from L. Konikow to L.
Konikow, L.F 1996. A Three-Dimensional Solute-Transport Model (MOC3D). U.S. Geological Survey, 4267. 1994. Abandoned
III, M.S. Well Characterization: A Methodology to Evaluate Regional Hydraulic Controls on Flow from Hydrocarbon Reservoirs into Underground Sources of Drinking Water. Austin, Texas: University of Texas at Austin, Bureau of Economic Geology. 1987a. Feasibility Study: Applicability of Methods Involving Lambert, Radiocarbon and Other Hydrology of the Rustler Formation. to the National Laboratories, SAND86-1054. 1987b. "Stable-isotope studies of in Southeaste New Mexico, SAND85-1978c, in the Rustler Formation at the
Carter. 1987. Uranium-Isotope Lambert, S.J. and in Groundwaters of the Rustler New Mexico, I: Principles and Preliminary Formation Northern Delaware Basin, Southeaste National Laboratories, SA D87-0388. Results. .W. 1996. E-mail memo from
Lord, P. on fracture model ideas. M. 1991. January 28 Sandia National Laboratories memorandum to distribution on the water-level rises near the WIPP site, Sandia National Laboratories Fluid anomalous Flow and Transport Division 6344. 1994. An Appraisal of the and R.H.
Chaturvedi, M. K. Lee, 1992 Preliminary Performance Assessment for the Waste Isolation Pilot Plant. Albuquerque,
NM: Environmental Evaluation Group, and R.A. Cole. 1996. Blowout Experiments Using Fine Grained Silica Geometry. Albuquerque, NM: New Mexico Engineering Research 1996/7/32250. Sand in an Institute, 1987. Post Burial Alteration of the Permian Rustler Formation
Butcher. 1991 "Compaction and permeability of simulated Science Proceedings of the 32nd U.S. waste," in Rock Mechanics as a
Rotterdam, Netherlands: A. A. 693-702. Symposium, edited by Lyons, 1984. Air and Gas Drilling Manual. Houston, 1996. January 2 letter from M. Gulf Publishing Company. Assistant Manager, DOE Carlsbad Area Office to Robert H. Neill, Director, Environmental Evaluation Group. Stiles and tertiary project." 1990. "Review of the means San Journal of Petroleum Technology, (May) 638-644. 1998. "Compositional simulations unit CO flood in Ford
Unit, Texas." 1998 Permian Basin Oil and Gas Recovery Paper prepared for presentation at the
Conference, Midland, Texas, 23-26 March. SPE 39794. Ridge Delaware, field summary," in Symposium of the Oil and Gas Geological Society, 264-266. New Mexico. May,B. 1995a. Fields of Southeaste 1995b. "Lost Tank Delaware, field summary," in a Symposium of the Oil and Gas Fields May, of Southeastern New Mexico. Roswell, NM: Roswell Geological Society, 280-282. 1979. Interim Data on the of the Proposed Waste Geological Isolation Pilot Plant Site Southeast New Mexico. U.S. 79-88. Survey, Mercer, 1990. "Composition paths in fourcomponent systems: effects of dissolved methane on ID C02 flood performance." Reservoir Engineering, (August) 423 432. 1993. "Permian basin operators press CO injection programs." Oil and Gas Journal, (August 16 19-23. 1997. Advanced Oil Recovery Technologies for Improved Recovery from Slope Basin Clastic Reservoirs, Draw Brushy Canyon Pool, Eddy County, New Mexico, Annual Murphy, Report September 25, 1995 September 24, 1996. U.S. Department of Energy, National Archives and Records Administration, Office of the Federal Register. 1997. "Nuclear Safety Management, Quality Assurance Requirements." 10 Code of Federal Regulations Part 830.120. Washington, U.S. Government Printing Office. National Research Council, Commission on
Environment, and Resources, Board on Radioactive Waste Management, Committee on the Waste Isolation Pilot Plant. 1996. The Waste Isolation Pilot Plant: A Potential Solution for the Disposal of Waste. Washington, National Academy Press. 1997a. February 7 letter from to Frank on the request for information from the January 21 meeting.
Neill, R.H. 1997b. March 14 letter from R. H. Neill to Marcinowski.
Neill, R.H. 1997c. August 29 letter from R. H. Neill, EEG to G. Dials, DOE on June 30 meeting,
EPA Docket Neill, R.H. 1997d. March 14 letter from R. H. Neill, EEG to EPA Docket on Docket A-93-02, 1983. Potential Problems From Shipment of High-Curie Content R.H. and Santa Fe, Environmental Waste to Contact-Handled Transuranic Evaluation Group, and P. 1983. J.K. Channell, M.S. Little, Evaluation of the Suitability of he WIPP Site. Santa Fe, NM: Environmental Evaluation
WIPP with Show Draft Compliance 1996. Review Walker. Transuranic Waste Disposal Standards. Albuquerque, NM: Environmental Evaluation Group, 1982. State of the Art of Solution Mining for Salt, Potash and Soda Ash. Solution Mining Research Institute, Research Project Report No. 1997. April 27 memorandum from solubilities in WIPP containing as the "Calculations backfill scenarios solubility-limiting phase." ERDA6 brines under National Laboratories, WPO 46124. Crafts and 1994. Actinide Source Term Paper.
Novak, C.F H.W. Revision 1 November 15. Sandia National Laboratories. Nuclear Energy Agency, International Atomic Energy Agency. 1997. International Peer Review of the 1996 Performance Assessment of the U.S. Waste Isolation Pilot Plant (WIPP). France: Organisation for Economic Cooperation and Development. and I. 1994. "On the influence of carbonate on mineral dissolution:
II. The solubility media." 613-623. 1997. The solubility of repository. Albuquerque, NM: under conditions expected in the WIPP Environmental Evaluation Group, unpublished. 1996. Technical memorandum to EPA Docket and hydraulic conductivity. of mining 1996. "Observations of the effects of water flooding on the Formation. Powers, Synopsis and presentation," in Fluid Injection for Salt Water Disposal and Enhanced Oil Recovery as a Potential Problem for the WIPP: Proceedings of a June 1995 Workshop and
Plant, December 23, 1996. Form 464 for cuttings waste permeability, WPO 37102, Nov. 28, 1995, and referenced source B.M. Butcher memo to M.S. Tierney, QAP 9-2 Documentation of the Overall Waste Permeability and Flow Property Values for the CCA, January 29, 1996. Environmental Evaluation Group Review of the WIPP-CCA, 2/7/97
TDEM survey indicate the existence of brine under the repository. Any borehole drilled into Castile under the repository should therefore be assumed to encounter brine. The EEG does not find the CCA reservoir volume assumption of 32,000 to 160,000 m3 to be justified. This is based on the assumption of depletion of reservoirs by future drillers - 100% probability of encounter for the depletion assumption, while only 8% for releases! The attached table shows the comparison between the characteristics of the WIPP-12 brine reservoir and the CCA assumptions. The WIPP site was moved twice; in 1975 after the borehole ERDA-6 encountered a brine reservoir, and again in 1982, after WIPP-12 encountered brine. The CCA assumptions of probability should be realistically based on the site specific information, and the characteristics should be based on the WIPP-12 experience. The DOE Conceptual Model Peer Review Panel, in their December 1996 report, essentially agrees with the EEG position, but has accepted the DOE position that there is no significant consequences of the probability and volume assumptions. The EEG does not accept the "no consequence" argument that is based on piecemeal, partial sensitivity analyses.
DOE/CAO-1996-2184, Table 6-26 CMPRR-Suppl., 12/1996, p. 42; To the Culebra, after 6 encounters
CMPRR-Suppl., 12/1996, p. 42; In 10,000 years Environmental Evaluation Group Review of the WIPP-CCA, 2/7/97
Stoelzel, D.M. and O'Brien, D.G., 1996. The effects of Salt Water Disposal and Waterflooding on WIPP. Summary Memo of Record for NS-7a. Sandia National
Bredehoeft, J., 1997. January 14 Memo on Hartman ScenarioCStoelzel-Obrien Analysis to L. Lovejoy, Jr., Assistant Attorney General of New Mexico.
Bredehoeft, J., 1997. January 10 Memo on Hartman Scenario to to L. Lovejoy, Jr., Assistant Attorney General of New Mexico.
Hora, S.C., von Winderfeldt, D., and Trauth, K.M., 1991. Expert Judgment on Inadvertent Human Intrusion into the Waste Isolation Pilot Plant. Albuquerque, NM: Sandia National Laboratories, SAND92-0700, Appendix A.
EEG/Fluid Injection/2/7/97/p.5 Federal Land Policy and Management Act of 1976. U.S. Code Annotated, 1989. vol. 43, secs. 1701-1784
6. Vaughn, G.L., 1995. December 13 Agency Answer to Appellant's Statement of Reasons by U.S. Department of Interior Bureau of Land Management General Counsel. Yates et al., appellants. IBLA 92-612.
7. Silva, M.K., 1996. Fluid Injection for Salt Water Disposal and Enhanced Oil Recovery as a Potential Problem for the WIPP: Proceedings of a June 1995 Workshop and Analysis. EEG-62. Environmental Evaluation Group.
8. Broadhead, R.F., Luo, F. and Speer, S.W., 1995. Volume 3 of Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site, Carlsbad, NM:
9. Jones, R.W., 1968. Hard-to-flood sand gives up secondary oil in West Texas. World
Oil, September 1968, pp 72-76. 10. Wash, R., 1982. Twofreds saved by CO2 flood. Drill Bit, July, 52-55.
11. Kirkpatrick, R.K., et al., 1985. Performance of the Twofreds CO2 Injection Project. Proceedings of the 60th Society of Petroleum Engineers Annual Technical Conference, Las Vegas, Nevada, September 22, 1985, pp. 89-101.
12. Flanders, W.A. and DePauw, R.M., 1993. Update Case History: Performance of the Twofreds Tertiary CO2 Project. SPE 26614. Proceedings. SPE Annual Technical Conference/Reservoir Engineering, Houston, Texas, October 3-6, 1993. pp. 41-50.
13. LeMay, W.J., Humphries, W.R., and Brustuen, E.A., 1988. Application of the Oil Conservation Division upon its own motion to revise Order-111, as amended, pertaining to the potash areas of Eddy and Lea Counties, New Mexico. Case No. 9316, Order No. R-111-P.
15. Heinen, R.H., 1994. January 13 letter from Western Ag-Mineral Company General Manager to J. Hansen of Bass Enterprise Production Company.
16. LeMay, W. J., 1995. December 14 Order R-10525 (Case 11403) of the Division from the Director of the New Mexico Oil Conservation District approving a pressure maintenance project for Neff Federal Well No. 23, Section 25, T22S, R31E.
17. Hartman, D., 1993. November 22 letter to Sandia National Laboratories transmitting a copy of a Complaint of Trespass, Nuisance, and Waste filed in the Federal Court for the District of New Mexico, CIV93 1349M.
18. Herrera, S., 1995. First Judicial District, County of Santa Fe, State of New Mexico, Case No. SP 93-2387 (C), Judgment in Hartman vs. Texaco, January 20, 1995.
19. Neill, R.H., Channel, J.K., Wofsy, C., and Greenfield, M.A. 1979. Radiological Health Review of the Draft Environmental Impact Statement (DOE/EIS-0026-D) Waste Isolation Pilot Plant, U.S. Department of Energy. EEG-3. Environmental Evaluation Group.
20. Griswold, G.B., 1995. Future Mining Technology. Chapter IV. Volume 2 of Evaluation of Mineral Resources at the Waste Isolation Pilot Plant (WIPP) Site. Westinghouse Electric Corporation. Waste Isolation Division. Contract No. PO-75-WJJ644145Z.
EEG/Fluid Injection/2/7/97/p.6 Enclosure: Bredehoeft Memoranda dated January 10, 1997 and January 14, 1997 March 14, 1997 Director, Center for the Waste Isolation Pilot Plant Program U.S. Environmental Protection Agency Office of Radiation and Indoor Air 401 M. Street S.W.
Washington, D.C. 20460 Dear Mr. Marcinowski: Enclosed please find the EEG’s additional comments on significant issues arising from our review of the WIPP Compliance Certification Application (CCA). This package of 14 papers complements the package of 6 papers submitted to you on February 7, 1997, following the same format. Please note that as we continue to explore deeper into the assumptions, professional judgements, calculations, conceptual and numerical models, and secondary documentations related to the
CCA, we are bound to come up with additional issues to be sesolved. We do not view the March 17, 1997 deadline as a bounding date for communicating additional concerns to the EPA. Given the significance of the decision that the EPA has to make, and the time that the DOE has taken to prepare this application since EPA originally promulgated 40 CFR 191 in 1985, 4 months of review time is not enough. Actually, the review time was much shorter since many of the issues that we have identified required a review of the Sensitivity Analysis Report that was provided to the EEG on January 20, 1997, and additional materials that have only recently been added to the Records Packages at the Sandia National Laboratories. A detailed review of the July 1995 DOE draft CCA (DCCA) was provided by the EEG to the
DOE in February 1996 and later published as the EEG report, “Review of the WIPP Draft Application to Show Compliance with EPA Transuranic Waste Disposal Standards”, EEG-61, March 1996. The EEG has not received comments on that review from the DOE to date, and we have found no changes between the draft and the final CCA as a result of the EEG review (EEG 61). In our additional comments on the CCA to be provided in a report that we plan to publish this year, we will analyze our comments on the DCCA and how they have been treated in the
CCA. At this time, we are formally submitting a copy of EEG-61 to you and to the Docket as part of our comments on the CCA. Mr. Frank Marcinowski Page 2 March 14, 1997 The issues identified in EEG-61, our letter and encloserues date 2/7/97, and this letter and the enclosures, should therefore be considered to be our formal comments on the CCA submitted to you before 3/1797 deadline. As you can see, we have concentrated our efforts so far on reviewing the Containment Requirement related issues of the CCA. We will provide comments on the other parts of the 40 CFR 191 subpart B compliance as we review the compliance with them. The overall EEG recommendation to the EPA at this point is to require the DOE to include consideration of additional scenarios like water-flooding and solution mining, with corrected conceptual models and parameter values in showing compliance with the Containment Requirements of the EPA Standards, 40 CFR 191. EPA should also require robust engineered barriers as part of the Assurance Requirement of 40 CFR 191. Sincerely,
TDEM survey indicate the existence of brine under the repository. Any borehole drilled into Castile under the repository should therefore be assumed to encounter brine. The EEG does not find the CCA reservoir volume assumption of 32,000 to 160,000 m3 to be justified. This is based on the assumption of depletion of reservoirs by future drillers - 100% probability of encounter for the depletion assumption, while only 8% for releases! The attached table shows the comparison between the characteristics of the WIPP-12 brine reservoir and the CCA assumptions. The WIPP site was moved twice; in 1975 after the borehole ERDA-6 encountered a brine reservoir, and again in 1982, after WIPP-12 encountered brine. The CCA assumptions of probability should be realistically based on the site specific information, and the characteristics should be based on the WIPP-12 experience.