Policy Replication

Economic Analysis of the Final Phase II Storm Water Rule

Regulatory impact analysis1999-01-01 · EPA · economic_analysis · web:cd13c9153eb28cabe714
RIN 2040-AC82

Other documents for the same rulemaking (all, by stage)

Docket documentAgency Information Collection Activities: Submission for OMB Review; Comment Request; NPDES Storm Water Program Phase II
1998-01-09 Federal RegisterNational Pollutant Discharge Elimination SystemProposed Regulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges
1999-12-08 Federal RegisterNational Pollutant Discharge Elimination SystemRegulations for Revision of the Water Pollution Control Program Addressing Storm Water Discharges
2002-12-30 Federal RegisterModification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land
2003-03-10 Federal RegisterModification of National Pollutant Discharge Elimination System (NPDES) Permit Deadline for Storm Water Discharges for Oil and Gas Construction Activity That Disturbs One to Five Acres of Land

References: 307 extracted, 54 linked to papers

Page 7Download these results: CSV · JSON
SWRPC, 1991
otherNot linked to a paper · Per-Site Costs
US EPA, 1993a
otherNot linked to a paper · Per-Site Costs
Livingston, et al, 1997
otherNot linked to a paper · Per-Site Costs
Claytor and Schueler's method (1996)
otherNot linked to a paper · Associated Cost Savings
Bureau of the Census building permit data files, 1980-1994 (United States Bureau of the Census)
datasetNot linked to a paper · Appendix B-2, Step One
EPA Coastal Nonpoint Finding Status. April 22, 1998
government reportNot linked to a paper · Appendix B-2, Step Nine
EPA (1976) reports a mean TC concentration of 3.10^5/100 ml for the discharge from storm sewers and unsewered areas.
otherNot linked to a paper · Appendix C, Potential Range of Contamination Concentrations (C-4)
← Previous