The U.S. Environmental Protection Agency ("EPA" or "Agency") conducted an inspection from September 9-10, 2002, of the Central Characterization Program (CCP) Quality Assurance (QA) program at Argonne National Laboratory-East (ANL-E) in accordance with § 194.8(a)(2). The investigation of the activities selected for the EPA inspection sample showed that the CCP QA Program at ANL-E is properly executed. The EPA inspector verified that: 1) The CCP QA Plan establishes the applicable Nuclear Quality Assurance (NQA) standards, 2) The CCP QA Officer continues to have sufficient authority, qualifications, organizational freedom, resources, and access to work areas to properly assure the quality of the characterization of transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). Concurrently during the EPA inspection, the QA Organization of the U.S. Department of Energy (DOE)'s Carlsbad Field Office (CBFO) conducted an audit also to assess the CCP's proper execution of a QA Program to oversee waste characterization activities at ANL-E. DOE's audit sample showed that the CCP QA Program has been properly extended to oversee waste characterization activities at ANL-E. The EPA inspector verified that CBFO conducted the audit in accordance with the NQA standards.
NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each site where it is implemented. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1-4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the
EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. Table 1 below presents a summary of EPA inspections to-date of the CCP QA Program. Table 1: Summary of EPA Inspections of the CCP QA Program Activity Date Purpose Inspection October 15-18, 2001 Inspection and independent assessment of initial CBFO Certification Audit of CCP QA program for conformance with 40 CFR 194.22(a); Performed at Savannah River. Inspection September 9-10, 2002 Inspection of DOE Audit A-02-03 for CCP QA Program application at ANL-E.
ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18,1998, certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activites and assumptions. The purpose of the EPA inspection was to confirm the compliance of the CCP
NEVADA TEST SITE FOR THE WASTE ISOLATION PILOT PLANT September 24, 2002 U. S. ENVIRONMENTAL PROTECTION AGENCY Office of Radiation and Indoor Air Center for Federal Regulations 1200 Pennsylvania Ave., N.W.
EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection on September 24, 2002, of the Central Characterization Program (CCP) Quality Assurance (QA) Program at the Nevada Test Site (NTS) to confirm compliance in accordance with § 194.8(a)(2). The investigation of the activities selected for the EPA inspection sample showed that the CCP
QA Program at NTS is properly executed. The EPA inspector verified that: changes to the CCP QA Plan do not diminish the establishment of applicable Nuclear Quality Assurance (NQA) standards, and The CCP QA Officer continues to have sufficient authority, qualifications, organizational freedom, resources, and access to work areas to properly assure the quality of the characterization of transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). Concurrently during the EPA inspection, the QA Organization of DOE's Carlsbad Field Office (CBFO) conducted an audit to also assess the CCP's proper execution of a QA Program to oversee waste characterization activities at NTS. DOE's audit sample showed that the CCP QA Program has been properly maintained. President Truman established the NTS in December 1950, as the nation's on-continent nuclear weapons testing area. Prior to 1950, most tests were conducted in the Pacific. This was costly, time-consuming, and logistically difficult. The first bomb, a one kiloton warhead dropped from an airplane, was detonated on January 27, 1951. Between 1951 and 1962, 126 atmospheric tests of atomic weapons were conducted within the Test Site's boundaries. P.27
NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each sitespecific implementation. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1 -4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the
EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, P.28 the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. Table 1 below presents a summary of EPA inspections to-date of the CCP QA Program. Table 1: Summary of EPA Inspections of the CCP QA Program Activity Date Purpose Inspection October 15-18,2001 Inspection and independent assessment of initial CBFO Certification Audit of CCP QA program for conformance with 40 CFR 194.22(a); Performed at Savannah River. Inspection September 9-10, 2002 Inspection of DOE Audit A-02-03 for.CCP QA Program application at ANL-E. Inspection September 24, 2002 Inspection of DOE Audit A-02-15 for CCP QA Program application at NTS.
ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18,1998, certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activities and assumptions. The purpose of the inspection was to confirm the compliance of the CCP NTS QA program with the above requirements, in accordance with § 194.8(a)(2). P.30