{"document":{"doc_id":217503,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Ltr/EPA/F. Marcinowski to DOE/I. Triay, transmitting reports for inspection no's. EPA-ANL-E-CCP-9.02-22 & EPA-NTS-CCP-9.02-22 [A-98-49-II-A1-40]","date":"2021-11-18","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2004-0052-0067","source_native_id":"EPA-HQ-OAR-2004-0052-0067","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2004-0052"],"rins":["RIN 2060-AJ90","RIN 2060-AG85"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":20276,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions From Spark-Ignition Marine Vessels and Highway Motorcycles","date":"2002-08-14"},{"doc_id":20222,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions from Spark-Ignition Marine Vessels and Highway Motorcycles; Correction","date":"2002-09-09"},{"doc_id":20110,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Control of Emissions From Spark Ignition Marine Vessels and Highway Motorcycles; Extension of Comment Period","date":"2002-10-30"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":19197,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Control of Emissions From Highway Motorcycles","date":"2004-01-15"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"},{"doc_id":269972,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)","date":"2006-07-25"},{"doc_id":269973,"source":"docket_item","org":"EPA","doc_type":"report","title":"Analysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)","date":"2006-07-25"},{"doc_id":269974,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report","date":"2006-07-25"},{"doc_id":269975,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Peer Review Plan","date":"2006-07-25"}],"references":[{"citation_id":2633072,"raw_reference":"The U.S. Environmental Protection Agency (\"EPA\" or \"Agency\") conducted an inspection from September 9-10, 2002, of the Central Characterization Program (CCP) Quality Assurance (QA) program at Argonne National Laboratory-East (ANL-E) in accordance with § 194.8(a)(2). The investigation of the activities selected for the EPA inspection sample showed that the CCP QA Program at ANL-E is properly executed. The EPA inspector verified that: 1) The CCP QA Plan establishes the applicable Nuclear Quality Assurance (NQA) standards, 2) The CCP QA Officer continues to have sufficient authority, qualifications, organizational freedom, resources, and access to work areas to properly assure the quality of the characterization of transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). Concurrently during the EPA inspection, the QA Organization of the U.S. Department of Energy (DOE)'s Carlsbad Field Office (CBFO) conducted an audit also to assess the CCP's proper execution of a QA Program to oversee waste characterization activities at ANL-E. DOE's audit sample showed that the CCP QA Program has been properly extended to oversee waste characterization activities at ANL-E. The EPA inspector verified that CBFO conducted the audit in accordance with the NQA standards.","cited_authors":"The U.S. Environmental Protection Agency (\"EPA\" or \"Agency\") conducted an inspection from September 9-10","cited_year":"2002","cited_title":"of the Central Characterization Program (CCP) Quality Assurance (QA) program at Argonne National Laboratory-East (ANL-E) in accordance with § 194.8(a)(2)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633073,"raw_reference":"NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each site where it is implemented. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1-4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the","cited_authors":"NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each site where it is implemented. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1-4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633074,"raw_reference":"EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. Table 1 below presents a summary of EPA inspections to-date of the CCP QA Program. Table 1: Summary of EPA Inspections of the CCP QA Program Activity Date Purpose Inspection October 15-18, 2001 Inspection and independent assessment of initial CBFO Certification Audit of CCP QA program for conformance with 40 CFR 194.22(a); Performed at Savannah River. Inspection September 9-10, 2002 Inspection of DOE Audit A-02-03 for CCP QA Program application at ANL-E.","cited_authors":null,"cited_year":null,"cited_title":"EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, the Agency also performs some oversight of DOE's quality assurance checks of a QA Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633075,"raw_reference":"ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18,1998, certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activites and assumptions. The purpose of the EPA inspection was to confirm the compliance of the CCP","cited_authors":"ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18","cited_year":"1998","cited_title":"certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activites and assumptions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633076,"raw_reference":"NEVADA TEST SITE FOR THE WASTE ISOLATION PILOT PLANT September 24, 2002 U. S. ENVIRONMENTAL PROTECTION AGENCY Office of Radiation and Indoor Air Center for Federal Regulations 1200 Pennsylvania Ave., N.W.","cited_authors":null,"cited_year":null,"cited_title":"NEVADA TEST SITE FOR THE WASTE ISOLATION PILOT PLANT September 24, 2002 U. S. ENVIRONMENTAL PROTECTION AGENCY Office of Radiation and Indoor Air Center for Federal Regulations 1200 Pennsylvania Ave., N.W","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633077,"raw_reference":"EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection on September 24, 2002, of the Central Characterization Program (CCP) Quality Assurance (QA) Program at the Nevada Test Site (NTS) to confirm compliance in accordance with § 194.8(a)(2). The investigation of the activities selected for the EPA inspection sample showed that the CCP","cited_authors":"EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection on September 24","cited_year":"2002","cited_title":"of the Central Characterization Program (CCP) Quality Assurance (QA) Program at the Nevada Test Site (NTS) to confirm compliance in accordance with § 194.8(a)(2)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633078,"raw_reference":"QA Program at NTS is properly executed. The EPA inspector verified that: changes to the CCP QA Plan do not diminish the establishment of applicable Nuclear Quality Assurance (NQA) standards, and The CCP QA Officer continues to have sufficient authority, qualifications, organizational freedom, resources, and access to work areas to properly assure the quality of the characterization of transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). Concurrently during the EPA inspection, the QA Organization of DOE's Carlsbad Field Office (CBFO) conducted an audit to also assess the CCP's proper execution of a QA Program to oversee waste characterization activities at NTS. DOE's audit sample showed that the CCP QA Program has been properly maintained. President Truman established the NTS in December 1950, as the nation's on-continent nuclear weapons testing area. Prior to 1950, most tests were conducted in the Pacific. This was costly, time-consuming, and logistically difficult. The first bomb, a one kiloton warhead dropped from an airplane, was detonated on January 27, 1951. Between 1951 and 1962, 126 atmospheric tests of atomic weapons were conducted within the Test Site's boundaries. P.27","cited_authors":"QA Program at NTS is properly executed. The EPA inspector verified that: changes to the CCP QA Plan do not diminish the establishment of applicable Nuclear Quality Assurance (NQA) standards, and The CCP QA Officer continues to have sufficient authority, qualifications, organizational freedom, resources, and access to work areas to properly assure the quality of the characterization of transuranic (TRU) waste destined for disposal at the Waste Isolation Pilot Plant (WIPP). Concurrently during the EPA inspection, the QA Organization of DOE's Carlsbad Field Office (CBFO) conducted an audit to also assess the CCP's proper execution of a QA Program to oversee waste characterization activities at NTS. DOE's audit sample showed that the CCP QA Program has been properly maintained. President Truman established the NTS in December","cited_year":"1950","cited_title":"as the nation's on-continent nuclear weapons testing area","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633079,"raw_reference":"NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each sitespecific implementation. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1 -4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18, 1998) that the","cited_authors":"NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The Agency verified that DOE established these NQA standards in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the WIPP. The QAPD is the documented QA Plan for the WIPP project, as a whole, to establish the NQA standards. The QAPD is maintained by the QA Organization of DOE's Carlsbad Field Office (CBFO), which has the authority to audit all other organizations associated with TRU waste disposal at the WIPP to ensure that their lower-tier QA Programs establish and implement the applicable requirements of the QAPD. The DOE generator sites, which will characterize waste for disposal in the WIPP, must prepare site-specific QA Plans that establish the applicable NQA requirements. Therefore, the EPA will evaluate the CCP QA Plan at each sitespecific implementation. The EPA annually audits DOE's QA Program at CBFO (reference EPA Air Docket No. A-93-02, Document Nos. II-A-43 and IV-A-4, and EPA Air Docket No. A-98-49, Document No. II-A-1 -4) and has found that DOE properly adheres to a QA Program that implements the NQA standards. The Agency determined in its WIPP Certification Decision (63 FR 27354, May 18","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633080,"raw_reference":"EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, P.28 the Agency also performs some oversight of DOE's quality assurance checks of a QA Program. Table 1 below presents a summary of EPA inspections to-date of the CCP QA Program. Table 1: Summary of EPA Inspections of the CCP QA Program Activity Date Purpose Inspection October 15-18,2001 Inspection and independent assessment of initial CBFO Certification Audit of CCP QA program for conformance with 40 CFR 194.22(a); Performed at Savannah River. Inspection September 9-10, 2002 Inspection of DOE Audit A-02-03 for.CCP QA Program application at ANL-E. Inspection September 24, 2002 Inspection of DOE Audit A-02-15 for CCP QA Program application at NTS.","cited_authors":null,"cited_year":null,"cited_title":"EPA assumes all responsibilities associated with assessing a QA Program, while in an inspection, P.28 the Agency also performs some oversight of DOE's quality assurance checks of a QA Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2633081,"raw_reference":"ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18,1998, certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activities and assumptions. The purpose of the inspection was to confirm the compliance of the CCP NTS QA program with the above requirements, in accordance with § 194.8(a)(2). P.30","cited_authors":"ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990 Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). Condition 2 of EPA's May 18","cited_year":"1998","cited_title":"certification of the WIPP prohibits shipment of TRU waste for disposal at WIPP until EPA determines that the waste generator site has established and executed a quality assurance program for, inter alia, waste characterization activities and assumptions","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}