EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from August 7-8,2000 of a DOE audit ofthe Westinghouse Waste Isolation Division (WID or Site) quality assurance (QA) program. The investigation ofthe activities selected for the DOE audit sample showed that WID has properly maintained its QA program since the previous inspection conducted on June 30,1999.
WID offices are located near Carlsbad, New Mexico at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), the nation's underground repository for defense-generated transuranic radioactive waste. WID, a division of Westinghouse Government Services Group, is the DOE's performance-based management and operating (M&O) contractor at the WIPP. As such, WID's responsibilities include the day-to-day management, operations, and maintenance of the WIPP. The WID QA program provides on-site surveillance of items and activities that are important to the containment of TRU wastes within the WIPP. In August 1997, the EPA initially determined that the WID QA program was properly executed. On February 17-19,1998, on February 9-11, 1999, and on June 30,1999, the EPA determined that the WID QA program had been properly maintained since the initial approval. The purpose of this inspection on August 7-8,2000 was to determine whether the WID QA program continues to be properly maintained since last year's inspection. This report documents the results ofthe EPA inspection to verify whether or not
WID has properly maintained its quality assurance program. During the inspection, the EPA inspector: 1) verified that recent changes to WID's QA plan do not diminish the establishment ofthe applicable NQA requirements; 2) verified that DOE audit A-00-14 of WID was performed properly; 3) participated in the DOE audit to verify the continued implementation of established NQA requirements; and 4) verified implementation of corrective actions taken by WID in response to previous EPA audits. Based on the results of these inspection activities, EPA concurs with the results of CAO audit A00-14, that the WID's QA program continues to properly establish and implement the requirements of 40 CFR 194.22(a)(1) for the items and activities that are important to containment of transuranic waste within the WIPP. 40 CFR 194.22(a)(1) includes, by reference, the requirements of ASME NQA-1-1989 edition, ASME NQA-2a-1990 addenda, part 2.7 to
ASME NQA-2-1989 edition, and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1). Inspection of CAO Audit A-00-14, August 7-8,2000
EPA conducted its initial audit ofthe WID quality assurance program on February 10-14,1997, with a follow-up visit to WID on June 24-25,1997. In the audit report dated August 1997, EPA determined that WID had properly executed a quality assurance program that implements the requirements of 40 CFR 194.22(a)(1). On February 17-19,1998, February 9-11,1999, and June 30,1999, the Agency conducted inspections subsequent to the approval to confirm continued compliance. The Agency verified that DOE established the NQA requirements in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the
DOE. The difference between an audit and an inspection lies in the role that EPA performs. During an audit, EPA assumes all responsibilities associated with assessing a site's quality assurance program, while in an inspection, the Agency performs oversight of DOE's quality assurance checks ofthe site's quality assurance program. Inspection of CAO Audit A-00-14, August 7-8,2000
WIPP has been produced since 1970 and is currently being stored above ground or just below the surface at various DOE sites across the country The EPA requires the establishment and implementation of QA programs for all activities important to the containment of TRU waste at the WIPP. As the WIPP M&O contractor, WID must properly execute a QA program that controls all activities important to the containment of
TRU waste in the WIPP. The DOE Carlsbad Area Office (CAO) is responsible for the management ofthe WIPP and for assuring that the WIPP and other WIPP-related sites have quality assurance programs that provide adequate oversight of TRU waste activities. Inspection of CAO Audit A-00-14, August 7-8,2000
PURPOSE AND SCOPE At § 194.22(a)(1), EPA requires WID to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990
Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The purpose of this EPA inspection is to verify adherence of WID's QA program to the requirements of § 194.22(a)(1). §§§ 194.22(a)(2) requires WID to execute its QA program for all its items and activities that are important to the containment of TRU waste in the WIPP. The scope of this EPA inspection is limited to the QA program for items and activities that are important to the containment of TRU waste at the WIPP. Inspection of CAO Audit A-00-14, August 7-8,2000
CAO. Memorandum, "Subject: Audit (A-00-14) of Waste Isolation Division (WID) ", From: Samuel A. Vega, To: Joe Epstein, Dated: July 6, 2000. "Attachment: A - Carlsbad Area Office Audit Plan."
CAO. Memorandum, "Subject: Audit (A-00-14) of Waste Isolation Division (WID) Limited Scope ", From: Samuel A. Vega, To: Joe Epstein, Dated: July 26, 2000. Attachment: A - Carlsbad Area Office Audit Plan."
CAO. Letter, Marc A. Italiano, CAO, to Mike Eagle, EPA ORIA. February 19, 1999 [subject: Corrective actions for February 1999 EPA findings.]
CAO Audit Checklists for A-00-14. CAO. "Summary for DOE Audit A-00-14 ofthe Westinghouse Waste Isolation Division, " [presented to the EPA inspector by CAO during the audit close-out meeting on August 8, 2000. (See attachment 3 of this inspection report.)]
WID. "Software Screening and Action Plan", WP 16-2, Revision 0 (effective 1/11/2000)
WID. Corrective action file for "1999 EPA Audit Finding 1 [EPA Finding 2]"
WID. Corrective action file for "1999 EPA Audit Finding 2 [EPA Finding 3]" Inspection of CAO Audit A-00-14, August 7-8,2000 08/02/00. P.16
QA Manager), March 31,1999. WID. "Quality Assurance Department Assessment Program" WP 13-QA.03, Revision 4, (effective 8/27/99)
DOE Carlsbad Area Office. Quality Assurance Program Document, CAO-94-1012, Rev. 3, November 1999.
Reporting, November 24,1999. DOE Carlsbad Area Office. Management Procedure 10.3, Rev. 3, Audits, November 24, 1999.
DOE Carlsbad Area Office. Team Procedure 10.1, Rev. 1, Qualification of Audit Personnel and Certification of Lead Auditors, effective date November 24, 1999.
DOE Carlsbad Area Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6,1999. Inspection of CAO Audit A-00-14, August 7-8,2000 P.17
ATTACHMENT 1 PERSONNEL INTERVIEWED BY EPA INSPECTOR Inspection of CAO Audit A-00-14, August 7-8,2000 P.18
SAIC/CTAC, Software Technical Specialist Inspection of CAO Audit A-00-14, August 7-8,2000 P.19
ATTACHMENT 2 INSPECTOR'S CHECKLIST FOR NQA-1 ELEMENT 18 Inspection of CAO Audit A-00-14, August 7-8,2000 P.20
EPA INSPECTOR'S NQA-1 CHECKLIST EPA Inspection of CAO Audit A-00-14 of WED, August 7-8,2000