{"document":{"doc_id":217472,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Ltr/EPA/F. Marcinowski to DOE/I.Triay transmitting report for inspection no. EPA-WID-8.00-22[A-98-49-II-A1-21]","date":"2021-11-18","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2004-0052-0048","source_native_id":"EPA-HQ-OAR-2004-0052-0048","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2004-0052"],"rins":["RIN 2060-AJ90","RIN 2060-AG85"],"related":[{"doc_id":274910,"source":"docket_item","org":"EPA","doc_type":"data","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project for Disposal at the Waste Isolation Pilot Plant; Notice of Availability; Opening\nof Public Comment Period","date":null},{"doc_id":25406,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Decision to Certify Whether the Waste Isolation Pilot Plant Complies With the 40 CFR Part 191 Disposal Regulations and the 40 CFR Part 194 Compliance Criteria","date":"1996-11-15"},{"doc_id":24771,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations: Certification Decision","date":"1997-10-30"},{"doc_id":23529,"source":"fr_rule","org":"Criteria for the Certification and Recertification of the Waste; ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-18"},{"doc_id":23948,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Opportunity To Comment on Documents Used by the Department of Energy To Certify the Rocky Flats Environmental Technology Site To Ship Transuranic Waste to WIPP, as Required in: Criteria for the Certification and Re-certification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision","date":"1998-05-21"},{"doc_id":23999,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Quality Assurance and Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Environmental and Engineering Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1998-06-24"},{"doc_id":23012,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-03-25"},{"doc_id":23047,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23049,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Change in Dates of EPA Inspection of Transuranic Waste Characterization Systems and Processes at the Rocky Flats Environmental Technology Site Related to the Waste Isolation Pilot Plant","date":"1999-04-16"},{"doc_id":23098,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Inspection Date at Idaho National Engineering and Environmental Laboratory and Availability of Waste Characterization and Quality Assurance Program Documents Applicable to Transuranic Radioactive Waste at the Nevada Test Site Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-13"},{"doc_id":23102,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste at the Los Alamos National Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"1999-05-17"},{"doc_id":23277,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-10-18"},{"doc_id":23369,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"1999-12-08"},{"doc_id":21687,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-04-14"},{"doc_id":21447,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2000-08-28"},{"doc_id":21309,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2000-11-28"},{"doc_id":21029,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-04-05"},{"doc_id":20903,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory Proposed for Disposal at the Waste Isolation Pilot Plant","date":"2001-07-13"},{"doc_id":20689,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Hanford Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20690,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Savannah River Site for Disposal at the Waste Isolation Pilot Plant","date":"2001-11-27"},{"doc_id":20592,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From Los Alamos National Laboratories for Disposal at the Waste Isolation Pilot Plant","date":"2002-02-13"},{"doc_id":20539,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Idaho National Engineering and Environmental Laboratory for Disposal at the Waste Isolation Pilot Plant","date":"2002-03-20"},{"doc_id":20435,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Waste Characterization Program Documents Applicable to Transuranic Radioactive Waste From the Rocky Flats Environmental Technology Site for Disposal at the Waste Isolation Pilot Plant","date":"2002-05-20"},{"doc_id":20276,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions From Spark-Ignition Marine Vessels and Highway Motorcycles","date":"2002-08-14"},{"doc_id":20222,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"Control of Emissions from Spark-Ignition Marine Vessels and Highway Motorcycles; Correction","date":"2002-09-09"},{"doc_id":20110,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule (administrative)","title":"Control of Emissions From Spark Ignition Marine Vessels and Highway Motorcycles; Extension of Comment Period","date":"2002-10-30"},{"doc_id":274192,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Certification Plan for INEEL Contact-Handled Transuranic Waste","date":"2003-07-28"},{"doc_id":274193,"source":"docket_item","org":"EPA","doc_type":"report","title":"Idaho National Engineering and Environmental Laboratory advanced Mixed Waste Treatment Project Quality Assurance Project Plan (QAPjP)","date":"2003-07-28"},{"doc_id":19197,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Rule","title":"Control of Emissions From Highway Motorcycles","date":"2004-01-15"},{"doc_id":271722,"source":"docket_item","org":"EPA","doc_type":"report","title":"Draft -- EPA Baseline Inspection (EPA-INL-CCP-5.05-8) of the Advanced Mixed Waste Treatment Program (AMWTP) and the Idaho Closure Project (ICP) Waste Characterized by the Central Characterization Project (CCP) at Idaho National Laboratory (INL) [A-98-49-II-A4-56]","date":"2005-08-29"},{"doc_id":271514,"source":"docket_item","org":"EPA","doc_type":"report","title":"Final Baseline Inspection Report -- Idaho National Laboratory (INL)-Central Characterization Project (CCP) [A-98-49-II-A4-59]","date":"2005-11-03"},{"doc_id":269984,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.32 and 33: Compliance Recertification Application Re-evaluation of Select Human Intrusion Activities","date":"2006-07-24"},{"doc_id":269986,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.25, 194.32, and 194.33: Compliance Recertification Application Review of Features, Events, and Processes","date":"2006-07-24"},{"doc_id":269987,"source":"docket_item","org":"EPA","doc_type":"data","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration","date":"2006-07-24"},{"doc_id":269988,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Evaluation of the Compliance Recertification Actinide Source Term and Culebra Dolomite Distribution Coefficient Values","date":"2006-07-24"},{"doc_id":269989,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of Changes to the WIPP Performance Assessment Parameters Since the Database Migration: CRA Parameter Review","date":"2006-07-24"},{"doc_id":269990,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23 - Review of Changes to the WIPP Performance Assessment Parameters from the Compliance Recertification Application to Performance Assessment Baseline Calculation: PABC Parameter Review","date":"2006-07-24"},{"doc_id":269991,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for 194.27: Salado Flow Conceptual Models Peer Review","date":"2006-07-24"},{"doc_id":269992,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: SANTOS Computer Code in WIPP Performance Assessment","date":"2006-07-24"},{"doc_id":269994,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.27: Spallings Conceptual Model Peer Review","date":"2006-07-24"},{"doc_id":269995,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Sections 194.22 and 23: Review of WIPP Recertification Performance Assessment Computer Codes - CRA Code Review","date":"2006-07-24"},{"doc_id":269997,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Models and Computer Codes - PABC Codes Changes Review","date":"2006-07-24"},{"doc_id":269998,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.14:  Evaluation of Karst at the WIPP Site","date":"2006-07-24"},{"doc_id":269999,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.24: Review of the Baseline Inventory Used in the Compliance Recertification Application and the Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":270000,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Support Document for Section 194.23: Review of the 2004 Compliance Recertification Performance Assessment Baseline Calculation","date":"2006-07-24"},{"doc_id":269960,"source":"docket_item","org":"EPA","doc_type":"report","title":"Comparison of Effects of Brine Pocket Size","date":"2006-07-25"},{"doc_id":269961,"source":"docket_item","org":"EPA","doc_type":"report","title":"Plutonium Chemistry Under Conditions Revelant For WIPP Performance Assessment: Review of Experimental Results and Recommendations for Future Work [DOE/AL58309-77] (EEG-77)","date":"2006-07-25"},{"doc_id":269962,"source":"docket_item","org":"EPA","doc_type":"report","title":"Sensitivity Analysis Of Performance Parameters Used In Modeling The WIPP [DOE/AL58309-69] (EEG-69)","date":"2006-07-25"},{"doc_id":269963,"source":"docket_item","org":"EPA","doc_type":"report","title":"Salado Flow Peer Review Plan","date":"2006-07-25"},{"doc_id":269964,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Conceptual Model Peer Review Report","date":"2006-07-25"},{"doc_id":269965,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-22: Conceptual Models Third Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269966,"source":"docket_item","org":"EPA","doc_type":"report","title":"II-G-12: Conceptual Models Supplementary Peer Review Report","date":"2006-07-25"},{"doc_id":269967,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269968,"source":"docket_item","org":"EPA","doc_type":"report","title":"Spallings Conceptual Model Peer Review Report: Section 3.2.4, The Post-Penetration Wellbore Flow","date":"2006-07-25"},{"doc_id":269969,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Conceptual Models Peer Review Report","date":"2006-07-25"},{"doc_id":269971,"source":"docket_item","org":"EPA","doc_type":"report","title":"Quality Assurance Program Document, Revision 5 [DOE/CBFO-94-1012]","date":"2006-07-25"},{"doc_id":269972,"source":"docket_item","org":"EPA","doc_type":"report","title":"Evaluation Of Risks And Waste Characterization Requirements For The Transuranic Waste Emplaced In WIPP During 1999 [DOE/AL58309-75] (EEG-75)","date":"2006-07-25"},{"doc_id":269973,"source":"docket_item","org":"EPA","doc_type":"report","title":"Analysis of Emplaced Waste Data and Implications of Non-Random Emplacement for Performance Assessment for the WIPP [DOE/AL58309-85]-(EEG-85)","date":"2006-07-25"},{"doc_id":269974,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Salado Flow Conceptual Models, Final Peer Review Report","date":"2006-07-25"},{"doc_id":269975,"source":"docket_item","org":"EPA","doc_type":"report","title":"Waste Isolation Pilot Plant: Spallings Peer Review Plan","date":"2006-07-25"}],"references":[{"citation_id":2632826,"raw_reference":"EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from August 7-8,2000 of a DOE audit ofthe Westinghouse Waste Isolation Division (WID or Site) quality assurance (QA) program. The investigation ofthe activities selected for the DOE audit sample showed that WID has properly maintained its QA program since the previous inspection conducted on June 30,1999.","cited_authors":"EXECUTIVE SUMMARY The U.S. Environmental Protection Agency (EPA or Agency) conducted an inspection from August 7-8,2000 of a DOE audit ofthe Westinghouse Waste Isolation Division (WID or Site) quality assurance (QA) program. The investigation ofthe activities selected for the DOE audit sample showed that WID has properly maintained its QA program since the previous inspection conducted on June 30","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632827,"raw_reference":"WID offices are located near Carlsbad, New Mexico at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), the nation's underground repository for defense-generated transuranic radioactive waste. WID, a division of Westinghouse Government Services Group, is the DOE's performance-based management and operating (M&O) contractor at the WIPP. As such, WID's responsibilities include the day-to-day management, operations, and maintenance of the WIPP. The WID QA program provides on-site surveillance of items and activities that are important to the containment of TRU wastes within the WIPP. In August 1997, the EPA initially determined that the WID QA program was properly executed. On February 17-19,1998, on February 9-11, 1999, and on June 30,1999, the EPA determined that the WID QA program had been properly maintained since the initial approval. The purpose of this inspection on August 7-8,2000 was to determine whether the WID QA program continues to be properly maintained since last year's inspection. This report documents the results ofthe EPA inspection to verify whether or not","cited_authors":"WID offices are located near Carlsbad, New Mexico at the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), the nation's underground repository for defense-generated transuranic radioactive waste. WID, a division of Westinghouse Government Services Group, is the DOE's performance-based management and operating (M&O) contractor at the WIPP. As such, WID's responsibilities include the day-to-day management, operations, and maintenance of the WIPP. The WID QA program provides on-site surveillance of items and activities that are important to the containment of TRU wastes within the WIPP. In August","cited_year":"1997","cited_title":"the EPA initially determined that the WID QA program was properly executed","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632828,"raw_reference":"WID has properly maintained its quality assurance program. During the inspection, the EPA inspector: 1) verified that recent changes to WID's QA plan do not diminish the establishment ofthe applicable NQA requirements; 2) verified that DOE audit A-00-14 of WID was performed properly; 3) participated in the DOE audit to verify the continued implementation of established NQA requirements; and 4) verified implementation of corrective actions taken by WID in response to previous EPA audits. Based on the results of these inspection activities, EPA concurs with the results of CAO audit A00-14, that the WID's QA program continues to properly establish and implement the requirements of 40 CFR 194.22(a)(1) for the items and activities that are important to containment of transuranic waste within the WIPP. 40 CFR 194.22(a)(1) includes, by reference, the requirements of ASME NQA-1-1989 edition, ASME NQA-2a-1990 addenda, part 2.7 to","cited_authors":null,"cited_year":null,"cited_title":"WID has properly maintained its quality assurance program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632829,"raw_reference":"ASME NQA-2-1989 edition, and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1). Inspection of CAO Audit A-00-14, August 7-8,2000","cited_authors":null,"cited_year":null,"cited_title":"ASME NQA-2-1989 edition, and ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c), and Section 17.1)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632830,"raw_reference":"EPA conducted its initial audit ofthe WID quality assurance program on February 10-14,1997, with a follow-up visit to WID on June 24-25,1997. In the audit report dated August 1997, EPA determined that WID had properly executed a quality assurance program that implements the requirements of 40 CFR 194.22(a)(1). On February 17-19,1998, February 9-11,1999, and June 30,1999, the Agency conducted inspections subsequent to the approval to confirm continued compliance. The Agency verified that DOE established the NQA requirements in the Quality Assurance Program Document (QAPD) included in the Compliance Certification Application (CCA) for the","cited_authors":"EPA conducted its initial audit ofthe WID quality assurance program on February 10-14","cited_year":"1997","cited_title":"with a follow-up visit to WID on June 24-25,1997","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632831,"raw_reference":"DOE. The difference between an audit and an inspection lies in the role that EPA performs. During an audit, EPA assumes all responsibilities associated with assessing a site's quality assurance program, while in an inspection, the Agency performs oversight of DOE's quality assurance checks ofthe site's quality assurance program. Inspection of CAO Audit A-00-14, August 7-8,2000","cited_authors":null,"cited_year":null,"cited_title":"DOE. The difference between an audit and an inspection lies in the role that EPA performs","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632832,"raw_reference":"WIPP has been produced since 1970 and is currently being stored above ground or just below the surface at various DOE sites across the country The EPA requires the establishment and implementation of QA programs for all activities important to the containment of TRU waste at the WIPP. As the WIPP M&O contractor, WID must properly execute a QA program that controls all activities important to the containment of","cited_authors":null,"cited_year":null,"cited_title":"WIPP has been produced since 1970 and is currently being stored above ground or just below the surface at various DOE sites across the country The EPA requires the establishment and implementation of QA programs for all activities important to the containment of TRU waste at the WIPP. As the WIPP M&O contractor, WID must properly execute a QA program that controls all activities important to the containment of","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632833,"raw_reference":"TRU waste in the WIPP. The DOE Carlsbad Area Office (CAO) is responsible for the management ofthe WIPP and for assuring that the WIPP and other WIPP-related sites have quality assurance programs that provide adequate oversight of TRU waste activities. Inspection of CAO Audit A-00-14, August 7-8,2000","cited_authors":null,"cited_year":null,"cited_title":"TRU waste in the WIPP. The DOE Carlsbad Area Office (CAO) is responsible for the management ofthe WIPP and for assuring that the WIPP and other WIPP-related sites have quality assurance programs that provide adequate oversight of TRU waste activities","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632834,"raw_reference":"PURPOSE AND SCOPE At § 194.22(a)(1), EPA requires WID to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990","cited_authors":null,"cited_year":null,"cited_title":"PURPOSE AND SCOPE At § 194.22(a)(1), EPA requires WID to adhere to a quality assurance program that implements the requirements ofthe following: 1) ASME NQA-1-1989 edition; 2) ASME NQA-2a-1990","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632835,"raw_reference":"Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1). The purpose of this EPA inspection is to verify adherence of WID's QA program to the requirements of § 194.22(a)(1). §§§ 194.22(a)(2) requires WID to execute its QA program for all its items and activities that are important to the containment of TRU waste in the WIPP. The scope of this EPA inspection is limited to the QA program for items and activities that are important to the containment of TRU waste at the WIPP. Inspection of CAO Audit A-00-14, August 7-8,2000","cited_authors":null,"cited_year":null,"cited_title":"Addenda, Part 2.7, to ASME NQA-2-1989 edition; and 3) ASME NQA-3-1989 edition (excluding Section 2.1(b) and (c) and Section 17.1)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632836,"raw_reference":"CAO. Memorandum, \"Subject: Audit (A-00-14) of Waste Isolation Division (WID) \", From: Samuel A. Vega, To: Joe Epstein, Dated: July 6, 2000. \"Attachment: A - Carlsbad Area Office Audit Plan.\"","cited_authors":"CAO. Memorandum, \"Subject: Audit (A-00-14) of Waste Isolation Division (WID) \", From: Samuel A. Vega, To: Joe Epstein, Dated: July 6","cited_year":"2000","cited_title":"Attachment: A - Carlsbad Area Office Audit Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632837,"raw_reference":"CAO. Memorandum, \"Subject: Audit (A-00-14) of Waste Isolation Division (WID) Limited Scope \", From: Samuel A. Vega, To: Joe Epstein, Dated: July 26, 2000. Attachment: A - Carlsbad Area Office Audit Plan.\"","cited_authors":"CAO. Memorandum, \"Subject: Audit (A-00-14) of Waste Isolation Division (WID) Limited Scope \", From: Samuel A. Vega, To: Joe Epstein, Dated: July 26","cited_year":"2000","cited_title":"Attachment: A - Carlsbad Area Office Audit Plan.\"","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632838,"raw_reference":"CAO. Letter, Marc A. Italiano, CAO, to Mike Eagle, EPA ORIA. February 19, 1999 [subject: Corrective actions for February 1999 EPA findings.]","cited_authors":null,"cited_year":null,"cited_title":"CAO. Letter, Marc A. Italiano, CAO, to Mike Eagle, EPA ORIA. February 19, 1999 [subject: Corrective actions for February 1999 EPA findings.]","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632839,"raw_reference":"CAO Audit Checklists for A-00-14. CAO. \"Summary for DOE Audit A-00-14 ofthe Westinghouse Waste Isolation Division, \" [presented to the EPA inspector by CAO during the audit close-out meeting on August 8, 2000. (See attachment 3 of this inspection report.)]","cited_authors":"CAO Audit Checklists for A-00-14. CAO. \"Summary for DOE Audit A-00-14 ofthe Westinghouse Waste Isolation Division, \" [presented to the EPA inspector by CAO during the audit close-out meeting on August 8","cited_year":"2000","cited_title":"(See attachment 3 of this inspection report.)]","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632840,"raw_reference":"WID. \"Software Screening and Action Plan\", WP 16-2, Revision 0 (effective 1/11/2000)","cited_authors":null,"cited_year":null,"cited_title":"Software Screening and Action Plan","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632841,"raw_reference":"WID. Corrective action file for \"1999 EPA Audit Finding 1 [EPA Finding 2]\"","cited_authors":null,"cited_year":null,"cited_title":"1999 EPA Audit Finding 1 [EPA Finding 2]","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632842,"raw_reference":"WID. Corrective action file for \"1999 EPA Audit Finding 2 [EPA Finding 3]\" Inspection of CAO Audit A-00-14, August 7-8,2000 08/02/00. P.16","cited_authors":null,"cited_year":null,"cited_title":"1999 EPA Audit Finding 2 [EPA Finding 3]","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632843,"raw_reference":"QA Manager), March 31,1999. WID. \"Quality Assurance Department Assessment Program\" WP 13-QA.03, Revision 4, (effective 8/27/99)","cited_authors":"QA Manager), March 31","cited_year":"1999","cited_title":"Quality Assurance Department Assessment Program","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632844,"raw_reference":"DOE Carlsbad Area Office. Quality Assurance Program Document, CAO-94-1012, Rev. 3, November 1999.","cited_authors":"DOE Carlsbad Area Office. Quality Assurance Program Document, CAO-94-1012, Rev. 3, November","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632845,"raw_reference":"Reporting, November 24,1999. DOE Carlsbad Area Office. Management Procedure 10.3, Rev. 3, Audits, November 24, 1999.","cited_authors":"Reporting, November 24","cited_year":"1999","cited_title":"DOE Carlsbad Area Office","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632846,"raw_reference":"DOE Carlsbad Area Office. Team Procedure 10.1, Rev. 1, Qualification of Audit Personnel and Certification of Lead Auditors, effective date November 24, 1999.","cited_authors":"DOE Carlsbad Area Office. Team Procedure 10.1, Rev. 1, Qualification of Audit Personnel and Certification of Lead Auditors, effective date November 24","cited_year":"1999","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632847,"raw_reference":"DOE Carlsbad Area Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6,1999. Inspection of CAO Audit A-00-14, August 7-8,2000 P.17","cited_authors":"DOE Carlsbad Area Office. Team Procedure 3.2, Rev. 1, Corrective Action Report (CAR) Trend Analysis and Reporting (QA only), December 6","cited_year":"1999","cited_title":"Inspection of CAO Audit A-00-14, August 7-8,2000 P.17","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632848,"raw_reference":"ATTACHMENT 1 PERSONNEL INTERVIEWED BY EPA INSPECTOR Inspection of CAO Audit A-00-14, August 7-8,2000 P.18","cited_authors":null,"cited_year":null,"cited_title":"ATTACHMENT 1 PERSONNEL INTERVIEWED BY EPA INSPECTOR Inspection of CAO Audit A-00-14, August 7-8,2000 P.18","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632849,"raw_reference":"SAIC/CTAC, Software Technical Specialist Inspection of CAO Audit A-00-14, August 7-8,2000 P.19","cited_authors":null,"cited_year":null,"cited_title":"SAIC/CTAC, Software Technical Specialist Inspection of CAO Audit A-00-14, August 7-8,2000 P.19","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632850,"raw_reference":"ATTACHMENT 2 INSPECTOR'S CHECKLIST FOR NQA-1 ELEMENT 18 Inspection of CAO Audit A-00-14, August 7-8,2000 P.20","cited_authors":null,"cited_year":null,"cited_title":"ATTACHMENT 2 INSPECTOR'S CHECKLIST FOR NQA-1 ELEMENT 18 Inspection of CAO Audit A-00-14, August 7-8,2000 P.20","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2632851,"raw_reference":"EPA INSPECTOR'S NQA-1 CHECKLIST EPA Inspection of CAO Audit A-00-14 of WED, August 7-8,2000","cited_authors":null,"cited_year":null,"cited_title":"EPA INSPECTOR'S NQA-1 CHECKLIST EPA Inspection of CAO Audit A-00-14 of WED, August 7-8,2000","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}