Memorandum: Cost Estimates for Additional Controls of Freeport’s Aisle Scrubber
Other documents for the same rulemaking (all, by stage)
References
GCT Evaluation from Freeport GCT Evaluation from Freeport 116,630 See Attachments B, C, D of this memo 127,893 134,879 1,468,945 226,287 150,905 237,247 3,702,286 6,165,071 Estimated using 20-year payback period and 7.75% interest Control Cost Manual. Section 2, Chapter 1. https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf EPA (Chapter dated 1995) Attachment A
WESP costs from BART analysis Facility Location Line No. Keetac16 Keewatin Indurating Furnace Capital cost ($/facility) 45,081,576 Annual Cost ($/facility) 11,531,318 1) Keetac BART Report, September 8, 2006. 2) Indurating furnace WESP flow rate is 848,000 ACFM. 3) Costs are presented in 2005 dollars. Freeport aisle scrubber flow rate: 1,670,000 acfm Need to escalate BART analysis cost for higher air flow rate. Cost escalation factor based on II&S analysis of flow rate and cost 7: Applying II&S cost escalation factor (50%) to BART analysis costs: Capital Cost Annual cost $67,700,435 $17,316,947 Need to scale cost from 2005 dollars to 2022 dollars: 2005 GDP 8 87.421 2022 GDP 127.192
GDP escalation factor 1.455 Applying the GDP escalation factor: Capital cost Annual cost 98,499,832 25,195,057 Cost Effectiveness $4,000,168 For more details, see the document titled: “Keetac BART Report”, September 8, 2006 (Docket Item No. EPA-HQOAR-2017-0664-0054). Escalation Factor Equation: Cost of equipment A = Cost of equipment B * (capacity of A/capacity of B)0.6 8 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application Attachment B Baghouse Costs Parameter Input Parameters:
GDP (1998) -- Inlet stream flowrate (acfm): -- Inlet stream temperature (°F): -- Dust type: -- Inlet dust loading (gr/ft3): -- Dust mass median diameter (microns): -- Filtration time (min): -- Dust specific resistance (in.H2O/fpm/lb/ft2): -- G/C ratio factors (shaker & reverse-air): A (Gas:Cloth Ratio): B (Fineness Factor): C (Dust Load Factor): -- Fraction of bags cleaned (shaker & rev-air): -- Insulation required? ('yes'=1;'no'=0): -- Stainless steel required? ('yes'=1;'no'=0): -- Bag material: -- Fabric effective residual drag (in. H2O/fpm): Value Source/Reference 1,302,043 fPM including HAP metal from secondary converters 0.00158
PEC($)-base: ' ' -esc.: TCI ($): Annual Cost Inputs: Operating factor (hr/yr): Operating labor rate ($/hr): Maintenance labor rate ($/hr): Operating labor factor (hr/sh): Maintenance labor factor (hr/sh): Electricity price ($/kWhr): Compressed air ($/1000 scf): Dust disposal ($/ton): Annual interest rate (fraction): Control system life (years): 225687.5111 Source/Reference Calculated using Inlet stream flowrate (ACFM) / Gas-to-cloth ratio (acfm/ft2 cloth area): Calculated using Gross/Net Area Ratio Value 1.1 * Net cloth area required (ft2) 10.472 Ferroalloy (EPA, 2015) 21552 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 847,769 137,669 89,500 1,074,939 Ferroalloy (EPA, 2015) 1,268,428 2,376,622 5,157,270 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 8640 $29.44 $29.44 Ferroalloy (EPA, 2015)
FRED, 2023 12 Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Parameter Value Capital recovery factor: 0.099964731 Bag life (years): Capital recovery factor (bags): 0.558847774
Taxes, insurance, admin. factor: 0.04 Annual Costs ($/yr): Shaker Style Baghouse Oper. labor 63,590 Supv. labor 9,539 Maint. labor 31,795 Maint. matl. 31,795 Electricity 902,704 Compressed air Bag replacement 226,287 Dust disposal 1,899 Overhead 82,032 Tax,ins.,adm 206,291 Cap. recov. 475,068 Total Annual Costs 2,030,999 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Attachment C Ductwork Costs Input Parameters:
DUCTS: COST BASE DATE: GDP 1993 COST ESCALATION: GDP 2022 -- Inlet stream flowrate (acfm): -- Duct velocity (ft/min): Value 68.877 1,302,043 5,815 -- Duct length (ft): -- Material of construction: -- Insulation thickness (in.): (text input) -- Duct design: 1000 Sheet-galv CS Circular-longitudinal Source/Reference
BEA, 2023 13 BEA, 2023 Freeport Test Data Back-calculated using pressure drop from GCT analysis Engineering judgement Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Cost equation parameters: -- Cost equation form: -- Control system installation factor: (if no system, enter '0') 2.03 0.784 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Fan-motor combined efficiency (fraction):
DESIGN PARAMETERS -- Duct diameter (in.): Ferroalloy (EPA, 2015) -- Pressure drop (in. w.c.): Freeport’s GCT analysis for Hg control system of similar size Freeport’s GCT analysis; p.
CAPITAL COSTS Ductwork Cost ($)--base: Ductwork Cost ($)--escalated: $69,123 $127,646 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Purchased Equipment Cost ($): Retrofit Adjustment (25%) Total Capital Investment ($): $137,858 $172,322 $258,483
ANNUAL COST INPUTS 8760 0.0845 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 0.0775
FRED, 2023 14 Ferroalloy (EPA, 2015) Operating factor (hours/year): Electricity price ($/kWhr): Annual interest rate (fractional): Ductwork economic life (years): Freeport ICR Data Ferroalloy (EPA, 2015) Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Input Parameters: Capital recovery factor (system):
Taxes, insurance, admin. factor: Labor, $/hr Value 0.099964731 0.04 $29.44 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015)
BLS, 2023 15 Item Electricity Taxes, insurance, administrative Capital recovery Labor Cost ($/yr) $566,241 $10,339 $25,839 $2,438 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Overhead Total Annual Cost $1,463 $606,320
ANNUAL COSTS Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Attachment D Lime Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR) Lime Cost, $/lb Dust Disposal Cost, $/Ton Capital Recovery Factor (CRF)
GDP, 2022 GDP, 1991 Lime Adjustment Factor (AF) Lime Injection Rate (lb/MMacf)
BLS, 2023 16 Data from Freeport comment ($240/ton lime; converted to $/lb) Data from Freeport comment ($100/ton)
CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 17
BEA, 2023 18 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 19 $8,059 $1,209 $103,084 $91,632 $34,362.00 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $67,411 $20,617 $51,524 $377,897 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].
FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Taken from: U.S. Bureau of Economic Analysis, Section 1, "Table 1.1.9. Implicit Price Deflators for Gross Domestic Product" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-1095. Appendix E page E-3; pdf page 66