PM2.5 SIP Evaluation Report - Kennecott Utah Copper LLC - Molybdenum
Other documents for the same rulemaking (all, by stage)
References
Cleaver Brooks. (2017, July 27). Kennecott Refinery Boiler Replacement.
Countess Environmental. (2006, September 7). WRAP Fugitive Dust Handbook.
Environmental Protection Agency. (2002, June 12). Federal Register June 12, 2002.
ENVIRONMENTAL PROTECTION, & AGENCY. (2006, October 6). Federal Register Friday October 6, 2006. Environmental Protection, & Agency. (2007, July 3). Federal Register Tuesday July 3 2007. PM2.5 Serious SIP – BACT for Small Sources. (2017, August 11). Utah DAQ Minor Source
NSR. Process Combustion Systems. (2018, May 15). Kennecott Smelter Boilers.
Steve Schnoor. (2018, May 30). Kennecott Part H Limitations PM2.5 Serious SIP_Comment.docx. U.S. Environmental Protection Agency. (1994, March 1). Alternative Control Techniques (ACT) Document - NOx Emissions from Industrial/Commercial/ Institutional Boilers. •• 2 •• 0~ •• a0 /VSR Rio Tinto Kennecott 4700 Daybreak Parkway South Jordan, Utah 84095 801-204-2814
APR 28 2017 DIVISION OF AIR QUALITY Steve Schnoor Manager - Environment, Land and Water April 27, 2017 Mr. Bryce Bird Utah Division of Air Quality 150 North 1950 West Salt Lake City, Utah 84114 Attn: Mr. Nanda Meli Subject: Kennecott Utah Copper LLC PM2.s SIP Best Available Control Technology Analysis Dear Mr. Bird: Kennecott Utah Copper LLC (KUC) is submitting the PM2.s State Implementation Plan (SIP) Best Available Control Technology (BACT) analysis, as requested by the Utah Division of Air Quality. Attached are BACr determinations for emission sources at the following KUC facilities • Bingham Canyon Mine and Copperton Concentrator Utah Power Plant, Tailings and Laboratory
FINAL REPORT Kennecott Utah Copper PM2.5 State Implementation Plan Best Available Control Technology Determinations Submitted to Utah Division of Air Qua Prepared for: Kennecott Utah Copper Prepared by: cli2tn April 2017
FINAL BACT Determinations for the Bingham Canyon Mine anc Copperton Concentrator Prepared for Kennecott Utah Copper April 2017 Prepared by chzm- 4245 South Riverboat Road Suite 210
1. WRAP, 2004. Definitions of Dust, Western Regional Air Partnership, October 21.
2. Environ, 2005. Feasibility Analysis of the Implementation of WRAP’s Dust
3. Cowherd, C. Jr., Axetell, K. Jr., Maxwell, C.M., Jutze, G.A., 1974. Development of Emission Factors for Fugitive Dust Sources, EPA-450/3-74/037.
4. ASTM, 1984. American Society of Testing and Materials, Standard Method for Sieve Analysis of Fine and Coarse Aggregates, Method C-136, 84a.
5. Cowherd, C. Jr., Bohn, R., Cuscino, T. Jr., 1979. Iron and Steel Plant Open Source Fugitive Emission Evaluation, EPA-600/2-79/1 03.
6. Woodruff, N.P. Siddoway, F.H., 1965. A Wind Erosion Equation, Soil Sci. Soc. Am. Proc. 29(5): 602-8.
7. Cowherd, C. Jr., Muleski, G.E., Englehart, P.J., Gillette, D.A., 1985. Rapid Assessment of Exposure to Particulate Emissions from Surface Contamination Sites,
EPA/600/8-85/002. 8. Gillette, D.A., 1978. A Wind Tunnel Simulation of the Erosion of the Soil, Atmos. Environ., 12: 1735-43.
9. Cowherd, C. Jr., 1988. A Refined Scheme for Calculation of Wind Generated PM Emissions from Storage Piles, in Proceedings: APCA/EPA Conference on PM10: Implementation of Standards.
10. NEDS, 1992. Local Climatological Data: Annual and Monthly Summaries, National Environmental Data Service, National Climatic Center, Asheville, NC.
11. Billings-Stunder, B.J. and Arya, S.P.S., 1988. Windbreak Effectiveness for Storage Pile Fugitive Dust Control: A Wind Tunnel Study, J. APCA 38: 135-43. 1-14
12. MRI, 2005. Remote Sensing Imagery for an Inventory of Vacant Land Soil Stability and Unpaved Private Roads, final report prepared for Clark County, Nevada, December. 13. U.S. EPA, 2005. Air CHIEF CD-ROM, Version 12, Research Triangle Park, NC.
14. USEPA, 2006. Compilation of Air Pollutant Emission Factors, Volume I: Stationary and Area Sources, Research Triangle Park, NC.
15. Cowherd, C. Jr., Muleski, G.E., Kinsey, J.S., 1988. Control of Open Fugitive Dust
Flocchini, R. G., James, T. A., et al., 2001. Sources and Sinks of PM10 in the San Joaquin Valley, Interim Report for U.S. Department of Agriculture.
California Agricultural Statistics Service, 2002. 2000 acreage extracted from agricultural commissioner’s reports, Sacramento, CA, December.
Gaffney, P. H., Yu, H., 2002. Agricultural Harvest: Geologic Particulate Matter Emission Estimates, Background Document prepared by the California Air Resources Board, December.
Cassel, T., 2002. Evaluation of ARB application of UCD emission factors, prepared for San Joaquin Valley Ag Tech Committee, July 12.
CARB, 2006. Private communication between Patrick Gaffney and Richard
MRI, 2006. Background Document for Revisions to Fine Fraction Ratios Used for
Coates, W., 1994. Cotton Tillage/Quantification of Particulate Emissions, Final Report prepared for Arizona Department of Environmental Quality Air Assessment Division by the University of Arizona Tucson.
Grantz, D.A., Vaughn, D.L., R.J., Kim, B., VanCuren, T., Campbell, D., 1998. California Agriculture, Vol. 52, Number 4, Pages 8-13, July-August.
MRI, 1981. The Role of Agricultural Practices in Fugitive Dust Emissions, Draft Final Report prepared for California Air Resources Board by Midwest Research
Institute, Project No. 4809-L, April 17. 10. SCAQMD, 1997. Air Quality Management Plan, Appendix IV-A: Stationary and Mobile Source Control Measures, CM#97BCM-04, South Coast AQMD, Diamond
Bar, CA, February. 11. U.S. EPA, 1992. Fugitive Dust Background Document and Technical Information Document for Best Available Control Measures. U.S. EPA, Research Triangle Park,
NC, September. 12. CARB, 2003. Emission Inventory Procedural Manual Volume III: Methods for Assessing Area Source Emissions, California Air Resources Board, Sacramento, CA, November.
MRI, 2001 3-20 The number of vehicles per day, wet days per year, workdays per year, and the economic life of the control are determined from climatic and industrial records. The number of emission days per year are calculated by subtracting the number of annual wet days from the number of annual workdays as follows: Number of workdays/year – Wet days/year = 260 – 10 = 250 Gravel aprons at the two construction site egress points have been chosen as the applied control measure. The control efficiency was obtained from MRI, 2001. Step 2. Obtain PM10 Emission Factor. The PM10 emission factor for construction and demolition dust is 6 g/vehicle. Step 3. Calculate Uncontrolled PM Emissions. The PM10 emission factor, EF, (given in Step 2) is multiplied by the number of vehicles per day and by the number of emission days per year (both under activity data) and divided by 454 grams/lb and 2000 lb/ton to compute the annual PM10 emissions, as follows: Annual PM10 emissions = (EF x Veh/day x Emission days/year)/(454 x 2,000) Annual PM10 emissions = (6 x 100 x 250) / (454 x 2,000) = 0.165 tons/year Annual PM2.5 emissions = 0.1 x PM10 emissions Annual PM2.5 emissions = (0.1 x 0.165 tons/year) = 0.0165 tons/year Step 4. Calculate Controlled PM Emissions. The controlled PM emissions (i.e., the
Midwest Research Institute, 1999. Estimating Particulate Matter Emissions From Construction Operations, Kansas City, Missouri, September. U.S. EPA, 1995. Compilation of Air Pollutant Emission Factors. AP-42. Fifth
Muleski, G., 1996. Improvement of Specific Emission Factors (BACM Project No. 1), Final Report. Midwest Research Institute, March.
Cowherd, C. Jr., Axtell, K. Jr., Maxwell, C.M., Jutze, G.A., 1974. Development of Emission Factors for Fugitive Dust Sources, EPA Publication No. EPA-450/3-74037, NTIS Publication No. PB-238 262.
Muleski, G. E., Cowherd, C., 1999. Emission Measurements of Particle Mass and Size Emission Profiles From Construction Activities, EPA-600/R-99-091 (NTIS PB2000-101-11), U.S. Environmental Protection Agency, Research Triangle Park,
Anderson, C.L., Brady, M.J. 1998. General Conformity Analysis for Major Construction Projects: An Example Analysis of Fugitive PM10 Emissions. Paper 98-MP4B.06 presented at the Annual Meeting of the Air & Waste Management
Association, June 1998. MRI, 2006. Background Document for Revisions to Fine Fraction Ratios Used for
Institute, Project No. 110397, February 1. PEDCo Environmental Specialists, 1973. Investigation of Fugitive Dust Sources – Emissions and Control, prepared for the Environmental Protection Agency, OAQPS, contract No. 68-02-0044, May. California Department of Finance, California Statistical Abstract - 2000, Section I,
10. Midwest Research Institute, 1974. Inventory of Agricultural Tilling, Unpaved Roads and Airstrips and Construction Sites, prepared for the U.S. Environmental Protection
11. South Coast Air Quality Management District, 1977. Emissions from Construction/Demolition, Emission Programs Unit, December.
12. Taback, J.J., et al, 1980. Inventory of Emissions from Non-Automotive Vehicular
17. Elswick, F., 2005. Emission Control Methods for the Construction Industry, WRAP Fugitive Dust Control Workshop, Palm Springs, CA, May 10-11.
18. MRI, 1993. Background Documentation For AP-42 Section 11.2.4, Heavy Construction Operations, EPA Contract No. 69-D0-0123, Midwest Research
Institute, Kansas City, MO, April. 19. C. Cowherd, et al., 1988. Control Of Open Fugitive Dust Sources, EPA-450/3-88008, U.S. Environmental Protection Agency, Research Triangle Park, NC, September.
20. Muleski, G. E., Cowherd, C., 2001. Particulate Emissions From Controlled Construction Activities, EPA-600/R-01-031 (NTIS PB2001-107255), U.S. Environmental Protection Agency, Office of Air Quality Planning and Standards, Research Triangle Park, NC, April.