{"document":{"doc_id":213431,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum: Cost Estimates for Additional Controls of Freeport’s Aisle Scrubber","date":"2023-07-24","url":"https://www.regulations.gov/document/EPA-HQ-OAR-2020-0430-0144","source_native_id":"EPA-HQ-OAR-2020-0430-0144","status":"fetched","abstract":null,"action":null},"dockets":["EPA-HQ-OAR-2020-0430"],"rins":["RIN 2060-AU63"],"related":[{"doc_id":1194,"source":"ria","org":"EPA","doc_type":"economic_analysis","title":"Memorandum: Economic Impact Analysis for Proposed Residual Risk and Technology Review of the National Emission Standards for Hazardous Air Pollutants for Primary Copper Smelting Sources.  September 3, 2021","date":"2022-01-11"},{"doc_id":5357,"source":"fr_rule","org":"ENVIRONMENTAL PROTECTION AGENCY","doc_type":"Proposed Rule","title":"National Emission Standards for Hazardous Air Pollutants: Primary Copper Smelting Residual Risk and Technology Review and Primary Copper Smelting Area Source Technology Review","date":"2022-01-11"},{"doc_id":128589,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to initiate E.O. 12866 and 13563 review - Primary Copper Smelting RTR NPRM","date":"2022-01-11"},{"doc_id":128590,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Document submitted to conclude E.O. 12866 and 13563 review - Primary Copper Smelting RTR NPRM","date":"2022-01-11"},{"doc_id":128591,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (08/27/2021)","date":"2022-01-11"},{"doc_id":128592,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/01/2021)","date":"2022-01-11"},{"doc_id":128593,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/01/2021)","date":"2022-01-11"},{"doc_id":128594,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/27/2021)","date":"2022-01-11"},{"doc_id":128595,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/28/2021)","date":"2022-01-11"},{"doc_id":128596,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/05/2021)","date":"2022-01-11"},{"doc_id":128597,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/06/2021)","date":"2022-01-11"},{"doc_id":128598,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/14/2021)","date":"2022-01-11"},{"doc_id":128599,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (10/15/2021)","date":"2022-01-11"},{"doc_id":128600,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (11/18/2021)","date":"2022-01-11"},{"doc_id":128601,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (11/19/2021)","date":"2022-01-11"},{"doc_id":128602,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/20/2021)","date":"2022-01-11"},{"doc_id":128603,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/02/2021)","date":"2022-01-11"},{"doc_id":128604,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/14/2021)","date":"2022-01-11"},{"doc_id":128605,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/17/2021)","date":"2022-01-11"},{"doc_id":128606,"source":"docket_item","org":"EPA","doc_type":"review_record","title":"Part of E.O. 12866 and 13563 Review: EPA Response to Interagency Request for briefing materials for the overview briefing on the Primary Copper Smelting RTR NPRM (2060-AU63) (09/20/2021)","date":"2022-01-11"},{"doc_id":177047,"source":"docket_item","org":"EPA","doc_type":"data","title":"Miami/Sulfur Dioxide (SO2) Nonattainment Area","date":"2022-01-11"},{"doc_id":177048,"source":"docket_item","org":"EPA","doc_type":"report","title":"Risk and Technology Review - Analysis of Demographic Factors For Populations Living Near Primary Copper Smelting Source Category Operations. June 9, 2021","date":"2022-01-11"},{"doc_id":177050,"source":"docket_item","org":"EPA","doc_type":"data","title":"Miami/PM-10 Nonattainment Area","date":"2022-01-11"},{"doc_id":177051,"source":"docket_item","org":"EPA","doc_type":"report","title":"Risk and Technology Review - Analysis of Demographic Factors For Populations Living Near Primary Copper Smelting Post-Control Source Category Operations. June 1, 2021","date":"2022-01-11"},{"doc_id":177052,"source":"docket_item","org":"EPA","doc_type":"report","title":"Freeport-McMoRan Miami, Inc. - Consent Order Docket No. A-10-18 Response to Items III.C and III.D","date":"2022-01-11"},{"doc_id":177053,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Guidelines for Carcinogen Risk Assessment","date":"2022-01-11"},{"doc_id":177054,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Mining - Best Practices Plant-Wide Assessment Case Study","date":"2022-01-11"},{"doc_id":177055,"source":"docket_item","org":"EPA","doc_type":"report","title":"New Technologies Emerging in Copper Mining","date":"2022-01-11"},{"doc_id":177056,"source":"docket_item","org":"EPA","doc_type":"data","title":"Primary Copper Industry Review (Spreadsheet)","date":"2022-01-11"},{"doc_id":177057,"source":"docket_item","org":"EPA","doc_type":"report","title":"PM2.5 SIP Evaluation Report - Kennecott Utah Copper LLC - Molybdenum","date":"2022-01-11"},{"doc_id":177058,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Risk and Technology Review (RTR) Risk Assessment Methodologies: For Review by EPA's Science Advisory Board with Case Studies-MACT I Petroleum Refining Sources and Portland Cement Manufacturing","date":"2022-01-11"},{"doc_id":177059,"source":"docket_item","org":"EPA","doc_type":"report","title":"Regulatory Overview for Stakeholder Outreach For: Residual Risk and Technology Review for Primary Copper Smelting.  May 11, 2021","date":"2022-01-11"},{"doc_id":177060,"source":"docket_item","org":"EPA","doc_type":"data","title":"Risk Assessment and Modeling-Human Exposure Model (HEM)","date":"2022-01-11"},{"doc_id":177061,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Dose-Response Assessment for Accessing Health Risks Associated with Exposure to Hazardous Air Pollutants","date":"2022-01-11"},{"doc_id":177062,"source":"docket_item","org":"EPA","doc_type":"report","title":"ASARCO LLC Hayden Converter Retrofit Project - An Update","date":"2022-01-11"},{"doc_id":177063,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Guidelines for Carcinogen Risk Assessment","date":"2022-01-11"},{"doc_id":177064,"source":"docket_item","org":"EPA","doc_type":"correspondence","title":"Memorandum: MACT Floor Analysis for the Primary Copper Smelting Source Category. November 27, 2020","date":"2022-01-11"},{"doc_id":177065,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Air Toxics Risk Assessment Reference Library","date":"2022-01-11"},{"doc_id":177066,"source":"docket_item","org":"EPA","doc_type":"report","title":"Technical Review and Evaluation of Application for Air Quality Control Permit Number 1000042 - ASARCO","date":"2022-01-11"},{"doc_id":177067,"source":"docket_item","org":"EPA","doc_type":"data","title":"Hayden/Sulfur Dioxide (SO2) Nonattainment Area","date":"2022-01-11"},{"doc_id":177068,"source":"docket_item","org":"EPA","doc_type":"report","title":"Residual Risk Assessment for the Primary Copper Smelting Source Category in Support of the Risk and Technology Review 2021 Proposed Rule","date":"2022-01-11"},{"doc_id":177069,"source":"docket_item","org":"EPA","doc_type":"report","title":"Minimal Risk Levels (MRLs) for Hazardous Substances","date":"2022-01-11"},{"doc_id":177070,"source":"docket_item","org":"EPA","doc_type":"report","title":"Developing New Ways to Advance Copper Production","date":"2022-01-11"},{"doc_id":193022,"source":"docket_item","org":"EPA","doc_type":"publication","title":"A Review of the Reference Dose and Reference Concentration Processes","date":"2022-01-11"},{"doc_id":193025,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Documentation for Developing the Initial Source Category. Final Report.","date":"2022-01-11"},{"doc_id":193030,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Digital Government - Building a 21st Century Platform to Better Serve the American People","date":"2022-01-11"},{"doc_id":193033,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Screening Methodologies to Support Risk and Technology Reviews (RTR): A Case Study","date":"2022-01-11"},{"doc_id":193034,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Integrated Risk Information System (IRIS) Glossary","date":"2022-01-11"},{"doc_id":193035,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Enhancing the Flotation Recovery of Copper Minerals in Smelter Slags from Namibia Prior to Disposal","date":"2022-01-11"},{"doc_id":193036,"source":"docket_item","org":"EPA","doc_type":"publication","title":"OEHHA Acute, 8-Hour and Chronic Reference Exposure Level (REL) Summary","date":"2022-01-11"},{"doc_id":193037,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Efficient Recovery of Copper and Cobalt from the Matte-Slag Mixture of ISA Furnace by Injection of Coke and Pyrite","date":"2022-01-11"},{"doc_id":193039,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Methods for Derivation of Inhalation Reference Concentrations and Application of Inhalation Dosimetry","date":"2022-01-11"},{"doc_id":193040,"source":"docket_item","org":"EPA","doc_type":"publication","title":"Reduction of Copper Smelting Slag Using Waste Cooking Oil","date":"2022-01-11"},{"doc_id":206083,"source":"docket_item","org":"EPA","doc_type":"other","title":"Class I Air Quality Permit (66039) - Renewal: Freeport-McMoRan Miami, Inc.","date":"2022-01-11"},{"doc_id":206084,"source":"docket_item","org":"EPA","doc_type":"other","title":"Class I Air Quality Permit (39948) - Renewal: ASARCO LLC","date":"2022-01-11"},{"doc_id":206085,"source":"docket_item","org":"EPA","doc_type":"other","title":"Improving Our Regulations: Final Plan for Periodic Retrospective Reviews of Existing Regulations","date":"2022-01-11"},{"doc_id":206086,"source":"docket_item","org":"EPA","doc_type":"other","title":"Title V Operating Permit: Kennecott Utah Copper LLC","date":"2022-01-11"},{"doc_id":206087,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supporting Statement: NESHAP for Primary Copper Smelting (40 CFR Part 63, Subpart EEEEEE) (Proposed Amendments). December 2020","date":"2022-01-11"},{"doc_id":206088,"source":"docket_item","org":"EPA","doc_type":"other","title":"Class I Air Quality Permit (#66039) for Freeport-McMoRan Miami, Inc. (FMMI) Copper Smelter","date":"2022-01-11"},{"doc_id":206089,"source":"docket_item","org":"EPA","doc_type":"other","title":"Supporting Statement: NESHAP for Primary Copper Smelting (40 CFR Part 63, Subpart QQQ) (Proposed Amendments). December 2020","date":"2022-01-11"}],"references":[{"citation_id":2472389,"raw_reference":"GCT Evaluation from Freeport GCT Evaluation from Freeport 116,630 See Attachments B, C, D of this memo 127,893 134,879 1,468,945 226,287 150,905 237,247 3,702,286 6,165,071 Estimated using 20-year payback period and 7.75% interest Control Cost Manual. Section 2, Chapter 1. https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf EPA (Chapter dated 1995) Attachment A","cited_authors":"GCT Evaluation from Freeport GCT Evaluation from Freeport 116,630 See Attachments B, C, D of this memo 127,893 134,879 1,468,945 226,287 150,905 237,247 3,702,286 6,165,071 Estimated using 20-year payback period and 7.75% interest Control Cost Manual. Section 2, Chapter 1. https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf EPA (Chapter dated","cited_year":"1995","cited_title":"Attachment A","cited_venue":null,"cited_doi":null,"cited_url":"https://www.epa.gov/sites/default/files/202007/documents/cs2ch1.pdf","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472390,"raw_reference":"WESP costs from BART analysis Facility Location Line No. Keetac16 Keewatin Indurating Furnace Capital cost ($/facility) 45,081,576 Annual Cost ($/facility) 11,531,318 1) Keetac BART Report, September 8, 2006. 2) Indurating furnace WESP flow rate is 848,000 ACFM. 3) Costs are presented in 2005 dollars. Freeport aisle scrubber flow rate: 1,670,000 acfm Need to escalate BART analysis cost for higher air flow rate. Cost escalation factor based on II&S analysis of flow rate and cost 7: Applying II&S cost escalation factor (50%) to BART analysis costs: Capital Cost Annual cost $67,700,435 $17,316,947 Need to scale cost from 2005 dollars to 2022 dollars: 2005 GDP 8 87.421 2022 GDP 127.192","cited_authors":"WESP costs from BART analysis Facility Location Line No. Keetac16 Keewatin Indurating Furnace Capital cost ($/facility) 45,081,576 Annual Cost ($/facility) 11,531,318 1) Keetac BART Report, September 8","cited_year":"2006","cited_title":"2) Indurating furnace WESP flow rate is 848,000 ACFM. 3) Costs are presented in 2005 dollars","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472391,"raw_reference":"GDP escalation factor 1.455 Applying the GDP escalation factor: Capital cost Annual cost 98,499,832 25,195,057 Cost Effectiveness $4,000,168 For more details, see the document titled: “Keetac BART Report”, September 8, 2006 (Docket Item No. EPA-HQOAR-2017-0664-0054). Escalation Factor Equation: Cost of equipment A = Cost of equipment B * (capacity of A/capacity of B)0.6 8 Taken from: U.S. Bureau of Economic Analysis, Section 1, \"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product\" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application Attachment B Baghouse Costs Parameter Input Parameters:","cited_authors":"GDP escalation factor 1.455 Applying the GDP escalation factor: Capital cost Annual cost 98,499,832 25,195,057 Cost Effectiveness $4,000,168 For more details, see the document titled: “Keetac BART Report”, September 8, 2006 (Docket Item No. EPA-HQOAR-2017-0664-0054). Escalation Factor Equation: Cost of equipment A = Cost of equipment B * (capacity of A/capacity of B)0.6 8 Taken from: U.S. Bureau of Economic Analysis, Section 1, \"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product\" (accessed Thursday, February 2","cited_year":"2023","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":"https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472392,"raw_reference":"GDP (1998) -- Inlet stream flowrate (acfm): -- Inlet stream temperature (°F): -- Dust type: -- Inlet dust loading (gr/ft3): -- Dust mass median diameter (microns): -- Filtration time (min): -- Dust specific resistance (in.H2O/fpm/lb/ft2): -- G/C ratio factors (shaker & reverse-air): A (Gas:Cloth Ratio): B (Fineness Factor): C (Dust Load Factor): -- Fraction of bags cleaned (shaker & rev-air): -- Insulation required? ('yes'=1;'no'=0): -- Stainless steel required? ('yes'=1;'no'=0): -- Bag material: -- Fabric effective residual drag (in. H2O/fpm): Value Source/Reference 1,302,043 fPM including HAP metal from secondary converters 0.00158","cited_authors":"GDP","cited_year":"1998","cited_title":"-- Inlet stream flowrate (acfm): -- Inlet stream temperature (°F): -- Dust type: -- Inlet dust loading (gr/ft3): -- Dust mass median diameter (microns): -- Filtration time (min): -- Dust specific resistance (in.H2O/fpm/lb/ft2): -- G/C ratio factors (shaker & reverse-air): A (Gas:Cloth Ratio): B (Fineness Factor): C (Dust Load Factor): -- Fraction of bags cleaned (shaker & rev-air): -- Insulation required?","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472393,"raw_reference":"PEC($)-base: ' ' -esc.: TCI ($): Annual Cost Inputs: Operating factor (hr/yr): Operating labor rate ($/hr): Maintenance labor rate ($/hr): Operating labor factor (hr/sh): Maintenance labor factor (hr/sh): Electricity price ($/kWhr): Compressed air ($/1000 scf): Dust disposal ($/ton): Annual interest rate (fraction): Control system life (years): 225687.5111 Source/Reference Calculated using Inlet stream flowrate (ACFM) / Gas-to-cloth ratio (acfm/ft2 cloth area): Calculated using Gross/Net Area Ratio Value 1.1 * Net cloth area required (ft2) 10.472 Ferroalloy (EPA, 2015) 21552 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 847,769 137,669 89,500 1,074,939 Ferroalloy (EPA, 2015) 1,268,428 2,376,622 5,157,270 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 8640 $29.44 $29.44 Ferroalloy (EPA, 2015)","cited_authors":"PEC($)-base: ' ' -esc.: TCI ($): Annual Cost Inputs: Operating factor (hr/yr): Operating labor rate ($/hr): Maintenance labor rate ($/hr): Operating labor factor (hr/sh): Maintenance labor factor (hr/sh): Electricity price ($/kWhr): Compressed air ($/1000 scf): Dust disposal ($/ton): Annual interest rate (fraction): Control system life (years): 225687.5111 Source/Reference Calculated using Inlet stream flowrate (ACFM) / Gas-to-cloth ratio (acfm/ft2 cloth area): Calculated using Gross/Net Area Ratio Value 1.1 * Net cloth area required (ft2) 10.472 Ferroalloy (EPA","cited_year":"2015","cited_title":"21552 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 847,769 137,669 89,500 1,074,939 Ferroalloy (EPA, 2015) 1,268,428 2,376,622 5,157,270 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 8640 $29.44 $29.44 Ferroalloy (EPA, 2015)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472394,"raw_reference":"FRED, 2023 12 Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].","cited_authors":"FRED, 2023 12 Ferroalloy (EPA","cited_year":"2015","cited_title":"Bureau of Labor Statistics, May 2021","cited_venue":null,"cited_doi":null,"cited_url":"https://www.bls.gov/oes/current/oes_nat.htm]","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472395,"raw_reference":"FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Parameter Value Capital recovery factor: 0.099964731 Bag life (years): Capital recovery factor (bags): 0.558847774","cited_authors":"FRED","cited_year":"2023","cited_title":"Federal Reserve Economic Data (FRED)","cited_venue":null,"cited_doi":null,"cited_url":"https://fred.stlouisfed.org/series/PRIME","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472396,"raw_reference":"Taxes, insurance, admin. factor: 0.04 Annual Costs ($/yr): Shaker Style Baghouse Oper. labor 63,590 Supv. labor 9,539 Maint. labor 31,795 Maint. matl. 31,795 Electricity 902,704 Compressed air Bag replacement 226,287 Dust disposal 1,899 Overhead 82,032 Tax,ins.,adm 206,291 Cap. recov. 475,068 Total Annual Costs 2,030,999 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Attachment C Ductwork Costs Input Parameters:","cited_authors":"Taxes, insurance, admin. factor: 0.04 Annual Costs ($/yr): Shaker Style Baghouse Oper. labor 63,590 Supv. labor 9,539 Maint. labor 31,795 Maint. matl. 31,795 Electricity 902,704 Compressed air Bag replacement 226,287 Dust disposal 1,899 Overhead 82,032 Tax,ins.,adm 206,291 Cap. recov. 475,068 Total Annual Costs 2,030,999 Source/Reference Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Attachment C Ductwork Costs Input Parameters:","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472397,"raw_reference":"DUCTS: COST BASE DATE: GDP 1993 COST ESCALATION: GDP 2022 -- Inlet stream flowrate (acfm): -- Duct velocity (ft/min): Value 68.877 1,302,043 5,815 -- Duct length (ft): -- Material of construction: -- Insulation thickness (in.): (text input) -- Duct design: 1000 Sheet-galv CS Circular-longitudinal Source/Reference","cited_authors":null,"cited_year":null,"cited_title":"DUCTS: COST BASE DATE: GDP 1993 COST ESCALATION: GDP 2022 -- Inlet stream flowrate (acfm): -- Duct velocity (ft/min): Value 68.877 1,302,043 5,815 -- Duct length (ft): -- Material of construction: -- Insulation thickness (in.): (text input) -- Duct design: 1000 Sheet-galv CS Circular-longitudinal Source/Reference","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472398,"raw_reference":"BEA, 2023 13 BEA, 2023 Freeport Test Data Back-calculated using pressure drop from GCT analysis Engineering judgement Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Cost equation parameters: -- Cost equation form: -- Control system installation factor: (if no system, enter '0') 2.03 0.784 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Fan-motor combined efficiency (fraction):","cited_authors":"BEA, 2023 13 BEA, 2023 Freeport Test Data Back-calculated using pressure drop from GCT analysis Engineering judgement Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Cost equation parameters: -- Cost equation form: -- Control system installation factor: (if no system, enter '0') 2.03 0.784 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) -- Fan-motor combined efficiency (fraction):","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472399,"raw_reference":"DESIGN PARAMETERS -- Duct diameter (in.): Ferroalloy (EPA, 2015) -- Pressure drop (in. w.c.): Freeport’s GCT analysis for Hg control system of similar size Freeport’s GCT analysis; p.","cited_authors":"DESIGN PARAMETERS -- Duct diameter (in.): Ferroalloy (EPA","cited_year":"2015","cited_title":"-- Pressure drop (in","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472400,"raw_reference":"CAPITAL COSTS Ductwork Cost ($)--base: Ductwork Cost ($)--escalated: $69,123 $127,646 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Purchased Equipment Cost ($): Retrofit Adjustment (25%) Total Capital Investment ($): $137,858 $172,322 $258,483","cited_authors":"CAPITAL COSTS Ductwork Cost ($)--base: Ductwork Cost ($)--escalated: $69,123 $127,646 Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015) Purchased Equipment Cost ($): Retrofit Adjustment (25%) Total Capital Investment ($): $137,858 $172,322 $258,483","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472401,"raw_reference":"ANNUAL COST INPUTS 8760 0.0845 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 0.0775","cited_authors":"ANNUAL COST INPUTS 8760 0.0845 Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) 0.0775","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472402,"raw_reference":"FRED, 2023 14 Ferroalloy (EPA, 2015) Operating factor (hours/year): Electricity price ($/kWhr): Annual interest rate (fractional): Ductwork economic life (years): Freeport ICR Data Ferroalloy (EPA, 2015) Taken from: U.S. Bureau of Economic Analysis, Section 1, \"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product\" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application","cited_authors":"FRED, 2023 14 Ferroalloy (EPA","cited_year":"2015","cited_title":"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product","cited_venue":null,"cited_doi":null,"cited_url":"https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472403,"raw_reference":"FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Input Parameters: Capital recovery factor (system):","cited_authors":"FRED","cited_year":"2023","cited_title":"Federal Reserve Economic Data (FRED)","cited_venue":null,"cited_doi":null,"cited_url":"https://fred.stlouisfed.org/series/PRIME","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472404,"raw_reference":"Taxes, insurance, admin. factor: Labor, $/hr Value 0.099964731 0.04 $29.44 Source/Reference Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015)","cited_authors":"Taxes, insurance, admin. factor: Labor, $/hr Value 0.099964731 0.04 $29.44 Source/Reference Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472405,"raw_reference":"BLS, 2023 15 Item Electricity Taxes, insurance, administrative Capital recovery Labor Cost ($/yr) $566,241 $10,339 $25,839 $2,438 Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Overhead Total Annual Cost $1,463 $606,320","cited_authors":"BLS, 2023 15 Item Electricity Taxes, insurance, administrative Capital recovery Labor Cost ($/yr) $566,241 $10,339 $25,839 $2,438 Ferroalloy (EPA","cited_year":"2015","cited_title":"Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Ferroalloy (EPA, 2015) Overhead Total Annual Cost $1,463 $606,320","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472406,"raw_reference":"ANNUAL COSTS Ferroalloy (EPA, 2015) Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]. Attachment D Lime Injection Parameters Annual Operating Hours, hr/yr (H) Exhaust Gas Flow Rate, acfm (Qa) Exhaust Gas Flow Rate, dscfm (Q) Operating Labor Rate, $/hr (LR) Lime Cost, $/lb Dust Disposal Cost, $/Ton Capital Recovery Factor (CRF)","cited_authors":"ANNUAL COSTS Ferroalloy (EPA","cited_year":"2015","cited_title":"Bureau of Labor Statistics, May 2021","cited_venue":null,"cited_doi":null,"cited_url":"https://www.bls.gov/oes/current/oes_nat.htm]","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472407,"raw_reference":"GDP, 2022 GDP, 1991 Lime Adjustment Factor (AF) Lime Injection Rate (lb/MMacf)","cited_authors":null,"cited_year":null,"cited_title":"GDP, 2022 GDP, 1991 Lime Adjustment Factor (AF) Lime Injection Rate (lb/MMacf)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472408,"raw_reference":"BLS, 2023 16 Data from Freeport comment ($240/ton lime; converted to $/lb) Data from Freeport comment ($100/ton)","cited_authors":null,"cited_year":null,"cited_title":"BLS, 2023 16 Data from Freeport comment ($240/ton lime; converted to $/lb) Data from Freeport comment ($100/ton)","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472409,"raw_reference":"CRF calculated assuming 20-year equipment life and 7.75% interest (FRED, 2023) 17","cited_authors":"CRF calculated assuming 20-year equipment life and 7.75% interest (FRED","cited_year":"2023","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472410,"raw_reference":"BEA, 2023 18 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 19 $8,059 $1,209 $103,084 $91,632 $34,362.00 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $67,411 $20,617 $51,524 $377,897 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May 2021. Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm].","cited_authors":"BEA, 2023 18 BEA, 2023 Calculated control efficiency Calculated using algorithm 4,500 x (Q/1,976)0.6 x (1.2 retrofit factor) x CEPCI Adj. 19 $8,059 $1,209 $103,084 $91,632 $34,362.00 Calculated using (0.25 hr/8-hr shift) x H x LR Calculated using 0.15 x Operating Labor Calculated using 0.2 x TCI $67,411 $20,617 $51,524 $377,897 Calculated using 0.6 x (Labor + Maintenance) Calculated using 0.04 x TCI Calculated using CRF x TCI Sum of DAC + IAC Calculated using lime injection rate, 90% capture efficiency, and disposal cost Bureau of Labor Statistics, May","cited_year":"2021","cited_title":"Mean hourly wage, from, 17-3026 Industrial Engineering Technologists and Technicians [https://www.bls.gov/oes/current/oes_nat.htm]","cited_venue":null,"cited_doi":null,"cited_url":"https://www.bls.gov/oes/current/oes_nat.htm]","ref_kind":"government_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2472411,"raw_reference":"FRED, 2023. Federal Reserve Economic Data (FRED). Bank Prime Loan Rate Changes: Historical Dates of Changes and Rates. https://fred.stlouisfed.org/series/PRIME, accessed 2/3/2023 Taken from: U.S. Bureau of Economic Analysis, Section 1, \"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product\" (accessed Thursday, February 2, 2023). https://apps.bea.gov/iTable/?reqid=19&step=2&isuri=1&categories=surveyInteractive Data Application https://www.regulations.gov/document/EPA-HQ-OAR-2002-0083-1095. Appendix E page E-3; pdf page 66","cited_authors":"FRED","cited_year":"2023","cited_title":"Table 1.1.9. Implicit Price Deflators for Gross Domestic Product","cited_venue":null,"cited_doi":null,"cited_url":"https://fred.stlouisfed.org/series/PRIME","ref_kind":"dataset","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}