Policy Replication

GPAC Transcripts

Docket document2023-09-01 · PHMSA · other · PHMSA-2011-0023-0660
RIN 2137-AE72, RIN 2137-AF39, RIN 2137-AF38 · Docket PHMSA-2011-0023

Other documents for the same rulemaking

2011-08-25 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines
2011-09-19 Docket documentThe Interstate Natural Gas Association of America and the American Gas Association - Request
2011-09-28 Docket documentTexas Pipeline Association - Request for Extension
2011-09-28 Docket documentInterstate Natural Gas Association of America's & American Gas Association's
2011-11-16 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines
2011-12-27 Docket documentInterstate Natural Gas Association of America - Letter
2012-01-31 Docket documentStephen and Tina Henning - Comments
2012-02-10 Docket documentINGAA ANPRM Safety of Gas Transmission Pipelines Webinar
2012-10-10 Docket documentU.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines
2012-11-02 Docket documentAmerican Petroleum Institute - Comment
2016-04-07 Docket documentSupporting Document forGas Transmission for NPRM
2016-04-08 Federal RegisterPipeline Safety: Safety of Gas Transmission and Gathering Pipelines
2016-04-11 Docket documentNational Association of Pipeline Safety Representatives Request for Extension- NAPSR 4-8-2016 Sub
2016-04-19 Docket documentCONSOL Energy Inc. Letter - Extension Request U.S DOT PipelineSafety 04192016
2016-05-03 Docket documentSouthwest Gas Corporation - Request for Extension of Comment Period
2016-05-03 Docket documentPennsylvania Public Utility Commission - Request for Extension of Comment Period
2016-05-10 Docket documentAGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period
2016-05-10 Docket documentNew York State of Opportunity Department of Public Service - Extenson of Time Request
2016-05-10 Docket documentMarcellus Shale Coalitition - Extension Request
2016-05-13 Federal RegisterPipeline Safety: Safety of Gas Transmission and Gathering Pipelines
2016-06-09 Docket documentU.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5
2016-06-27 Docket documentNAPSR - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted
2016-07-12 Docket documentSafety of Gas Trans Appendix
2016-07-26 Docket documentU.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC
2017-03-24 Docket documentU.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition
2017-04-21 Docket documentThe Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation
2017-12-01 Docket documentGas Pipeline Advisory Committee Meeting
2017-12-01 Docket documentGas Pipeline Advisory Committee Meeting Pre-briefing on December 5
2018-03-08 Docket documentU.S. DOT/NHTSA - Final Report - 2017 Mitsubishi Outlander
2018-03-19 Docket documentU.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting
2018-04-16 Docket documentGPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL
2018-12-26 Docket documentGPAC- Gas Gathering Pre-brief presentation
2018-12-26 Docket documentPipeline Safety: Safety of Gas Transmission Pipelines
2019-02-15 Docket documentU.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry
2019-07-16 Docket documentGas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019
2019-07-16 Docket documentGPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting
2019-07-16 Docket documentGas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019
2019-10-01 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments
2019-10-02 Regulatory impact analysisGas Transmission Regulatory Impact Analysis
2019-10-02 Docket documentSubstantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)
2019-10-02 Docket documentFinal Regulatory Flexibility Act (RFA) Small Business
2019-10-02 Docket documentGas Transmission Final Environmental Assessment
2019-10-24 Docket documentGT Final Rule - GT GG Annual Report and Instructions
2019-10-24 Docket documentGT Final Rule - GT GG Incident Report and Instructions
2019-11-19 Docket documentSummary of Meeting with GPA Midstream on March 29, 2019
2020-03-10 Docket documentAPI Petition Grant Response Letter
2020-03-10 Docket documentAPGA Petition Grant Response Lette
2020-03-10 Docket documentAPGA Petition Grant Response Letter
2020-03-10 Docket documentAGA Petition Grant Response Letter
2020-07-06 Federal RegisterPipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration
2021-03-13 Docket documentMeeting with PST dated 2-11-21
2021-10-13 Docket documentEO12866 Meeting - Gas Gathering - API - 10.4.21
2021-10-13 Docket documentEO12866 Meeting Summary - Gas Gathering - GPA 10.5.21
2021-11-12 Docket documentNational Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29
2021-11-12 Docket documentGas Gathering Final Rule- Substantive Changes from EO12866 Review
2021-11-12 Docket documentEA Safety of Gas Gathering Pipelines Final Rule
2021-11-12 Docket documentAFPA Briefing to PHMSA 7-16-19
2021-11-14 Regulatory impact analysisFinal RIA/RFA: Safety of Gas Gathering Pipelines
2021-11-14 Docket documentFinal Gas Gathering Forms - Redlines
2021-11-14 Docket documentFinal Gas Gathering Forms and Instructions - Clean

References

Page 1Download these results: CSV · JSON
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com addition five for a given standard. just adopt a standard and any subsequent additions. federal registration requirements. We can't We're not allowed to do that per So if there's a revision, we have to go through another rule making exercise and propose and then adopt it. quick, I'd like to discuss real quick the availability issue because we have a requirement under Section -- I'm sorry. I'm going to real Regarding availability, we have a requirement actually in our statue under Section 24 of the 2011 Act to make statements available to the public for free. when, ever since the institution of that requirement. And we do that We either make it available on the internet. call a take-it take-it program where you can call us up and get access. make most of these available. if we have to, we'll get copies. (202) 234-4433 We make it available through what we We work with the SDOs to And in some cases,
research reportNot linked to a paper · refsec
So, as the great regulator in the sky once said, what a long strange trip it's been with this rulemaking. I can't believe we've had five advisory committee meetings since January of 2017. three of these since last December. And I'm looking down here, We pulled off We put forward a plan and a schedule in place soon after the December meeting to possibly get us to the point that at this meeting we could be done and completed with all the transmission proposals by March 28th. think all involved should be commended for that. I kind of remember a flashback to the very first meeting that we had back in January of 2017. believe it was Erin Kurilla from AGA at the time stood up and made a small motion or support for one of the very small proposals we have in the rule. thing, but it set a tone for us to move forward with this rule. And it was a simple proposal. And it was -- you know, it was And I And I small As Alan said, we've dealt with over (202) 234-4433
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com 400 comments on this rulemaking. variety of topics, some very, very difficult. But we are now on the precipice of possibly completing this action in short order. It deals with a We've dealt with a variety of things. We've dealt with cancellations. weather cancellations, other cancellations, we've dealt with hurricanes and the like. gotten through this process, and all should be commended. We've dealt with But we've So just, again, a recap of where we've been. get passage from the committee on the issue of the six-month grace period for reassessment intervals. Back in January of 2017 we were able to We passed a proposal related to safety features on the ILI launchers and receivers. We also passed the proposal related to seismicity, and inspections following extreme events, and management of change. And then we kind of set in process the kind of the step-by-step kind of process we were (202) 234-4433
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com going through where we would discuss topics and then resolve the issues and get that vote and move forward at the following meeting. topics of that first meeting involved corrosion control, issues -- some issues related to records and IM clarifications. And those Then in June of 2017 we were able to pass our proposals related to corrosion control, some of our record provisions, some of the IM clarifications, the MAOP exceedance proposals, and again we had another discussion but didn't pass or didn't have a vote on issues related to some additional records sections, some of the IM clarification procedures in 192.917(e)(3) and (e)(4), and one of the more significant proposals in the rulemaking regarding material documentation or material verification process in 192.607. Then in December -- which to me I think was really a turning point for this rulemaking -- we were able to get passed and get a positive vote on material documentation, which (202) 234-4433
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com was very significant. And we even began -- and to our surprise, were able to get a vote and passage on issues related to strengthening IM assessments for ICDA, SCCDA, and adding guided wave ultrasonics to Appendix F, and passage on the strengthening of assessment requirements for 192.150. Then we set in place and began a conversation on one of the more significant proposals in the rule as well on MAOP reconfirmation, and additional discussion on strengthening of assessment requirements for 192.493, 506, and 192.921. We then had a meeting on March 2nd, 2018, while the government was closed -- not to point that out, Alan -- we passed requirements, and to the committees to be commended for it, you know, over the phone, which is a challenge, some of the requirements again on strengthening IM assessments related to spike tests and ILI standards and HCA assessment requirements. But we also tackled some more meatier (202) 234-4433
research reportNot linked to a paper · refsec
Instead, PHMSA Going to slide 12 -- again just to give an idea of what we're doing here is from 2010 to November 2017, again, we've looked at reportable onshore still gas transmission (202) 234-4433
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com incidents caused by cracks or material defects. And we saw about 112 total incidents. And you can see that right now by manufacturing date there was about 71 manufactured before 1971; 21 that were manufactured 1971 or later; and then 20, year of manufacturing -- 20 did not have a year of manufacturing reported. And a breakdown by cause was 19 by stress corrosion cracking; 65 were construction defects; 28 were latent manufacturing defects. And of these incidents, 45 of them -or about 39 percent -- occurred after a postconstruction pressure test. occurred on pipe with less than a 30 percent
research reportNot linked to a paper · refsec
PHMSA estimates that the mileage is about 4,500 miles based upon reports from the 2016 annual reports. class locations will be shown on the next slide. And you can see here, based upon the 2016 operator annual reports, what we're looking at with most of the mileage being in Class 3 locations. And a breakdown by HCA and And you can see the breakdown from HCAs to non-HCAs and then the total of each one. Going to slide 17, again a PHMSA comment on this was for previously untested pipe. The statutory requirement requires that such pipe be tested if operating at a pressure exceeding 30 percent of SMYS. applicability of Section 624(a)(3) to lines with
research reportNot linked to a paper · refsec
Now, going to slide 20, the committee comments on this applicability from our December 2017 meeting. remove past crack/seam incidents from the applicability criteria, in other words strike Section 624(a)(1). Some of the members desired to The second bullet is some committee members desire to restrict the scope to segments greater than or equal to 30 percent SMYS per the original mandate for previously untested pipe. And also, based on leak before rupture concept for lower stress lines. The last bullet is other committee members supported retaining the scope proposed in the Notice of Proposed Rulemaking to address the (202) 234-4433
research reportNot linked to a paper · refsec
PHMSA also suggests changing 624(a)(2) to refer to MAOP records instead of subpart J pressure test records. would be -- are defined in 619(a) for post-code pipe; in 619(c) for grandfathered segments. This And also limiting Section And records to establish MAOP Slide 23, in light of the committee comments from the December 2017 meeting, PHMSA suggests, as I stated earlier, that the committee (202) 234-4433
research reportNot linked to a paper · refsec
MAOP greater than or equal to 30 percent of SMYS. Going to slide 25, on section 624(b), the completion date, there were no comments on that section. Going to slide 26, again this is from our December 2017 meeting. in response to the NPRM comments. suggested to the committee that we consider the following:
research reportNot linked to a paper · refsec
And, again, and lastly, would revise 624(b)(2) and (3) to refer to pipeline mileage instead of location. Slide 27, again this is from our December 2017 meeting and it's response to public Notice of Proposed Rulemaking comments.
research reportNot linked to a paper · refsec
MS. DiBIASIO: Hello. My name is Adele DiBiasio and I work for National Grid. National Grid supports a number of the proposed changes to 624. suggestion to revise 624(a)(2) to require TVC records in accordance with 619(a), which includes both paragraph 1, subparagraphs 1 and 3, or C, would in fact, as written, require segments with a valid pressure test to have their MAOP be verified if we're missing MOP records from 1965 to 1970.
research reportNot linked to a paper · refsec
MR. MAYBERRY: Okay. There was a suggestion to clarify that what we're saying was that the -- I mean, currently we're talking about it has to have a valid subpart J pressure test. But the suggestion was to make sure that that means that it's a valid pressure test, I guess just really an alteration, a valid pressure test at the time of installation. Which may have preceded, you know, prior to 1970 perhaps it would have been a pressure test but it wasn't -- you know, we didn't have subpart J at the time. pressure test. there are cases where, many perhaps, where it was a valid pressure test at the time but it may not be at the level that subpart J specifies, or a combination of subpart J and 619. It was a But I imagine that, and I believe
research reportNot linked to a paper · refsec
No, I need to Drake with Enbridge. I mean, just to be very honest, you're proposing changing subpart J. not before 1970, it's before today. current subpart J 1.1 test valid, or are we going to now come up with a new subpart J criteria today, tomorrow, next month that is a new subpart J target? The question is Is the That's really what the question is. And that's where the -- I'm just being as transparent as possible. worried J is moving around, not before the code but current code is moving around. current, the current today subpart J standard the gold standard? (202) 234-4433 I think folks are
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com and the incident involved pipe that was operating above 30 percent. It's kind of tricky, too, and you can see the fun of making policy on a national level. We're also dealing with an issue that was not addressed back when the code was first implemented in 1970 because of the impact on commerce to having operators go back and test pre-code pipe, but nonetheless I think we have a possible solution here that's up on screen to the left, the last bullet to what we have modified the language, you can see as we discussed or addressed pipe above or equal to 30 percent SMYS that we would look at the cost and benefits of including Class III and IV non-HCA pipe that is less than 30 percent SMYS. It looks like this is a good compromise that would have us look at that, and we can decide whether or not it gets included based on the results of that cost/benefit. So we'll just kick it off with that for the discussion. (202) 234-4433
research reportNot linked to a paper · refsec
MR. MCLAREN: The first one is 624.192 624(c)(1) Method 1. So we'll start out, we have about a dozen slides and these will cover both Methods 1 and 2 before our next discussion break. At the December 2017 meeting in response to public NPRM comments, PHMSA suggested the committee consider the following: Suggest revising 192.624 as indicated in the PHMSA response to PHMSA comments by revising 624(c)(1) to refer to sub-part (j) rather than 192.505(c) for the pressure test. Public comments on Method 1 pressure text included did not require spike testing for any segments for purpose of MAOP reconfirmation. A statement that the spike test is for crack (202) 234-4433
research reportNot linked to a paper · refsec
Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com utilized where appropriate in other rule sections. Committee also commented, suggesting adding language to address material documentation in 192.607 with respect to information needed for a pressure test. PHMSA suggests that the committee consider explicitly requiring that information needed to perform a successful pressure test in accordance with sub-part (j) not documented in TVC records must be verified in accordance with 192.607. On Method 2, there were no committee comments in the December 2017 meeting. In response to the public comments to the NPRM,
research reportNot linked to a paper · refsec
TVC records, as discussed in the December 2017 committee meeting.
research reportNot linked to a paper · refsec
TVC records as discussed in the December, 2017, committee meeting." For Method 2, Pressure Reduction. Bullet point 1. Increase the look-back period from 18 months to five years. Bullet Point 2. Strike the requirement in Section 192.624(c)(2)(I) to perform fracture mechanics analysis on segments that perform MAOP via Method 2, pressure reduction.
research reportNot linked to a paper · refsec