{"document":{"doc_id":160339,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"GPAC Transcripts","date":"2023-09-01","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0660","source_native_id":"PHMSA-2011-0023-0660","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":2453789,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com addition five for a given standard. just adopt a standard and any subsequent additions. federal registration requirements. We can't We're not allowed to do that per So if there's a revision, we have to go through another rule making exercise and propose and then adopt it. quick, I'd like to discuss real quick the availability issue because we have a requirement under Section -- I'm sorry. I'm going to real Regarding availability, we have a requirement actually in our statue under Section 24 of the 2011 Act to make statements available to the public for free. when, ever since the institution of that requirement. And we do that We either make it available on the internet. call a take-it take-it program where you can call us up and get access. make most of these available. if we have to, we'll get copies. (202) 234-4433 We make it available through what we We work with the SDOs to And in some cases,","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453790,"raw_reference":"So, as the great regulator in the sky once said, what a long strange trip it's been with this rulemaking. I can't believe we've had five advisory committee meetings since January of 2017. three of these since last December. And I'm looking down here, We pulled off We put forward a plan and a schedule in place soon after the December meeting to possibly get us to the point that at this meeting we could be done and completed with all the transmission proposals by March 28th. think all involved should be commended for that. I kind of remember a flashback to the very first meeting that we had back in January of 2017. believe it was Erin Kurilla from AGA at the time stood up and made a small motion or support for one of the very small proposals we have in the rule. thing, but it set a tone for us to move forward with this rule. And it was a simple proposal. And it was -- you know, it was And I And I small As Alan said, we've dealt with over (202) 234-4433","cited_authors":"So, as the great regulator in the sky once said, what a long strange trip it's been with this rulemaking. I can't believe we've had five advisory committee meetings since January of","cited_year":"2017","cited_title":"three of these since last December","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453791,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com 400 comments on this rulemaking. variety of topics, some very, very difficult. But we are now on the precipice of possibly completing this action in short order. It deals with a We've dealt with a variety of things. We've dealt with cancellations. weather cancellations, other cancellations, we've dealt with hurricanes and the like. gotten through this process, and all should be commended. We've dealt with But we've So just, again, a recap of where we've been. get passage from the committee on the issue of the six-month grace period for reassessment intervals. Back in January of 2017 we were able to We passed a proposal related to safety features on the ILI launchers and receivers. We also passed the proposal related to seismicity, and inspections following extreme events, and management of change. And then we kind of set in process the kind of the step-by-step kind of process we were (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453792,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com going through where we would discuss topics and then resolve the issues and get that vote and move forward at the following meeting. topics of that first meeting involved corrosion control, issues -- some issues related to records and IM clarifications. And those Then in June of 2017 we were able to pass our proposals related to corrosion control, some of our record provisions, some of the IM clarifications, the MAOP exceedance proposals, and again we had another discussion but didn't pass or didn't have a vote on issues related to some additional records sections, some of the IM clarification procedures in 192.917(e)(3) and (e)(4), and one of the more significant proposals in the rulemaking regarding material documentation or material verification process in 192.607. Then in December -- which to me I think was really a turning point for this rulemaking -- we were able to get passed and get a positive vote on material documentation, which (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453793,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com was very significant. And we even began -- and to our surprise, were able to get a vote and passage on issues related to strengthening IM assessments for ICDA, SCCDA, and adding guided wave ultrasonics to Appendix F, and passage on the strengthening of assessment requirements for 192.150. Then we set in place and began a conversation on one of the more significant proposals in the rule as well on MAOP reconfirmation, and additional discussion on strengthening of assessment requirements for 192.493, 506, and 192.921. We then had a meeting on March 2nd, 2018, while the government was closed -- not to point that out, Alan -- we passed requirements, and to the committees to be commended for it, you know, over the phone, which is a challenge, some of the requirements again on strengthening IM assessments related to spike tests and ILI standards and HCA assessment requirements. But we also tackled some more meatier (202) 234-4433","cited_authors":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com was very significant. And we even began -- and to our surprise, were able to get a vote and passage on issues related to strengthening IM assessments for ICDA, SCCDA, and adding guided wave ultrasonics to Appendix F, and passage on the strengthening of assessment requirements for 192.150. Then we set in place and began a conversation on one of the more significant proposals in the rule as well on MAOP reconfirmation, and additional discussion on strengthening of assessment requirements for 192.493, 506, and 192.921. We then had a meeting on March 2nd","cited_year":"2018","cited_title":"while the government was closed -- not to point that out, Alan -- we passed requirements, and to the committees to be commended for it, you know, over the phone, which is a challenge, some of the requirements again on strengthening IM assessments related to spike tests and ILI standards and HCA assessment requirements","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453794,"raw_reference":"Instead, PHMSA Going to slide 12 -- again just to give an idea of what we're doing here is from 2010 to November 2017, again, we've looked at reportable onshore still gas transmission (202) 234-4433","cited_authors":"Instead, PHMSA Going to slide 12 -- again just to give an idea of what we're doing here is from 2010 to November","cited_year":"2017","cited_title":"again, we've looked at reportable onshore still gas transmission (202) 234-4433","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453795,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com incidents caused by cracks or material defects. And we saw about 112 total incidents. And you can see that right now by manufacturing date there was about 71 manufactured before 1971; 21 that were manufactured 1971 or later; and then 20, year of manufacturing -- 20 did not have a year of manufacturing reported. And a breakdown by cause was 19 by stress corrosion cracking; 65 were construction defects; 28 were latent manufacturing defects. And of these incidents, 45 of them -or about 39 percent -- occurred after a postconstruction pressure test. occurred on pipe with less than a 30 percent","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453796,"raw_reference":"PHMSA estimates that the mileage is about 4,500 miles based upon reports from the 2016 annual reports. class locations will be shown on the next slide. And you can see here, based upon the 2016 operator annual reports, what we're looking at with most of the mileage being in Class 3 locations. And a breakdown by HCA and And you can see the breakdown from HCAs to non-HCAs and then the total of each one. Going to slide 17, again a PHMSA comment on this was for previously untested pipe. The statutory requirement requires that such pipe be tested if operating at a pressure exceeding 30 percent of SMYS. applicability of Section 624(a)(3) to lines with","cited_authors":null,"cited_year":null,"cited_title":"PHMSA estimates that the mileage is about 4,500 miles based upon reports from the 2016 annual reports","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453797,"raw_reference":"Now, going to slide 20, the committee comments on this applicability from our December 2017 meeting. remove past crack/seam incidents from the applicability criteria, in other words strike Section 624(a)(1). Some of the members desired to The second bullet is some committee members desire to restrict the scope to segments greater than or equal to 30 percent SMYS per the original mandate for previously untested pipe. And also, based on leak before rupture concept for lower stress lines. The last bullet is other committee members supported retaining the scope proposed in the Notice of Proposed Rulemaking to address the (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"Now, going to slide 20, the committee comments on this applicability from our December 2017 meeting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453798,"raw_reference":"PHMSA also suggests changing 624(a)(2) to refer to MAOP records instead of subpart J pressure test records. would be -- are defined in 619(a) for post-code pipe; in 619(c) for grandfathered segments. This And also limiting Section And records to establish MAOP Slide 23, in light of the committee comments from the December 2017 meeting, PHMSA suggests, as I stated earlier, that the committee (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"PHMSA also suggests changing 624(a)(2) to refer to MAOP records instead of subpart J pressure test records","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453799,"raw_reference":"MAOP greater than or equal to 30 percent of SMYS. Going to slide 25, on section 624(b), the completion date, there were no comments on that section. Going to slide 26, again this is from our December 2017 meeting. in response to the NPRM comments. suggested to the committee that we consider the following:","cited_authors":null,"cited_year":null,"cited_title":"MAOP greater than or equal to 30 percent of SMYS. Going to slide 25, on section 624(b), the completion date, there were no comments on that section","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453800,"raw_reference":"And, again, and lastly, would revise 624(b)(2) and (3) to refer to pipeline mileage instead of location. Slide 27, again this is from our December 2017 meeting and it's response to public Notice of Proposed Rulemaking comments.","cited_authors":null,"cited_year":null,"cited_title":"And, again, and lastly, would revise 624(b)(2) and (3) to refer to pipeline mileage instead of location","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453801,"raw_reference":"MS. DiBIASIO: Hello. My name is Adele DiBiasio and I work for National Grid. National Grid supports a number of the proposed changes to 624. suggestion to revise 624(a)(2) to require TVC records in accordance with 619(a), which includes both paragraph 1, subparagraphs 1 and 3, or C, would in fact, as written, require segments with a valid pressure test to have their MAOP be verified if we're missing MOP records from 1965 to 1970.","cited_authors":"MS. DiBIASIO: Hello. My name is Adele DiBiasio and I work for National Grid. National Grid supports a number of the proposed changes to 624. suggestion to revise 624(a)(2) to require TVC records in accordance with 619(a), which includes both paragraph 1, subparagraphs 1 and 3, or C, would in fact, as written, require segments with a valid pressure test to have their MAOP be verified if we're missing MOP records from 1965 to","cited_year":"1970","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453802,"raw_reference":"MR. MAYBERRY: Okay. There was a suggestion to clarify that what we're saying was that the -- I mean, currently we're talking about it has to have a valid subpart J pressure test. But the suggestion was to make sure that that means that it's a valid pressure test, I guess just really an alteration, a valid pressure test at the time of installation. Which may have preceded, you know, prior to 1970 perhaps it would have been a pressure test but it wasn't -- you know, we didn't have subpart J at the time. pressure test. there are cases where, many perhaps, where it was a valid pressure test at the time but it may not be at the level that subpart J specifies, or a combination of subpart J and 619. It was a But I imagine that, and I believe","cited_authors":null,"cited_year":null,"cited_title":"MR. MAYBERRY: Okay","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453803,"raw_reference":"No, I need to Drake with Enbridge. I mean, just to be very honest, you're proposing changing subpart J. not before 1970, it's before today. current subpart J 1.1 test valid, or are we going to now come up with a new subpart J criteria today, tomorrow, next month that is a new subpart J target? The question is Is the That's really what the question is. And that's where the -- I'm just being as transparent as possible. worried J is moving around, not before the code but current code is moving around. current, the current today subpart J standard the gold standard? (202) 234-4433 I think folks are","cited_authors":"No, I need to Drake with Enbridge. I mean, just to be very honest, you're proposing changing subpart J. not before","cited_year":"1970","cited_title":"it's before today","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453804,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com and the incident involved pipe that was operating above 30 percent. It's kind of tricky, too, and you can see the fun of making policy on a national level. We're also dealing with an issue that was not addressed back when the code was first implemented in 1970 because of the impact on commerce to having operators go back and test pre-code pipe, but nonetheless I think we have a possible solution here that's up on screen to the left, the last bullet to what we have modified the language, you can see as we discussed or addressed pipe above or equal to 30 percent SMYS that we would look at the cost and benefits of including Class III and IV non-HCA pipe that is less than 30 percent SMYS. It looks like this is a good compromise that would have us look at that, and we can decide whether or not it gets included based on the results of that cost/benefit. So we'll just kick it off with that for the discussion. (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453805,"raw_reference":"MR. MCLAREN: The first one is 624.192 624(c)(1) Method 1. So we'll start out, we have about a dozen slides and these will cover both Methods 1 and 2 before our next discussion break. At the December 2017 meeting in response to public NPRM comments, PHMSA suggested the committee consider the following: Suggest revising 192.624 as indicated in the PHMSA response to PHMSA comments by revising 624(c)(1) to refer to sub-part (j) rather than 192.505(c) for the pressure test. Public comments on Method 1 pressure text included did not require spike testing for any segments for purpose of MAOP reconfirmation. A statement that the spike test is for crack (202) 234-4433","cited_authors":null,"cited_year":null,"cited_title":"MR. MCLAREN: The first one is 624.192 624(c)(1) Method 1","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453806,"raw_reference":"Neal R. Gross and Co., Inc. Washington DC www.nealrgross.com utilized where appropriate in other rule sections. Committee also commented, suggesting adding language to address material documentation in 192.607 with respect to information needed for a pressure test. PHMSA suggests that the committee consider explicitly requiring that information needed to perform a successful pressure test in accordance with sub-part (j) not documented in TVC records must be verified in accordance with 192.607. On Method 2, there were no committee comments in the December 2017 meeting. In response to the public comments to the NPRM,","cited_authors":null,"cited_year":null,"cited_title":"Neal R. Gross and Co., Inc","cited_venue":null,"cited_doi":null,"cited_url":"www.nealrgross.com","ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453807,"raw_reference":"TVC records, as discussed in the December 2017 committee meeting.","cited_authors":null,"cited_year":null,"cited_title":"TVC records, as discussed in the December 2017 committee meeting","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":2453808,"raw_reference":"TVC records as discussed in the December, 2017, committee meeting.\" For Method 2, Pressure Reduction. Bullet point 1. Increase the look-back period from 18 months to five years. Bullet Point 2. Strike the requirement in Section 192.624(c)(2)(I) to perform fracture mechanics analysis on segments that perform MAOP via Method 2, pressure reduction.","cited_authors":"TVC records as discussed in the December","cited_year":"2017","cited_title":"committee meeting.\" For Method 2, Pressure Reduction","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}