Damage Case Compendium Technical Support Document, Volume IIb Part One: Potential Damage Cases - DCN SE04460
Other documents for the same rulemaking
References: 510 extracted, 0 linked to papers
Illinois, Russell J. Jacobson, with contributions by H.H. Damberger and C.B. Trask, Illinois State Geological Survey, Illinois Geologic Quadrangle Map IGQ-7, 1991, 1:24,000. Accessed Online December 2012. http://www.isgs.illinois.edu/maps-data-pub/isgs-quads/g/pdf-files/goreville.pdf Follmer and Nelson (2010): Surficial Geology of Marion Quadrangle, Williamson County, Illinois, Leon R. Follmer and W. John Nelson, Illinois State Geological Survey, Illinois Geologic Quadrangle Map IGQ
Marion-SG, 2010, 1:24,000. Accessed Online December 2012. http://www.isgs.illinois.edu/maps-data-pub/isgs-quads/m/pdf-files/marion-sg.pdf Nelson and Weibel (1996): Geology of the Lick Creek Quadrangle, Johnson, Union, and Williamson
Counties, Southern Illinois. W. John Nelson and C. Pius Weibel, Department of Natural Resources, Illinois State Geological Survey, Bulletin 103, 1996. Accessed Online December 2012. http://library.isgs.uiuc.edu/Pubs/pdfs/bulletins/bul103.pdf Gibb (1973): Planning a Domestic Groundwater Supply System, James P. Gibb, Circular 116, State of Illinois Department of Registration and Education, Illinois State Water Survey, Urbana, 1973. Accessed Online December 2012. http://webh2o.sws.uiuc.edu/pubdoc/C/ISWSC-116.pdf Visocky et al., (1983): Assessment of Public Groundwater Supplies in Illinois, A. P. Visocky, H. A.
Wehrmann, and K. W. Kim, Circular 144, State of Illinois, Illinois Institute of Natural Resources, Illinois State Water Survey, Urbana, 1980. Accessed Online December 2012. http://www.isws.illinois.edu/pubdoc/C/ISWSC-144.pdf
USDA (2009): Soil Survey of Williamson County, Illinois, United States Department of Agriculture, Natural Resources Conservation Service, in cooperation with Illinois Agricultural Experiment Station, 2009. Accessed Online December 2012. http://soildatamart.nrcs.usda.gov/manuscripts/IL199/0/Williamson_IL.pdf Kleinfelder (2013): Coal Ash Impoundment Site Assessment Final Report, Marion Power Station, Southern Illinois Power Cooperative, Marion, Illinois, Kleinfelder, Project Number 118953-5, February 28, 2013. Accessed Online April 2013. http://www.epa.gov/epawaste/nonhaz/industrial/special/fossil/surveys2/sipc_marion_final.pdf IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 PTb11. Venice Power Station, Union Electric Company/Ameren Energy – AmerenUE,
NRT (2010b) and NRT (2010c). According to AmerenUE (2010), the ash pond system was constructed in the early 1950s in conjunction with the flood levee system on the banks of the Mississippi River. The western berm (approximately 1,100 feet) of the ash ponds forms the dike that is part of the U.S. Army Corps of Engineers flood levee system. As such, it cannot be structurally compromised. The combined area of Ponds 2 and 3 is 58 acres (http://www.ameren.com/Environment/Documents/AshPondListingAER.pdf) For a general location map, see http://www.ameren.com/sites/aue/MyBusiness/UEW/Documents/AU_FactSheet.pdf IIb Potential CCR Damage Cases
EIP (2010a) counters that differences in how boron and arsenic interact with the aquifer would allow for little correlation between the two in individual samples. It also notes, and NRT (2010a) concurs (page 4), that seasonal water stage fluctuation in the Mississippi River would cause changes in the groundwater flow gradient and that during the high river stage the two offsite wells to the east could be down-gradient from the pond system. It also notes that while boron did not exceed a standard in the offsite wells, it was elevated and could indicate these wells were affected by the ash ponds.202 The contaminant plume of arsenic that exceeds Class I standards extends beyond the boron plume (up to x38 the federal MCL), 400 feet beyond the inactive impoundments. The contaminant plume of boron, that exceeds Illinois Class I (potable) groundwater standards, extends 475 feet south of the inactive impoundments.
NRT (2010d). According to EIP (2010a), several lines of evidence suggest that the ash ponds are the main source of arsenic, and that off-site monitoring wells MW8 and MW9 are not truly up-gradient (as claimed by NRT, apparently on the assumption that the dominant direction of groundwater flow is west, toward the river) and are affected by contaminants from the ash ponds: • Boron tends not to interact with aquifer solids and serves as a good indicator of the zone of influence of ash leachate on groundwater. Arsenic, on the other hand, is sensitive to redox conditions in the ash pore waters and aquifer, so a correlation between arsenic and boron in the same sample would not necessarily be expected. • In Pleistocene aquifers, groundwater containing boron concentrations greater than 0.5 mg/L can be considered affected by leachate (Schleyer et al., 1992). In MW8, the average concentration of boron in samples taken from IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 The NRT assessment concluded that boron and manganese onsite were higher than the Illinois Class I Groundwater Standards (and SMCL for manganese) and would be attributable to the coal ash ponds. The assessment also concluded that other contaminants, including arsenic, iron and TDS would not be attributable to leachate from the ash ponds; for arsenic, creosote wood treatment plants formerly located up-gradient of the monitoring wells area, cannot be excluded as potential sources.203 Evaluation against Proven Damage Criteria204 Criteria Criterion 1: Documented exceedances of primary maximum contaminant levels (MCLs) or other health-based standards measured in groundwater at sufficient distance from the waste management unit to indicate that hazardous constituents have migrated to the extent that they could cause human health concerns Criterion 2: Where a scientific study provides Evaluation Onsite groundwater data exceeded the primary EPA MCLs for arsenic and cadmium. Onsite groundwater data exceeded EPA SMCLs for iron, manganese, and TDS, as well as the Illinois Class I Groundwater Standard and EPA Child Health Advisory for boron. Offsite groundwater data exceeded the primary EPA
ICF (2010a). According to AmerenUE (2010), the three well groundwater monitoring network installed in 1996 was expanded to 17 monitoring wells: wells 7 and 7P were installed to monitor off-site impacts to the south. Wells 2, 2P and 3 are IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 In March 2010, as part of the plan for final closure of the impoundments, AmerenUE proposed final capping and a “Groundwater Management Zone” (GMZ) to contain contaminant plumes within the property, which extend 450 feet south from the impoundments, covering all boron exceedances.206
However, it does not cover the two offsite wells where arsenic exceeded the primary EPA MCL. The groundwater GMZ was approved for this site to limit recharge through the contaminants leaching to groundwater by capping the impoundments with a low permeability synthetic membrane.207 The well inventory required by IEPA and completed by Ameren confirms that there is no use of groundwater for potable or industrial uses down-gradient of the impoundments. In addition, IEPA concluded that because the area just south of the plume will be beneath the proposed I-70 bridge, virtually eliminating any potential use of the groundwater, contaminated groundwater will not be pumped to control migration. The contaminated groundwater will slowly discharge into the river by subsurface seepage. AmerenUE determined that the concentration of boron that would enter the river through seepage would be 0.0019 mg/L, which is protective of human health and aquatic life.208 At the end of October 2012, Ameren notified IEPA that it has concluded the closure of the Plant’s inactive ash pond system.209
ICF (2010) Rationale: Potential Damage. <Groundwater exceedances of the primary EPA MCLs for arsenic and cadmium, the EPA SMCL for iron, manganese, and TDS, and the Illinois Class I Groundwater Standard for boron have been found onsite. While offsite groundwater data exceeded the located near the river bank to the east, and wells 8 and 9 are located off-site on railroad property to the west. Additional wells are installed along the perimeter of the ash ponds (MW 1, 4, 5, 5P, 6), and within the basins (MW
AP-1, AP-1A, and AP-2). AmerenUE performs groundwater sampling on a quarterly basis and has submitted monitoring results to IEPA since 1996. Arsenic, barium, boron, cadmium, chromium, copper, lead, manganese, nickel, zinc, pH, and TDS have been monitored since 1996. And see NRT (2010).
See AmerenUE (2010a). For a series of technical Memoranda related to the closure plans, see http://www.ameren.com/Environment/Pages/ManagingWaste.aspx. According to Ameren (2014), a GMZ was approved on May 6, 2011.
PART I (Cases 1-32) December 2014 primary EPA MCL for arsenic, these (and other) offsite exceedances could not be directly attributed to the coal ash ponds. There are no administrative rulings or court decisions associated with the site.> References
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #10, Environmental Integrity Project, EarthJustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #10. ICF, 10/2010.
NRT (2009): Potable Well Survey, Hydrogeologic Assessment, and Modifications to the Groundwater Monitoring Program, Venice Ash Impoundment, Hennings, Brian and Hensel, Bruce, Natural Resource
Technology, Technical Memorandum No. 1, September 17, 2009. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo1.pdf
NRT (2010): Supplemental Hydrogeological Assessment, Venice Ash Ponds, Hennings, Brian and
Hensel, Bruce, Natural Resource Technology, Technical Memorandum No. 2, March 3, 2010. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo2.pdf
NRT (2010a): Boron Loading to the Mississippi River from Venice Ponds 2 and 3, Natural Resource
Technology, Technical Memorandum No. 3, Bruce Hensel, March 3, 2010. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo3.pdf
NRT (2010b): Evaluation of Closure Alternatives, Venice Ash Ponds, Natural Resource Technology, Technical Memorandum No. 4, Eric Tlachac and Bruce Hensel, March 12, 2010. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo4.pdf
NRT (2010c): Predicted Change in Percolation, Venice Ash Impoundment, Natural Resource
Technology, Technical Memorandum No. 5, Bruce Hensel, March 12, 2010. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo5.pdf
NRT (2010d): Groundwater Modeling of Venice Former Ash Ponds, Hennings, Brian and Hensel, Bruce, Natural Resource Technology, Technical Memorandum No. 6, March 12, 2010. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/tech-memo6.pdf
IEPA’s Ash Impoundment’s Strategy website (2011): Illinois Environmental Protection Agency, Ash Impoundment Strategy, AmerenUE Venice Station Ash Pond Closure. Accessed Online May 2012. http://www.epa.state.il.us/water/ash-impoundment/ameren-venice-station/index.html Schleyer et al., (1992): Schleyer, Ruprecht, Helmut Kerndorff, and Gerald Milde: Detection and Evaluation of Groundwater Contamination Caused by Waste Sites, in Suzanne Lesage and Richard E. Jackson (eds.), Groundwater Contamination and Analysis at Hazardous Waste Sites, CRC Press 273–91. IIb Potential CCR Damage Cases
NPDES permit is exempt from solid waste standards. The impoundments do not have liners or ground water monitoring. In the northern-most region of the former South Fly Ash Pond, an unlined Type III restricted waste (CCR) landfill, was constructed in 1992 on top of a closed impoundment as the facility began to process dry fly ash as well as boiler slag. In December 2002, The Indiana Department of Environmental Formed to provide electric power requirements for the Atomic Energy Commission's Portsmouth (Ohio) Area,
IKEC has been a subsidiary of Ohio Valley Electric Corporation since October, 1952. The Plant burns 14,000 tons of coal per day (4.5 million tons a year). Over 1.4 billion gallons of Ohio River water cycle through the plant daily to condense the steam and return to the river: http://www.roundaboutmadison.com/InsidePages/ArchivedArticles/2006/0706IKEC.html
IKEC (2009). IIb Potential CCR Damage Cases
AGES (2006). ‘To date’ refers to the publication date of the AGES report (June, 2006) .
GZA GeoEnvironmental (2009a), GZA GeoEnvironmental (2009b), and IKEC’s comment to the October 2011
NODA docket: EPA-HQ-RCRA-2011-0392-0289. In 2006, IKEC submitted an application to IDEM to upgrade the Type III RWS landfill to a Type I RWS landfill in conjunction with a Flue Gas Desulfurization Retrofit Project at the plant. The permit for construction and operation of the Type I RWS landfill was issued by IDEM on April 15, 2008. Since issuance of the permit, IKEC has begun constructing the Type I RWS landfill, and is now placing coal combustion residuals in Phase I, which was certified in 2010. The permit allows IKEC to maintain approximately 40 acres of Type III landfill that is capped, with the remaining cells to be developed as a Type I facility. http://www.ovec.com/News%20Release%205-11-06%20IKEC.pdf This section is from AGES (2006) and SE Technologies (1993), cited in the former study. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 EIP (2010) also notes elevated levels of iron and sulfates in onsite groundwater.218 EIP (2010) mentions that groundwater studies of the area indicate groundwater is flowing north out of the landfill where it could potentially reach Madison’s municipal wells;219 however no monitoring wells are available to confirm this. Surface water monitoring of the discharge from the impoundments has detected levels of aluminum and selenium that are above surface water standards for these contaminants, but the permit has “monitor only” requirements for these pollutants, so these levels have not triggered any enforcement action.220
IDEM claims221 that the parameters that are detected in the groundwater monitoring program are reflective of the active total chemistry of the geologic formation. Whereas the levels of manganese, magnesium, and iron exceed secondary MCLs in some events, these are the reactive phases of the formation and are expected to approach chemical equilibrium.222 IDEM concedes, however, that (CCRassociated) boron was detected at between 9 and 22 ppm in the down-gradient wells. Groundwater monitoring found elevated levels of boron, up to 18 mg/L, manganese, up to 1.9 mg/L, iron, up to 5.2 mg/L, and sulfates, up to 480 mg/L (IDEM data cited in EIP, 2010). A single arsenic exceedance value, 0.046 mg/L, is presented in EarthJustice’s comment to the proposed CCR rule, EPA-HQ-RCRA-2009-0640-6314, in Attachment 5 (an excel spreadsheet), with a footnote stating that this value postdates EIP’s (2010) report for the Clifty Creek damage case. However, in the absence of further data, it is impossible to establish what well(s) this value was measured in and whether it is an outlier.
AGES (2006) describes the culprit wells - CF-9405, CF-9406, and CF-9407, as completed and screened in alluvial deposits along the Ohio River, southwest (downgradient) of the landfill. The hydraulic conductivity (K) measured in these wells range from 1.1 x 10 -3 to 1.6 x 10-2 cm/sec, and the vertical hydraulic conductivity is even higher, on the order of 10-3 to 10-2 cm/sec. Both these horizontal and vertical K values in are reasonable for a silty sand or silty sand and gravel deposits and given the large groundwater gradient in this portion of the site. In measurements between June 1995 and 2006, sulfate, chloride and boron, signature fly ash constituents, have been detected in groundwater at these wells at the following range of concentrations: sulfate, <5 to 370 mg/L, boron, <0.05 to 17.1 mg/L, and chloride, 7.2 to 33 mg/L.
PART I (Cases 1-32) December 2014 IKEC also concedes that the down-gradient wells have detected statistical increases in boron, with (as of 2007) levels up to 13.7 mg/L. Citing a 2004 hydrogeologic report,223 IKEC claims that it is not feasible for groundwater flowing out the northern end of the landfill to affect the Madison Municipal Well Field because all groundwater from the site discharges to the Ohio River, which flows away from that Well Field.224 Also, whatever groundwater discharges into the Ohio River, it will be infinitesimally diluted.225
USWAG claims227 that the Earthjustice allegations concerning the site do not meet the standards for a proven damage case. In the case of the surface impoundment, there is no basis for the claim that wastewater discharges exceed the “applicable surface water standards” for aluminum because no numeric water quality criterion for aluminum is in effect. In the case of selenium, the water quality standards are currently in flux,228 based on IKEC’s reports about the acceptable maximum selenium concentration in undiluted discharge from any NPDES point at the site since 1995. This is not evidence of off-site damage resulting from disposal of boiler slag in the surface impoundment. The claims regarding damage In its comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0289, AGES (2006) reports on a
EIP (2010): Out of Control: Mounting Damages from Coal Ash Waste Sites, Thirty-one New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #7. The Environmental Integrity Project and EarthJustice. February 24, 2010. http://www.environmentalintegrity.org/news_reports/news_02_24_10.php
Appendix B, Case #7. ICF, 10/2010.
IKEC (2009): Ohio Valley Electric Corporation/Indiana-Kentucky Electric Corporation Response Letter to EPA’s ICR on Surface Impoundments, March 25, 2009. Accessed Online July 2012. http://www.epa.gov/epawaste/nonhaz/industrial/special/fossil/surveys/ovec-inky-clifty.pdf 30-mil PVC membrane, and underlain by a Geosynthetic Clay Liner (GCL), which consists of a sodium bentonite layer sandwiched between geotextile fabrics, as well as a leachate collection system. The new liner has a nominal hydraulic conductivity of 5x10-9 cm/sec, which meets or exceeds all applicable state requirements for a Type I RWS landfill.
PART I (Cases 1-32) December 2014 GZA GeoEnvironmental (2009a): Task 3 Dam Assessment Final Report, Clifty Creek Station West Bottom Ash Pond, Madison, Indiana, September 14, 2009. Accessed Online July 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/clifty-bot-final.pdf
GZA GeoEnvironmental (2009b): Task 3 Dam Assessment Final Report, Clifty Creek Station West South Fly Ash Pond, Madison, Indiana, September 14, 2009. Accessed Online July 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/clifty-fly-final.pdf
AGES (2006): Evaluation of Potential Risk to Supply Well Fields, Indiana-Kentucky Electric
Corporation, Clifty Creek Station, Applied Geology and Environmental Science (AGES), Inc., June 2006. Attachment 1 to EPA-HQ-RCRA-2011-0392-0289. Accessed Online November 2014. http://www.regulations.gov/#!searchResults;rpp=25;po=0;s=EPA-HQ-RCRA-2011-03920289;fp=true;ns=true
IDEM (1999): Review of HNTB Delineation Report, Madison, Indiana. Indiana Department of Environmental Management (IDEM), 1999. Attachment 2 to EPA-HQ-RCRA-2011-0392-0289. Accessed Online November 2014. http://www.regulations.gov/#!searchResults;rpp=25;po=0;s=EPA-HQ-RCRA-2011-03920289;fp=true;ns=true
IDEM (2008): Approval of Major Modification and Renewal of Solid Waste Facility Permit FP39-04, Response to Public Comments. Indiana Department of Environmental Management (IDEM), 2008. Attachment 3 to EPA-HQ-RCRA-2011-0392-0289. Accessed Online November 2014. http://www.regulations.gov/#!searchResults;rpp=25;po=0;s=EPA-HQ-RCRA-2011-03920289;fp=true;ns=true Indiana Kentucky Electric Corporation 21 v. Save the Valley Inc. (2011): Indiana Kentucky Electric