Corporation, Appellant–Petitioner, Indiana Department of Environmental Management, Party Pursuant to Ind.Code § 4–21.5–5–6(d), v. Save the Valley, Inc., Hoosier Environmental Council, Inc., and Citizens Action Coalition of Indiana, Inc., Appellees–Respondents. Court of Appeals of Indiana No. 49A02– 1011–MI–1178, August 9, 2011. Accessed Online August 2014. http://www.in.gov/oea/.../2010_OEA_21_Clifty_Creek_remanded.pdf PTb13. Lansing Station Ash Ponds and Landfill – Alliant/IPL, Lansing, Allamakee
County, Iowa Type: Landfills and Surface Impoundments. Background and Description: The Lansing Power Station was first constructed in 1948,236 with three additional generating units added subsequently.237 The Lansing Power Station is located on the west bank
Namely, Unit 1, with a generating capacity of 15 MW. According to Dewberry, LLC (2011), the expansion constituted Unit 2 in 1949 (12 MW); Unit 3 in 1957 (38
MW); and Unit 4 in 1977 (275 MW). According to plans filed with the Minnesota Public Service Commission on November 1, 2010, Alliant Energy plans to close generation Units 2 and 3 (at that time, Unit 2 was already idle): Plain Justice Today (2010). According to http://plainsjustice.org/files/IPL%20Action%20Plan%2011-1-10.pdf, IPL announced plans in 2008 to install a selective catalytic reduction (SCR) system and baghouse at Lansing Unit 4 to reduce NOx and mercury emissions, respectively (in July 2010, IPL completed the installation of both emission control systems). Finally, IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 of the Mississippi River, south of the City of Lansing, Iowa. The site contains an ash landfill238 which first received CCR around 1985, as well as a14.8-acre main ash pond (Ash Pond 1)239 and a 0.2 acre lower ash pond (Ash Pond 2),240 both unlined.241 All the waste units are currently active. Groundwater monitoring is required for the landfill but not the ponds. The plant is located in a rural area near the Mississippi River with an estimated 33 private wells within a 2 mile radius. However, no offsite monitoring data is available. According to EIP (2010a), alluvium/colluvium of varying thicknesses lies over bedrock in the area of the
IDNR on September 11, 2003, and CCR placement in the landfill started shortly thereafter. Ash Pond 1 has a total storage capacity (measured in 1999) of 474,000 cubic yards. Ash Pond 2 has a total storage capacity estimated at 2900 cubic yards (March 2009). This pond does not contain significant amounts of ash. Most of the ash settles out in Ash Pond 1; ash was excavated from Ash Pond 2 in 2002. Ash Pond 2 discharges into a channel directly connected to the Mississippi River. According to Alliant Energy (2009), both ponds were commissioned approximately in 1975. Both pond are in receipt of fly ash, bottom ash, and ‘other’ CCR-related waste [i.e., ash transport water, boiler water wash, air heater wash (fly ash), steam grade water production wastewaters, storm water runoff from landfill, plant floor drains, and boiler blowdown (steam/water)]. According to Dewberry, LLC (2011), Ash Pond 1 is periodically excavated to remove the ash for beneficial reuse and landfill. As of 2011, the adjacent landfill was estimated to be active for another 5 years.
RMT (2010), Figure 3, and SCS BT 2 letter to IDNR, October 24, 2012, Figure 1. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Advisory Level.243 The well which measured the exceedances is between the CCR landfill (to the east) and the Ash Settling Pond (to the west), so the source of contamination could be from either area.244 According to the State,245 as of the most recent annual water quality report, all down-gradient monitoring wells at this site for arsenic and the secondary contaminants were well below the MCL and the upgradient control limits. Also, the referenced arsenic exceedance was from a monitoring well that has been dry since August 2004, which likely did not yield valid or representative samples to appropriately characterize the site. However, the latest (April 2010 and November 2011) Annual Groundwater Quality Reports246 still show exceedances of SMCLs in the down gradient well MW-11R (a 2010 replacement of
MW-11) for iron (1,690 µg/L and 27,900 µg/L in 2010 and 2011, respectively)247 and manganese (3,580 µg/Land 4,950 µg/L, respectively),248 and significantly higher levels (although still within the corresponding standards) of specific conductance, barium, boron, cobalt, magnesium, and chloride in comparison to the up gradient wells. In addition, in 2011 arsenic exceeded the MCL (11.6 µg/L)249 in
MW-11R, whereas in 2010 arsenic in that well was significantly higher (2.44 µg/L) than in the up gradient and side-gradient wells, although still within the standard. Alliant Energy claims250 that arsenic groundwater test results exceeding the MCL have never been detected at any of the other monitoring wells at the CCR landfill, and these exceedances have not been observed again at MW-11 since 2004. While Alliant Energy acknowledges that a single down gradient groundwater monitoring well onsite (MW-11) had arsenic exceedances in 2002, 2003, and 2004, there has been no evidence to suggest that any groundwater contamination has extended to any off-site location.251 The sampling contractor (BT2), in their January 18, 2005 letter to IDNR conceded that during the 2004 quarterly monitoring, the groundwater elevations in MW11 twice dropped below the bottom of the well.252 They stated that “If MW11 is dry during the spring 2005 sampling event we will evaluate installing a replacement well at a deeper depth.” Because MW11 was dry during each of the sampling
EIP (2010a) presents the following data, which is derived from only three sampling events from 2002 through 2004 (“ too few to sufficiently assess trends data”): • Arsenic averages 0.0143 mg/L (1.4 times federal MCL). Maximum value is 0.023 mg/L (2.3 times MCL). • Iron averages 13.1 mg/L (43 times the SMCL). Maximum value is 28 mg/L (93 times SMCL). • Manganese averages 7.1 mg/L (142 times the SMCL). Maximum value is 10 mg/L (200 times the SMCL). • Sulfate averages 243 mg/L (almost equal to the SMCL). Maximum value is 380 mg/L (about 1.5 times SMCL).
BT2 (2009) claims that ‘based on the water level measurements collected at the site since 2001, MW6 is up gradient of the landfill site. MW4, MW5, and MW11 are down gradient of the landfill site….the site does not appear to be affected by groundwater mounding’.
EIP (2010a), however, claims that the groundwater monitoring network at the site does not appear to be designed to detect contamination that may be leaving the site. E.g., MW4 and MW5, located on the north side of the landfill, are identified as “down gradient” wells, but their data do not show significant differences from “up gradient” well MW6, and MW4 and MW5 do not appear to be in a location that would detect the migration of contaminants off-site. This observation is supported by the definition of MW4 and MW5 as ‘side-gradient’ wells (RMT, 2010). Iowa DNR comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0236.
RMT (2010), Table 3, and TRC (2011), Table 3.
EPA’s MCL for arsenic is 10µg/L. Alliant Energy’s November 14, 2011 Comment to the 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0290: http://s398369137.onlinehome.us/files/Regulation.gov/PublicSubmission/2011%2F11%2F22%2FEPA%2FFile%2F
EPA-HQ-RCRA-2011-0392-0290-7.pdf However, according to EIP (2010a) and to USWAG (EPA-HQ-RCRA-2011-0392-0211), there are no off-site monitoring wells to verify this statement. Furthermore, for the ash ponds, no groundwater monitoring is required. Based on the 2004 and 2009 Annual Water Quality Reports. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 campaigns between 2006 and 2009 (and only a minimal amount of water in the well was recorded in the February 2004, November 2004, and May 2005 samplings which, according to BT2, rendered the sampling records unreliable), a replacement well (MW-11R) was installed in 2010. Resolution/Remediation: According to EIP (2010a), IDNR required (in 2009) that MW11 be evaluated to determine why it has been difficult to obtain groundwater samples and to replace it with a waterbearing well if it continues to remain dry. A replacement well (MW-11R) was installed in 2010. Following the exceedances of arsenic, manganese and iron detected in MW-11R, IDNR required an assessment monitoring, to determine if the ash settling ponds or natural variability within the aquifer are contributing sources of the elevated constituents; if the CCR landfill is confirmed as a source, the delineation of the extent of groundwater impacts within the water table aquifer; and identification of any current or potential human health and environmental impacts due to the identified site conditions. 253 In response to IDNR requirement, IPL submitted to IDNR a Groundwater Assessment Workplan for the Lansing Power Station, including the installation of additional monitoring wells, and, for two rounds of assessment monitoring, a more comprehensive parameter list.254 There are no administrative rulings or court decisions.
IDNR (2012). The Plan was submitted in September 2012: see SCS BT2 (2012). IPL contends that existing dredge fills beneath the landfill might be the source of the contamination.
USWAG’s Comment to the 2011 NODA docket, ibid: “This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria. The on‐site groundwater data in the Reference Document is from only one monitoring well sampled annually between 2002 and 2004 (only three sampling events). No data from other wells in the monitoring well network were presented.”
Environment, Thirty-nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Environmental Integrity Project, EarthJustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #7. ICF, October 2010.
Alliant Energy (2009): Response to Request for Information Under Section l04(e) of the Comprehensive Environmental Response, Compensation, and Liability Act, Lansing Generating Station (submitted on behalf of Interstate Power & Light), March 27, 2009. Accessed Online March 2013. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys/alliant-elgs.pdf
Dewberry, LLC (2011): Coal Combustion Waste Impoundment Round 7 - Dam Assessment Final Report, Lansing Generating Station, Interstate Power and Light Company (IPL), Lansing, Iowa, Dewberry, LLC
Fairfax, Virginia, March 2011. Accessed Online March 2013. http://www.epa.gov/waste/nonhaz/industrial/special/fossil/surveys2/alliant-lansing-final.pdf
RMT (2010), Table 3, and TRC (2011), Table 3. Comment to the October 2011 NODA docket, on behalf of Interstate Power & Light Co. (EPA-HQ-RCRA-20110392-02900. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 State documents accessed at Solid Waste Database hyperlink: http://www.iowadnr.gov/waste/index.html, including: BT2 (2009): BT2 Incorporated, Annual Water Quality Report, 2009, Alliant Energy / Interstate Power and
Light, Lansing Power Station CCR Landfill. Accessed Online March 2013 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx BT2 (2008): BT2 Incorporated, Annual Water Quality Report, 2008, Alliant Energy / Interstate Power and
Light, Lansing Power Station CCR Landfill. Accessed Online March 2013 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx
RMT (2010): Annual Water Quality Report, 2010, Alliant Energy / Interstate Power and Light, Lansing Power Station CCR Landfill. Accessed Online March 2013 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx
TRC (2011): TRC Environmental Corporation Annual Water Quality Report, 2011 (November 14, 2011), Alliant Energy / Interstate Power and Light, Lansing Power Station CCR Landfill. Accessed Online March 2013 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx
IDNR (2012): Iowa Department of Natural Resources, Interstate Power and Light Company - Coal Combustion Residue Landfill, Annual Water Quality Report: a letter to Andy Johnson, IPL, July 3, 2012. Accessed Online Oct 2010 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx
SCS BT2 (2012): SCS BT2 Response to IDNR Review of Comments – Groundwater Assessment
Leat, IDNR, October 24, 2012. Accessed Online Oct 2010 through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx Plain Justice Today (2010): Alliance to Close Boilers at 7 Sites across Iowa. Plain Justice Today, November 8, 2010. Accessed Onsite August 2014. http://plainsjusticeblog.wordpress.com/2010/11/08/alliant-to-close-coal-boilers-at-7-sites-across-iowa/ PTb14. George Neal Station North Landfill, Berkshire Hathaway - MidAmerican Energy
Company, Sergeant Bluff, Woodbury County, Iowa Type: Landfill (in a former Sand and Gravel Pit) and Surface Impoundments. Background and Description: The George Neal North Energy Facility (NNEF)259 has placed coal combustion residual (CCR) into an unlined monofill since 1978. The landfill was originally permitted in According to http://www.sourcewatch.org/index.php?title=George_Neal_Station_North, the Plant’s nameplate capacity is 1,046 MW; it comprises three generating units (with in-service dates in parenthesis): 147 MW (1964), 349 MW (1972), and 550 MW (1975). It is fueled with Appalachian sub-bituminous coal from Virginia and West Virginia. According to http://www.mcilvainecompany.com/Decision_Tree/subscriber/Tree/DescriptionTextLinks/ITT%20Pumps%20in%2 0Iowa%20Power%20Plant.htm, Units 2 and 3 have pulverized coal boilers while Unit 1 consists of a cyclone-fired boiler. NNEF has a once through cooling system, drawing water from the Missouri River. According to a January 2013 Consent Decree between MidAmerican Energy and the Sierra Club, boiler one and boiler two (147 MW and IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 1997 and re-permitted in 2001.260 The landfill has two sections: a 32-acre west area, which receives mostly fly ash and a 50-acre east area, which receives other CCR. Permits for expansion are currently under review. The west area of the landfill is capped and closed while the east area of the landfill was scheduled for closing late in 2010. The Plant’s site also contains three unlined surface impoundments, covering a total of about 116 acres.261 The Plant lies in a rural area on the east bank of the Missouri River, approximately 5 miles south-southwest of Sergeant Bluff and approximately 4 miles west-northwest of
EPA-7-IA-Salix-Woodbury-NSDP-77-004 (1977) The deeper alluvial aquifer is rather high-yield. According to EPA-7-IA-Salix-Woodbury-NSDP-77-004 (1977), five, 12” diameter and 110-feet deep wells drilled in 1965 for the Terra Chemical Company adjacent to the NNEF produced 650 gallons per minute (gpm) with only two to six feet of drawdown. According to EPA-7-IA-Salix-Woodbury-NSDP-77-004 (1977), in the mid-1970s it supplied Sioux City with 28 million gallons per day from 16 wells, yielding up to 1,400 gpm per well. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 the deep aquifer from an up-gradient source. High levels of manganese, iron, and sulfate have also been found in groundwater down-gradient of the CCR monofill.266 The risk evaluation report prepared by MidAmerican Energy Company’s consultants identified no known human receptors or water wells down-gradient of the CCR Monofill. However, the report did note that the closest water wells are two wells MidAmerican Energy uses for drinking water at the NNEF. These wells were sampled four times for arsenic in 2002, but the detection limit (0.08 mg/L) was eight times higher than the current MCL, making it impossible to determine whether there were any exceedances of the
EIP (2010a) notes that some up-gradient wells, particularly in the deep aquifer, also indicate contamination by arsenic. MidAmerican Energy suggests267 that the up-gradient arsenic contamination is due to up-gradient sources of contamination, and is not CCR-related.
EIP (2010a) counters that some of the up-gradient wells are improperly classified because groundwater does flow from the monofill towards these wells due to mounding, and because the impoundments may also contribute (though this could not be confirmed as there is no monitoring data available for the impoundments).
EIP (2010a) also notes that down-gradient concentrations are on average higher than the up-gradient levels, even within the same groundwater path, indicating some of the contamination is likely from the landfill. According to both IDNR268 and MidAmerican Energy, the background levels of arsenic naturally exceed the MCL at the site. Late in 2010, a series of tests was conducted to evaluate water quality at two drinking water wells close to the power plant site. In these sites, arsenic levels were below EPA’s drinking water standards. Further review of annual groundwater quality reports for this site has identified several instances of contaminant levels being misrepresented in EIP (2010a) by failing to consider background levels, citing data outliers as current site conditions, and due to incorrect application of current upgradient control limits. According to MidAmerican,269 multiple studies have reported arsenic is a common constituent in
USGS and the IDNR (www.igsb.uiowa.edu/web apps/iastoret/, no longer accessible). In a recent groundwater study, 48 percent of the water samples from Iowa rural drinking water wells contained arsenic, with eight percent of the samples containing arsenic at levels above the USEPA maximum contaminant level (MCL) of 10.0 ppb for public water supplies (SWRL2, 2009). Mid American comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0233.
IDNR comment to the 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0236. MidAmerican Energy comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0233. E.g., University of Iowa and others’ statewide private wells studies in 2004 and 2006-2008, and IDNR 2010 study on the geochemistry of soil samples collected from across the state (Rowden, 2010). According to Table 3 of that study, using inductively coupled plasma-atomic emission spectrometry/acid dissolution (ICP40), the arsenic median concentration and standard deviation of statewide shallow soil samples are 8.40 ± 2.70 ppm, and the corresponding statewide values for deep soils are 9.50 ± 3.25 ppm. Using ICP40 or atomic absorption spectrometry (AA), the median arsenic levels in northwestern Woodbury County range between 12-13 ppm (ICP40) or between 10-12 ppm (AA) for the shallow soil samples, respectively, and between 13-14 ppm (ICP40) or between 13-15 ppm (AA) for the deep soil samples. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 Evaluation against Proven Damage Criteria271 Criteria Criterion 1: Documented exceedances of primary Evaluation Onsite groundwater data exceeded the primary EPA maximum contaminant levels (MCLs) or other
MCL for arsenic. health-based standards measured in groundwater at Onsite groundwater data exceeded EPA SMCLs for sufficient distance from the waste management unit iron, sulfate, and manganese. to indicate that hazardous constituents have No offsite groundwater data are available. migrated to the extent that they could cause human health concerns Criterion 2: Where a scientific study provides documented evidence of another type of damage to human health or the environment (e.g., ecological damage) Criterion 3: Where there has been an administrative ruling or court decision with an explicit finding of specific damage to human health or the environment None None Resolution: No enforcement action has been taken at the Neal North Generating Facility Ash Monofill. MidAmerican Energy Company submitted a risk evaluation for arsenic to IDNR in 2006, and IDNR requested more data to support the conclusion in the risk evaluation attributing the high concentrations of arsenic to off-site sources or the submission of a plan to address the arsenic plume. The George Neal Station North landfill completed construction of a new composite lined cell in 2009 and the older cells are being closed and capped.
ICF (2010a). USWAG comment to the 2011 NODA docket (EPA-HQ-RCRA-2011-0392-0211): “This case does not meet the criteria for a damage case because the allegations do not contain any documented evidence of off‐site groundwater monitoring data or off‐site groundwater monitoring data showing exceedances of specified health‐based criteria. Allegations in the Reference Document also claim damage to the Missouri River but provide no surface water sample data or scientific study to support the claim. MidAmerican tested the groundwater and surface water in various locations of the Missouri River, drinking water wells, and the drinking water systems at both George Neal Station North and George Neal Station South on August 30 and 31, 2010….. Where there were detectable levels of arsenic in the samples, they were still below the drinking water standards (i.e., MCLs) – meaning that the raw river water and raw well water at or around the two George Neal Station sites meets USEPA drinking water standards for arsenic. The actual processed drinking water at both of the sites was below detectable levels.” Reference: Test America. 2010. Analytical Reports (2) prepared for MidAmerican Energy, Sioux City, Iowa. September 3, 2010. The same information is also cited in MidAmerican Energy’s comment to the October 2011 NODA docket: EPA-HQ-RCRA-2011-0392-0233. IIb Potential CCR Damage Cases
PART I (Cases 1-32) December 2014 ICF (2010) Rationale: Potential Damage. <Groundwater exceedances of the primary EPA MCL for arsenic and the EPA SMCLs for iron, sulfate, and manganese have been found onsite. There are no administrative rulings or court decisions associated with the site.> References
Environment, Thirty-Nine New Damage Cases of Contamination from Improperly Disposed Coal Combustion Waste, Case #5, Environmental Integrity Project, Earthjustice and Sierra Club, August 26, 2010. http://www.environmentalintegrity.org/news_reports/08_26_10.php
Appendix C, Case #5. ICF, 10/2010. US EPA, Facility Registry System, Facility Detail Report, MidAmerican Energy Co Neal North. Accessed Online Oct 2010. http://oaspub.epa.gov/enviro/fii_query_dtl.disp_program_facility?p_registry_id=110001323318 State documents accessed at Solid Waste Database hyperlink at http://www.iowadnr.gov/waste/index.html MidAmerican Energy Response (2009): MidAmerican Energy Response to EPA’s Surface Impoundment Section 104(e) Request Neal North Generating Station, Sioux City, Iowa, August 31, 2009. Accessed Online May 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys/mae-neal.pdf Accessed May 2012 Dewberry & Davis (2011): Coal Combustion Waste Impoundment Round 7 - Dam Assessment Final
Davis, LLC, May 2011. Accessed Online May 2012. http://www.epa.gov/osw/nonhaz/industrial/special/fossil/surveys2/mae-gnn-final.pdf Earthjustice et al., (2008): Comments on the DOE/EPA Report Coal Combustion Waste Management at Landfills and Surface Impoundments1994-2004, Prepared in response to: US EPA, Notice of Data
MWH Annual Water Quality Report, 2009. MidAmerican Energy Company, Neal North CCR Monofill. Accessed Online Oct 2010. Through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx MidAmerican Energy, Neal Energy Center Solid Byproduct Management Plan, Sept 2009. Accessed Online Oct 2010. Through https://programs.iowadnr.gov/solidwaste/reports/DocumentDNA.aspx