PHMSA Pipeline Risk Modeling Overview of Methods and Tools for Improved Implementation
Original sourcePDF at sourceAttachment at source
Other documents for the same rulemaking
References: 34 extracted, 0 linked to papers
1. Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10, 2000.
2. Ayyub, B., A Practical Guide on Conducting Expert Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report 01-R01, 2001.
SME input should be elicited carefully to best reflect expert knowledge on risk factors. A structured process should be employed to systematically obtain estimates from SMEs. All SME estimates should include a measure of the uncertainty in the estimates and effort should be made to minimize bias in the estimates. February 1, 2020 Appendices Appendix A – Likelihood Models In qualitative models, inputs and outputs are developed as qualitative categories rather than numerical scores. In processes that use such models, the likelihood, consequence, and output risk levels are obtained by consideration of pipeline risk factors and assignment to a qualitative risk level. These models should have a defined logic for assigning risk levels. Risk levels may be assigned via an SME discussion. If so, a structured process is needed to integrate and balance the panel’s knowledge on risk factors (see section VII.D). A simplified example of the representation of qualitative results is given in Figure A-1. In the matrix shown, the different shaded regions represent areas of equivalent risk based on different combinations of likelihood and consequence. Figure A-1 Example Qualitative Model Likelihood Consequence High Medium High Medium Qualitative Risk Scale
Acton, M., Dimitriadis, K., Manns, T., Martin, S., DNV GL; McCollum, D., Potts, S., National Grid, Development of a Risk Based Asset Management Tool for Gas Transmission Pipelines, 2015.
Acton, M., Baldwin, P., Baldwin, T., BG Technology; Jager, E., NV Nederlandse Gasunie, The Development of the PIPESAFE Risk Assessment Package for Gas Transmission Pipelines, 1998.
ASME B31.8S-2004, Managing System Integrity of Gas Pipelines, 2005.
Facilities, U.S. Army Corps of Engineers, IWR Report 01-R-01, 2001.
Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10, 2000.
BSEE-2016-xxx (Draft), Probabilistic Risk Assessment Procedures Guide for Offshore Applications (DRAFT), 2016.
CAN/CSA-Z-662-15, Annex B, Oil and gas pipeline systems, Guidelines for risk assessment of pipeline systems, 2015.
CAN/CSA-Z-662-15, Annex H, Oil and gas pipeline systems, Pipeline failure records, 2015.
ISO/IEC 31010, Risk management - Risk assessment techniques, 2009.
ISO Guide 73, Risk management – Vocabulary, 2009.
ISO 31000, Risk management - Principles and guidelines, 2009.
Kaplan, S., 'Expert information' versus 'expert opinions.' Another approach to the problem of eliciting/combining/using expert knowledge in PRA, Reliability Engineering and System Safety, 35, 1992.
Koduru, S., Adianto, R., Skow., J., C-FER Technologies, Critical Review of Candidate Pipeline Risk Models, U.S. DOT / PHMSA DTPH5615T00003, 2016.
Muhlbauer, W. Pipeline Risk Management Manual, 2004.
Muhlbauer, W., Pipeline Risk Assessment: The Definitive Approach and its Role in Risk Management, 2015.
Munoz, E., and Rosenthal, M., Kiefner and Associates, Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats, U.S. DOT / PHMSA DTPH56-14-H-00004, Final Report No. 16-228, 2016.
NTSB Accident Report NTSB/PAR-11/01 PB2011-916501, Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010, 2011.
NTSB Accident Report NTSB/PAR-12/01 PB2012-916501, Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan, July 25, 2010, 2012. February 1, 2020 February 1, 2020
PHMSA F 7000-1, Accident Report – Hazardous Liquid Pipeline Systems, 2014.
PHMSA F 7100.1, Incident Report – Gas Distribution System, 2014.
PHMSA F 7100.2, Incident Report – Natural and Other Gas Transmission and Gathering Pipeline Systems, 2014.
Rosenfeld, M., Kiefner and Associates, and Fassett, R., Kleinfelder, Study of pipelines that ruptured while operating at a hoop stress below 30% SMYS, Proceedings of the 2013 Pipeline Pigging and Integrity Management conference, 2013.
Unal, R., Keating, C., Conway, B., and Chytka, T., Development Of An Expert Judgement Elicitation Methodology Using Calibration And Aggregation For Risk Analysis In Conceptual Vehicle Design, Old Dominion University 130012, NASA NCC-1-02044, 2004. U.S. DOT, Guidance on Treatment of the Economic Value of a Statistical Life (VSL) in U.S. Department of Transportation Analyses – 2016 Adjustment, 2016.
Wang, Y., and Guarascio, L., Massachusetts Institute of Technology, Dimensions of Data Quality: Toward Quality Data by Design”; IFSRC Discussion Paper #CIS-91-06, 1991. Presentations to Risk Modeling Work Group91
Brush, R., New Century Software, PODS Data Management, 3/7/2017.
LaMont, M., Integrity Plus, Pipeline Facilities Risk Management, 11/30/2016.
Stephens, M., C-FER Technologies, Methods for Probability Estimation, 8/2016.
Westrick, P., MPLX Energy Logistics, Using Data in Relative models with Respect to Decision Criteria, 3/8/2017.
White, T. and Rovella, T., PG&E, PG&E Facilities Risk Management, 11/30/2016.
Youngblood, R., Idaho National Laboratory, Bayesian analysis approaches to risk modeling, 8/2016. Other Presentations
Skow, J., C-FER Technologies, Inc., Critical Review of Candidate Pipeline Risk Models, presented at Pipeline Risk Modeling Methodologies Public Workshop92, 9/10/2015. Websites Pipeline Open Data Standard (PODS), http://pods.org. Cited presentations may be found at https://www.phmsa.dot.gov/pipeline/risk-modeling-work-group/riskmodeling-working-group-rd-documents-presentations. Presentation may be found at https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technicalresources/pipeline/risk-modeling-work-group/65711/skow-dtph56-15-t00003-final-project-presentation-05sept-2016-riskwo.pdf. February 1, 2020