{"document":{"doc_id":142902,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"PHMSA Pipeline Risk Modeling Overview of Methods and Tools for Improved Implementation","date":"2023-09-15","url":"https://www.regulations.gov/document/PHMSA-2011-0023-0741","source_native_id":"PHMSA-2011-0023-0741","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2011-0023"],"rins":["RIN 2137-AE72","RIN 2137-AF39","RIN 2137-AF38"],"related":[{"doc_id":13699,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-08-25"},{"doc_id":147048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The Interstate Natural Gas Association of America and the American Gas Association - Request","date":"2011-09-19"},{"doc_id":147046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Texas Pipeline Association - Request for Extension","date":"2011-09-28"},{"doc_id":147047,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Interstate Natural Gas Association of America's & American Gas Association's","date":"2011-09-28"},{"doc_id":13463,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2011-11-16"},{"doc_id":159842,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Interstate Natural Gas Association of America - Letter","date":"2011-12-27"},{"doc_id":159841,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Stephen and Tina Henning - Comments","date":"2012-01-31"},{"doc_id":147045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"INGAA ANPRM Safety of Gas Transmission Pipelines Webinar","date":"2012-02-10"},{"doc_id":147044,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Meeting with PHMSA and INGAA to discuss comments on Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2012-10-10"},{"doc_id":147043,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"American Petroleum Institute - Comment","date":"2012-11-02"},{"doc_id":146054,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Supporting Document forGas Transmission for NPRM","date":"2016-04-07"},{"doc_id":9906,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-04-08"},{"doc_id":160701,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"National Association of Pipeline Safety Representatives Request  for Extension- NAPSR 4-8-2016 Sub","date":"2016-04-11"},{"doc_id":159177,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"CONSOL Energy Inc. Letter  -  Extension Request U.S DOT PipelineSafety 04192016","date":"2016-04-19"},{"doc_id":160696,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Southwest Gas Corporation - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":160697,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Pennsylvania Public Utility Commission - Request for Extension of Comment Period","date":"2016-05-03"},{"doc_id":159174,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA, INGAA, API, IPAA, GPA, and APGA- Request for Extension of Comment Period","date":"2016-05-10"},{"doc_id":159175,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"New York State of Opportunity Department of Public Service - Extenson of Time Request","date":"2016-05-10"},{"doc_id":159176,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Marcellus Shale Coalitition -   Extension Request","date":"2016-05-10"},{"doc_id":9842,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule (administrative)","title":"Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines","date":"2016-05-13"},{"doc_id":146048,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Report to Congress - Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements - Pipeline Safety, Regulatory Certainty, And Job Creation Act 2011, Section 5","date":"2016-06-09"},{"doc_id":160684,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"NAPSR  - 2016 GasTrans NPRM Extension Request Ltr NAPSR 6-21-2016 Submitted","date":"2016-06-27"},{"doc_id":146046,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Safety of Gas Trans Appendix","date":"2016-07-12"},{"doc_id":146045,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S DOT/PHMSA - Comments of Peoples Natural Gas Company, LLC","date":"2016-07-26"},{"doc_id":159147,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Notes from Meeting with Pennsylvania Grade Crude Oil Coalition","date":"2017-03-24"},{"doc_id":146035,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"The  Interstate Natural Gas Association of America (INGAA) - Report - Analysis of Natural Gas Transmission Pipeline Releases and Mitigation Options for Pipeline MAOP Reconfirmation","date":"2017-04-21"},{"doc_id":146029,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting","date":"2017-12-01"},{"doc_id":146030,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-briefing on December 5","date":"2017-12-01"},{"doc_id":146028,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/NHTSA - Final Report  - 2017 Mitsubishi Outlander","date":"2018-03-08"},{"doc_id":146027,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"U.S. DOT/PHMSA - Gas Pipeline Advisory Committee Meeting","date":"2018-03-19"},{"doc_id":159135,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"GPAC-Slide Presentation Gas Rule - March 26 to 28 Mtg #5-FINAL","date":"2018-04-16"},{"doc_id":145981,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC- Gas Gathering Pre-brief presentation","date":"2018-12-26"},{"doc_id":159130,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Pipeline Safety: Safety of Gas Transmission Pipelines","date":"2018-12-26"},{"doc_id":159123,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"U.S. DOT/PHMSA - Letters - November 15, 2018, October 10, 2018, Meeting of PHMSA Personnel with Representatives of the Gathering Line Industry","date":"2019-02-15"},{"doc_id":145969,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Pre-brief June 19, 2019","date":"2019-07-16"},{"doc_id":145970,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GPAC Approved Gas Gathering Lines Vote Slides for June 25-26, 2019 Meeting","date":"2019-07-16"},{"doc_id":145971,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Gas Pipeline Advisory Committee Meeting Slides for June 25-26, 2019","date":"2019-07-16"},{"doc_id":7498,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments","date":"2019-10-01"},{"doc_id":7191,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Gas Transmission Regulatory Impact Analysis","date":"2019-10-02"},{"doc_id":129370,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Substantive Differences Between the Final Rule Submitted to OIRA on May 21, 2019, and Published in the Federal Register on October 1, 2019, pursuant to EO 12866 Sec. 6(a)(3)(E)","date":"2019-10-02"},{"doc_id":145514,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"Final Regulatory Flexibility Act (RFA) Small Business","date":"2019-10-02"},{"doc_id":145515,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Gas Transmission Final Environmental Assessment","date":"2019-10-02"},{"doc_id":145507,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Annual Report and Instructions","date":"2019-10-24"},{"doc_id":145508,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"GT Final Rule - GT GG Incident Report and Instructions","date":"2019-10-24"},{"doc_id":158708,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Summary of Meeting with GPA Midstream on March 29, 2019","date":"2019-11-19"},{"doc_id":145137,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"API Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":145138,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Lette","date":"2020-03-10"},{"doc_id":145139,"source":"docket_item","org":"PHMSA","doc_type":"report","title":"APGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":158492,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AGA Petition Grant Response Letter","date":"2020-03-10"},{"doc_id":6917,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","date":"2020-07-06"},{"doc_id":158355,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Meeting with PST  dated 2-11-21","date":"2021-03-13"},{"doc_id":158281,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting - Gas Gathering - API - 10.4.21","date":"2021-10-13"},{"doc_id":158283,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EO12866 Meeting Summary - Gas Gathering - GPA 10.5.21","date":"2021-10-13"},{"doc_id":158266,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"National Registry Notification Instructions - PHMSA F1000.2 (rev 1-2020) Clean 2021-07-29","date":"2021-11-12"},{"doc_id":158267,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"Gas Gathering Final Rule- Substantive Changes from EO12866 Review","date":"2021-11-12"},{"doc_id":158268,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"EA Safety of Gas Gathering Pipelines Final Rule","date":"2021-11-12"},{"doc_id":158269,"source":"docket_item","org":"PHMSA","doc_type":"correspondence","title":"AFPA Briefing to PHMSA 7-16-19","date":"2021-11-12"},{"doc_id":7188,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final RIA/RFA: Safety of Gas Gathering Pipelines","date":"2021-11-14"},{"doc_id":155491,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms - Redlines","date":"2021-11-14"},{"doc_id":155492,"source":"docket_item","org":"PHMSA","doc_type":"other","title":"Final Gas Gathering Forms and Instructions - Clean","date":"2021-11-14"}],"references":[{"citation_id":1561989,"raw_reference":"1. Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10, 2000.","cited_authors":"1. Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561990,"raw_reference":"2. Ayyub, B., A Practical Guide on Conducting Expert Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report 01-R01, 2001.","cited_authors":"2. Ayyub, B., A Practical Guide on Conducting Expert Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report 01-R01","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561991,"raw_reference":"SME input should be elicited carefully to best reflect expert knowledge on risk factors. A structured process should be employed to systematically obtain estimates from SMEs. All SME estimates should include a measure of the uncertainty in the estimates and effort should be made to minimize bias in the estimates. February 1, 2020 Appendices Appendix A – Likelihood Models In qualitative models, inputs and outputs are developed as qualitative categories rather than numerical scores. In processes that use such models, the likelihood, consequence, and output risk levels are obtained by consideration of pipeline risk factors and assignment to a qualitative risk level. These models should have a defined logic for assigning risk levels. Risk levels may be assigned via an SME discussion. If so, a structured process is needed to integrate and balance the panel’s knowledge on risk factors (see section VII.D). A simplified example of the representation of qualitative results is given in Figure A-1. In the matrix shown, the different shaded regions represent areas of equivalent risk based on different combinations of likelihood and consequence. Figure A-1 Example Qualitative Model Likelihood Consequence High Medium High Medium Qualitative Risk Scale","cited_authors":null,"cited_year":null,"cited_title":"SME input should be elicited carefully to best reflect expert knowledge on risk factors","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"news","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561992,"raw_reference":"Acton, M., Dimitriadis, K., Manns, T., Martin, S., DNV GL; McCollum, D., Potts, S., National Grid, Development of a Risk Based Asset Management Tool for Gas Transmission Pipelines, 2015.","cited_authors":"Acton, M., Dimitriadis, K., Manns, T., Martin, S., DNV GL; McCollum, D., Potts, S., National Grid, Development of a Risk Based Asset Management Tool for Gas Transmission Pipelines","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561993,"raw_reference":"Acton, M., Baldwin, P., Baldwin, T., BG Technology; Jager, E., NV Nederlandse Gasunie, The Development of the PIPESAFE Risk Assessment Package for Gas Transmission Pipelines, 1998.","cited_authors":"Acton, M., Baldwin, P., Baldwin, T., BG Technology; Jager, E., NV Nederlandse Gasunie, The Development of the PIPESAFE Risk Assessment Package for Gas Transmission Pipelines","cited_year":"1998","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561994,"raw_reference":"ASME B31.8S-2004, Managing System Integrity of Gas Pipelines, 2005.","cited_authors":"ASME B31.8S-2004, Managing System Integrity of Gas Pipelines","cited_year":"2005","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561995,"raw_reference":"Facilities, U.S. Army Corps of Engineers, IWR Report 01-R-01, 2001.","cited_authors":"Facilities, U.S. Army Corps of Engineers, IWR Report 01-R-01","cited_year":"2001","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561996,"raw_reference":"Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10, 2000.","cited_authors":"Ayyub, B., Methods for Expert-Opinion Elicitation of Probabilities and Consequences for Corps Facilities, U.S. Army Corps of Engineers, IWR Report -00-R-10","cited_year":"2000","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561997,"raw_reference":"BSEE-2016-xxx (Draft), Probabilistic Risk Assessment Procedures Guide for Offshore Applications (DRAFT), 2016.","cited_authors":"BSEE-2016-xxx (Draft), Probabilistic Risk Assessment Procedures Guide for Offshore Applications (DRAFT)","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561998,"raw_reference":"CAN/CSA-Z-662-15, Annex B, Oil and gas pipeline systems, Guidelines for risk assessment of pipeline systems, 2015.","cited_authors":"CAN/CSA-Z-662-15, Annex B, Oil and gas pipeline systems, Guidelines for risk assessment of pipeline systems","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1561999,"raw_reference":"CAN/CSA-Z-662-15, Annex H, Oil and gas pipeline systems, Pipeline failure records, 2015.","cited_authors":"CAN/CSA-Z-662-15, Annex H, Oil and gas pipeline systems, Pipeline failure records","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562000,"raw_reference":"ISO/IEC 31010, Risk management - Risk assessment techniques, 2009.","cited_authors":"ISO/IEC 31010, Risk management - Risk assessment techniques","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562001,"raw_reference":"ISO Guide 73, Risk management – Vocabulary, 2009.","cited_authors":"ISO Guide 73, Risk management – Vocabulary","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562002,"raw_reference":"ISO 31000, Risk management - Principles and guidelines, 2009.","cited_authors":"ISO 31000, Risk management - Principles and guidelines","cited_year":"2009","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562003,"raw_reference":"Kaplan, S., 'Expert information' versus 'expert opinions.' Another approach to the problem of eliciting/combining/using expert knowledge in PRA, Reliability Engineering and System Safety, 35, 1992.","cited_authors":"Kaplan, S., 'Expert information' versus 'expert opinions.' Another approach to the problem of eliciting/combining/using expert knowledge in PRA, Reliability Engineering and System Safety, 35","cited_year":"1992","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562004,"raw_reference":"Koduru, S., Adianto, R., Skow., J., C-FER Technologies, Critical Review of Candidate Pipeline Risk Models, U.S. DOT / PHMSA DTPH5615T00003, 2016.","cited_authors":"Koduru, S., Adianto, R., Skow., J., C-FER Technologies, Critical Review of Candidate Pipeline Risk Models, U.S. DOT / PHMSA DTPH5615T00003","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562005,"raw_reference":"Muhlbauer, W. Pipeline Risk Management Manual, 2004.","cited_authors":"Muhlbauer, W. Pipeline Risk Management Manual","cited_year":"2004","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562006,"raw_reference":"Muhlbauer, W., Pipeline Risk Assessment: The Definitive Approach and its Role in Risk Management, 2015.","cited_authors":"Muhlbauer, W., Pipeline Risk Assessment: The Definitive Approach and its Role in Risk Management","cited_year":"2015","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562007,"raw_reference":"Munoz, E., and Rosenthal, M., Kiefner and Associates, Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats, U.S. DOT / PHMSA DTPH56-14-H-00004, Final Report No. 16-228, 2016.","cited_authors":"Munoz, E., and Rosenthal, M., Kiefner and Associates, Improving Models to Consider Complex Loadings, Operational Considerations, and Interactive Threats, U.S. DOT / PHMSA DTPH56-14-H-00004, Final Report No. 16-228","cited_year":"2016","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562008,"raw_reference":"NTSB Accident Report NTSB/PAR-11/01 PB2011-916501, Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9, 2010, 2011.","cited_authors":"NTSB Accident Report NTSB/PAR-11/01 PB2011-916501, Pacific Gas and Electric Company Natural Gas Transmission Pipeline Rupture and Fire San Bruno, California September 9","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562009,"raw_reference":"NTSB Accident Report NTSB/PAR-12/01 PB2012-916501, Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan, July 25, 2010, 2012. February 1, 2020 February 1, 2020","cited_authors":"NTSB Accident Report NTSB/PAR-12/01 PB2012-916501, Enbridge Incorporated Hazardous Liquid Pipeline Rupture and Release Marshall, Michigan, July 25","cited_year":"2010","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562010,"raw_reference":"PHMSA F 7000-1, Accident Report – Hazardous Liquid Pipeline Systems, 2014.","cited_authors":"PHMSA F 7000-1, Accident Report – Hazardous Liquid Pipeline Systems","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562011,"raw_reference":"PHMSA F 7100.1, Incident Report – Gas Distribution System, 2014.","cited_authors":"PHMSA F 7100.1, Incident Report – Gas Distribution System","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562012,"raw_reference":"PHMSA F 7100.2, Incident Report – Natural and Other Gas Transmission and Gathering Pipeline Systems, 2014.","cited_authors":"PHMSA F 7100.2, Incident Report – Natural and Other Gas Transmission and Gathering Pipeline Systems","cited_year":"2014","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562013,"raw_reference":"Rosenfeld, M., Kiefner and Associates, and Fassett, R., Kleinfelder, Study of pipelines that ruptured while operating at a hoop stress below 30% SMYS, Proceedings of the 2013 Pipeline Pigging and Integrity Management conference, 2013.","cited_authors":"Rosenfeld, M., Kiefner and Associates, and Fassett, R., Kleinfelder, Study of pipelines that ruptured while operating at a hoop stress below 30% SMYS, Proceedings of the 2013 Pipeline Pigging and Integrity Management conference","cited_year":"2013","cited_title":null,"cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562014,"raw_reference":"Unal, R., Keating, C., Conway, B., and Chytka, T., Development Of An Expert Judgement Elicitation Methodology Using Calibration And Aggregation For Risk Analysis In Conceptual Vehicle Design, Old Dominion University 130012, NASA NCC-1-02044, 2004. U.S. DOT, Guidance on Treatment of the Economic Value of a Statistical Life (VSL) in U.S. Department of Transportation Analyses – 2016 Adjustment, 2016.","cited_authors":"Unal, R., Keating, C., Conway, B., and Chytka, T., Development Of An Expert Judgement Elicitation Methodology Using Calibration And Aggregation For Risk Analysis In Conceptual Vehicle Design, Old Dominion University 130012, NASA NCC-1-02044","cited_year":"2004","cited_title":"U.S. DOT, Guidance on Treatment of the Economic Value of a Statistical Life (VSL) in U.S. Department of Transportation Analyses – 2016 Adjustment, 2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562015,"raw_reference":"Wang, Y., and Guarascio, L., Massachusetts Institute of Technology, Dimensions of Data Quality: Toward Quality Data by Design”; IFSRC Discussion Paper #CIS-91-06, 1991. Presentations to Risk Modeling Work Group91","cited_authors":"Wang, Y., and Guarascio, L., Massachusetts Institute of Technology, Dimensions of Data Quality: Toward Quality Data by Design”; IFSRC Discussion Paper #CIS-91-06","cited_year":"1991","cited_title":"Presentations to Risk Modeling Work Group91","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"working_paper","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562016,"raw_reference":"Brush, R., New Century Software, PODS Data Management, 3/7/2017.","cited_authors":null,"cited_year":null,"cited_title":"Brush, R., New Century Software, PODS Data Management, 3/7/2017","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562017,"raw_reference":"LaMont, M., Integrity Plus, Pipeline Facilities Risk Management, 11/30/2016.","cited_authors":null,"cited_year":null,"cited_title":"LaMont, M., Integrity Plus, Pipeline Facilities Risk Management, 11/30/2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562018,"raw_reference":"Stephens, M., C-FER Technologies, Methods for Probability Estimation, 8/2016.","cited_authors":null,"cited_year":null,"cited_title":"Stephens, M., C-FER Technologies, Methods for Probability Estimation, 8/2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562019,"raw_reference":"Westrick, P., MPLX Energy Logistics, Using Data in Relative models with Respect to Decision Criteria, 3/8/2017.","cited_authors":null,"cited_year":null,"cited_title":"Westrick, P., MPLX Energy Logistics, Using Data in Relative models with Respect to Decision Criteria, 3/8/2017","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562020,"raw_reference":"White, T. and Rovella, T., PG&E, PG&E Facilities Risk Management, 11/30/2016.","cited_authors":null,"cited_year":null,"cited_title":"White, T. and Rovella, T., PG&E, PG&E Facilities Risk Management, 11/30/2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562021,"raw_reference":"Youngblood, R., Idaho National Laboratory, Bayesian analysis approaches to risk modeling, 8/2016. Other Presentations","cited_authors":null,"cited_year":null,"cited_title":"Youngblood, R., Idaho National Laboratory, Bayesian analysis approaches to risk modeling, 8/2016","cited_venue":null,"cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":1562022,"raw_reference":"Skow, J., C-FER Technologies, Inc., Critical Review of Candidate Pipeline Risk Models, presented at Pipeline Risk Modeling Methodologies Public Workshop92, 9/10/2015. Websites Pipeline Open Data Standard (PODS), http://pods.org. Cited presentations may be found at https://www.phmsa.dot.gov/pipeline/risk-modeling-work-group/riskmodeling-working-group-rd-documents-presentations. Presentation may be found at https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technicalresources/pipeline/risk-modeling-work-group/65711/skow-dtph56-15-t00003-final-project-presentation-05sept-2016-riskwo.pdf. February 1, 2020","cited_authors":null,"cited_year":null,"cited_title":"Skow, J., C-FER Technologies, Inc., Critical Review of Candidate Pipeline Risk Models, presented at Pipeline Risk Modeling Methodologies Public Workshop92, 9/10/2015","cited_venue":null,"cited_doi":null,"cited_url":"http://pods.org","ref_kind":"journal_article","section":"refsec","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}