Comprehensive Study to Understand Longitudinal ERW Seam Failures
Original sourcePDF at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at sourceAttachment at source
Other documents for the same rulemaking
References: 432 extracted, 0 linked to papers
65. Gawne, D. T., “Strain Aging and Carbide Precipitation in Aluminum-Killed Steels”, Materials Science and Technology, Vol. 1, The Institute of Metals, August 1985, pp 583592.
66. Tither, G. and Lavite, M., “Beneficial Stress-Strain Behavior of Moly-Columbium Steel Line Pipe”, Journal of Metals, 1975, Vol 27, pp15-23. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003
67. Rashid, M. S., “Strain Aging Kinetics of Vanadium or Titanium-Strengthened HighStrength Low-Alloy Steels”, Metallurgical Transactions A, American Society for Metals, Vol. 7A, April 1976, pp. 497-503.
68. Hundy, B. B., “The Strain Age Hardening of Mild Steel”, Metallurgia, 53, 203, May 1956, pp 203-211: see also Hundy, B. B.; “Accelerated Strain Ageing of Mild Steel”, Journal of the Iron and Steel Institute, September, 1954, pp 34-38
69. Edwards, C.A., Phillips, D. L., and Jones, H. N., “A Study of Strain Age Hardening of Mild Steel”, Journal Iron and Steel Institute, Vol. 139, 1939, pp 341-385.
71. Deiter, G. E., Mechanical Metallurgy, 3rd edition, McGraw-Hill, 1986, pp. 280-281.
72. Mack, D. J., “Young’s Modulus-Its Metallurgical Aspects”, AIME Transactions, Vol. 166, pp. 68-85, 1946.
73. Leslie, W. C., The Physical Metallurgy of Steels, McGraw-Hill, 1981, pp. 110-115. 74. Anon., “Goal is Zero Incidents,” http://www.ingaa.org/6211/11460.aspx, accessed August 2011.
75. Dobman, G. “Physical Analysis Methods of Magnetic Flux Leakage,” Research Techniques in NDT, Vol. IV, R. S. Sharp, Editor, 1980.
76. Simek, J., Ludlow, J., and Tisovec, P., “Oblique Field Magnetic Flux Leakage Inline Survey Tool: Implementation and Results,” Proc. of the 8th Int. Pipeline Conference, IPC 2010,
Calgary, September 2010. 77. Duckworth, N., and Sherstan, R., “System, Method and Program Product to Screen for Longitudinal Anomalies,” US Patent 7,899,628, March 2011.
78. Nestleroth, J. B , Bubenik, T. A., and Davis, R. J., “Circumferential Magnetic Flux Leakage,” GRI-00/0193, Gas Research Institute, 2003
Calgary, 1996. 80. Reber, K., Beller, M., Barbian, O.A., and Uzelac, N., “A New Generation of Ultrasonic Inspection Tools; How Defect Assessment Methods Influenced Design,” The Pipeline
Pigging, Integrity Assessment and Repair Conference, February 2002.
81. Alers, G., “A History of EMAT,” 27th Review of Quantitative Nondestructive Evaluations,” Am. Inst. of Physics, p 801, 2008.
Houston, February 2008. 83. Yasinko, E, Veith, P., et. al. “Platte Inspection Program Supports Alternative to Hydrostatic Testing,” Oil & Gas Journal, March 26, 2001.
84. Mead, R. “Non-Destructive Evaluation of Low-frequency Electric Resistance Welded (ERW) Pipe Utilizing Ultrasonic In-Line Inspection Technology,” Proceeding of the Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 European Conference on NDT, Berlin, 2006.
Conference, Calgary, September 2006. 86. Grimes, J., and Nunez de Alvarex, A., “Utilizing Circumferential MFL for the Detection of Linear and Axially Oriented Metal Loss Anomalies in Pipelines,” IPC2008-64275, 7th International Pipeline Conference, Calgary, September 2008. Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003
ANNEX A: TABULATED DATABASE Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Battelle September 2012 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 © 2012 Battelle Final Interim Report – Task 4.1 Compare - Contrast Analysis of Inspection Data and Failure Predictions versus Burst-Test Outcomes for ERW-Seam Defects B. N. Leis B N Leis, Consultant, Inc 517 Poe Avenue
Worthington, OH, 43085 Prepared for U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1200 New Jersey Ave., SE Washington DC 20590 Contract No. DTPH56-11-T-000003 Battelle Project No. G006084 June 23, 2013 Battelle does not engage in research for advertising, sales promotion, or endorsement of our clients' interests including raising investment capital or recommending investments decisions, or other publicity purposes, or for any use in litigation. Battelle endeavors at all times to produce work of the highest quality, consistent with our contract commitments. However, because of the research and/or experimental nature of this work the client undertakes the sole responsibility for the consequence of any use or misuse of, or inability to use, any information, apparatus, process or result obtained from Battelle, and
Battelle, its employees, officers, or Directors have no legal liability for the accuracy, adequacy, or efficacy thereof. © 2013 Battelle This publication may not be reproduced or distributed without the prior written permission of the copyright owner. Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.1
Nestleroth, J. B., Smith, J. M., and Leis, B. N., “Data on Pipe Collected: Inspection by in the Ditch Methods, In-Line Tools, and Hydrostatic Tests,” Battelle Interim Report, Subtask 2.1/2.2, US DoT Contract No. DTPH56-11-T-000003, May 31, 2013.
Beavers, J. A., “Track Record of In-Line Inspection as a Means of ERW Seam Integrity Assessment,” KAI Interim Report on Task 1.3, US DoT Contract No. DTPH56-11-T000003, November, 2012. 4. G. T., Quickel “Characterization of the Toughness of Pipe Containing Seam Defects,” DNV Interim Report on Task 2.3, US DoT Contract No. DTPH56-11-T-000003, February, 2013.
5. Leis, B. N. and Nestleroth, J. B., “Characterizing Aspects of Failure in ERW Line Pipe,” Battelle Interim Report, Subtask 2.6, US DoT Contract No. DTPH56-11-T-000003, April 25, 2013.
7. Leis, B. N., “Time-Trending and Like-Similar Analysis for ERW-Seam Failures,” Battelle Interim Report, Subtask 4.2, US DoT Contract No. DTPH56-11-T-000003, April 15, 2013. 8. http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx 9. http://www.roseninspection.net/RosenInternet/InspectionServices/ILInspection/CrackCoatin gDetection/
10. Leis, B. N., “Pipeline Axial Flaw Failure Criterion, PAFFC,” Release 4.5, delivered in conjunction with Leis, B. N., and Eiber, R. J., “Fracture Control Technology For Natural Gas Pipelines – Circa 2010”, PRCI Report Mat4-5, 2013.
11. Katz, D. Private correspondence, 28 and 29 May, 2013 12. Anon., “Specification for Line Pipe,” API Specification 5L, American Petroleum Institute,
14. Ludlow, J., “Summary of Recent Seam Assessment Performance using TDW Multiple Data Set Tools,” March 2013.
15. Harris, C., “Summary of Recent Seam Assessment Performance using TDW Multiple DataSet Tools,” Pipeline and Gas Journal, March, 2011.
17. Weber, R., “EMATS Data Analysis for TCPL’s ANR 504 Pipeline,” April, 2013.
18. Gao, M., Tandon, S., Krishnamurthy, R., Kania, R., Rosca, G., and Piazza, M, “A Comprehensive Analysis of EMAT ILI and In-Ditch SCC Inspection Technologies and their Application to Pipeline Integrity Management Programs,” Paper 20, 19th Biennial Joint Technical Meeting, Sydney, May 2013.
19. Gao, M., Tandon, S., Krishnamurthy, R., “Evaluation of EMAT Tool Performance by Battelle June 23, 2013 Comprehensive Study to Understand Longitudinal ERW Seam Failures DTPH56-11-T-000003 Task 4.1 Monitoring Industry Experience”, Paper 7, 18th Biennial Joint Technical Meeting, San
Francisco, May 2011. 20. Marr, J., Riverol, E., Weislogel, J., Tappert, S., Mann, A., Sun, J. “Validation of EMAT InLine Inspection Technology For SCC Management”, Proceedings of the 2010 International Pipeline Conference, Paper No: IPC2010-31091, Calgary, 2010.
21. Clark, E. B., Leis, B. N., and Eiber, R. J., “Integrity of Vintage Pipelines,” Battelle Final Report including seven annexes to INGAA Foundation, October 2004 (http://www.ingaa.org/cms/31/7306/43/678/6143.aspx).
22. Leis, B. N., Galliher, R. D., Sutherby, R. L., and Sahney, R., “Hydrotest Protocol for Applications Involving Lower-Toughness Steels,” International Pipeline Conference, IPC04-0665, Calgary, October 2004, pp. 23. Anon., API 1163, “Inline Inspection System Qualification Standard”, American Petroleum
Institute, 2005. 24. Anon., NTSB Safety Recommendation P-09-1, Letter Commentary dated October 27, 2009 to the PHMSA 25. Anon., http://www.ntsb.gov/news/events/2009/carmichael_ms/index.html,
Partners, LP, June 1, 2010. 27. http://www.tdwilliamson.com/en/Services/PipelineIntegrity/spiral_mfl/Pages/Home.aspx; then click the pdf link to SpirALL® Magnetic Flux Leakage Technology Flyer 28. http://www.roseninspection.net/RosenInternet/InspectionServices/ILInspection/CrackCoatin gDetection/ then click the link to RoCD2 Flyer (pdf)
Wiley-VCH, 1999. 2. Leis, B. N. and Nestleroth, J. B., “Battelle’s Experience with ERW and Flash Weld Seam Failures: Causes and Implications,” Battelle Interim Report, Subtask 1.4, US DoT Contract No. DTPH56-11-T-000003, September, 2013.
3. Kiefner, J. F. and Kolovitch, K. M., “ERW and Flash Weld Seam Failures,” KAI Interim Report on Task 1.4, , US DoT Contract No. DTPH56-11-T-000003, September, 2012
4. Scheil, M. A., Fratcher, C. E., Henry, S. L., Uecker, E. H., “Manufacture and Metallurgy of Flash-Welded Line Pipe,” The Engineering Journal, February, 1957, pp. 60-71. 5. Anon., Specification for Line Pipe: API Specification 5L, American Petroleum Institute,
Dallas, 2010. 6. Johnston, G. V., “Method And Apparatus For Butt Welding Thin Gage Tubing,” US Patent 1,388,434, 23 August, 1921.
9. Thomson, E., “Apparatus for Electric Welding,” US Patent 347,140, 10 August, 1886.
10. Thomson, E., “Method of Electric Welding,” US Patent 444,928, Jan. 20, 1891.
11. Ries, E. E., “Method of and Means for Manufacturing Metal Tubing,” US Patent 611,222, 20 September, 1898. 12. Steel & Tubes, Inc. V. General Tube Co., Circuit Court of Appeals, Third Circuit, Nos. 4750 and 4844, before Circuit Judge Davis, 3 October, 1932.
13. Parpart, O., “Electric Welding Machine,” US Patent 658,741, 25 September, 1900. 14. Gesellschaft fuer Elektrotechnische Industrie “A Method for Closing the Longitudinal Seam of Tubes using Electrical Resistance Welding,” German Patent AT 58,866D, 15 November 1912. 15. Anon., Handbook of Electric-Weld Tubing, Steel and Tubes Inc, 1934 16. Elyria Iron & Steel Co. V. Mohegan Tube Co., before Circuit Judges Hough, Manton, and
18. Johnston, G. V., (assigned to Elyria Iron & Steel Co) “Apparatus for Electrically ButtWelding Tubing,” US Patent 1.501,782, 15 July, 1924.
19. Johnston, G. V., “Electric Tube Welding Machine,” US Patent 1,652,481, 13 December, 1927. 20. Elyria Iron and Steel Company, “Improvements In and Relating to Electric Welding,” British Patent No. GB 216,203A, 21 May 1924.
21. Johnson, A. Z. and Johnson, N. A., “Apparatus for Butt-Welding Tubing,” US Patent 1,492,173, 29 April, 1924.
22. Blevins, H. G. (assigned to Republic Steel), “Method and Apparatus for Electrically Welding Pipe,” US Patent 1,982,415, 27 November, 1934.
23. Neckerman, W. M. (assigned to Republic Steel), “Apparatus for Manufacturing Electrically Welded Tubing,” US Patent 2,023,897, 10 December, 1935.