08/2024 - NUREG-1437, Volume 1, Revision 2, "Generic Environmental Impact Statement for License Renewal of Nuclear Plants" Final Report
Other documents for the same rulemaking (all, by stage)
References
NRC (U.S. Nuclear Regulatory Commission). 2015a. Biological Assessment on the Northern Long-Eared Bat (Myotis septentrionalis) and Indiana Bat (Myotis sodalis), Indian Point Nuclear Generating Units 2 and 3, Proposed License Renewal. Docket Numbers 50-247 and 50-286,
NRC (U.S. Nuclear Regulatory Commission). 2015b. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 46: Regarding Seabrook Station, Final Report. NUREG-1437, Supplement 46, Volumes 1 and 2, Washington, D.C. ADAMS Accession Nos. ML15209A575, ML15209A870.
NRC (U.S. Nuclear Regulatory Commission). 2015c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 54: Regarding Byron Station, Units 1 and 2, Final Report. NUREG-1437, Supplement 54, Washington, D.C. ADAMS Accession No. ML15196A263.
NRC (U.S. Nuclear Regulatory Commission). 2015d. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 55: Regarding Braidwood Station, Units 1 and 2, Final Report. NUREG-1437, Supplement 55, Washington, D.C. ADAMS Accession No. ML15314A814.
NRC (U.S. Nuclear Regulatory Commission). 2015e. Generic Environmental Impact Statement for License Renewal of Nuclear Plants; Supplement 52: Regarding Davis-Besse Nuclear Power Station Final Report. NUREG-1437, Supplement 52, Volume 1, Washington, D.C. ADAMS Accession No. ML15112A098.
NRC (U.S. Nuclear Regulatory Commission). 2015f. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 53: Regarding Sequoyah Nuclear Plant, Units 1 and 2, Final Report. NUREG-1437, Supplement 53, Washington, D.C. ADAMS Accession No. ML15075A438. 5-37
NUREG-1437, Revision 2 References NRC (U.S. Nuclear Regulatory Commission). 2015g. Policy Issue (Information): Analysis of Cancer Risks in Populations Near Nuclear Facilities Study. SECY-15-0104, Washington, D.C.
ADAMS Accession No. ML15141A404. NRC (U.S. Nuclear Regulatory Commission). 2016a. Final Report Supplement to the U.S. Department of Energy’s Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye
NRC (U.S. Nuclear Regulatory Commission). 2016b. Environmental Impact Statement for Combined Licenses (COLs) for Turkey Point Nuclear Plant Units 6 and 7. NUREG-2176, Volume 1, Washington, D.C. ADAMS Accession No. ML16300A104.
NRC (U.S. Nuclear Regulatory Commission). 2016c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 56: Regarding Fermi 2 Nuclear Power
NRC (U.S. Nuclear Regulatory Commission). 2016d. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 57: Regarding LaSalle County Station, Units 1 and 2, Final Report. NUREG-1437, Supplement 57. Washington, D.C. ADAMS Accession No. ML16238A029.
NRC (U.S. Nuclear Regulatory Commission). 2016e. Rulemaking Issue Notation Vote: Staff Recommendations for Rulemaking to Address Remediation of Residual Radioactivity During Operation. SECY-16-0121, Washington, D.C. ADAMS Accession No. ML16235A298.
NRC (U.S. Nuclear Regulatory Commission). 2016f. Policy Issue: Proposed Resolution of Remaining Tier 2 and 3 Recommendations Resulting from the Fukushima Dai-ichi Accident.
NRC (U.S. Nuclear Regulatory Commission). 2016g. Memorandum from A.L. Vietti-Cook to V.M. McCree, dated December 21, 2016, regarding “Staff Requirements - SECY-16-0121 - Staff Recommendations for Rulemaking to Address Remediation of Residual Radioactivity During Operation.” Washington, D.C. ADAMS Accession No. ML16356A583.
NRC (U.S. Nuclear Regulatory Commission). 2017. Memorandum to V.M. McCree from A.L. Vietti-Cook, dated May 3, 2017, regarding “Staff Requirements – SECY-16-0144 – Proposed Resolution of Remaining Tier 2 and 3 Recommendations Resulting From the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML17123A453.
NRC (U.S. Nuclear Regulatory Commission). 2018a. Biological Evaluation of Impacts to Northern Long-Eared Bat, Rufa Red Knot, Piping Plover, and Roseate Tern, Seabrook Station, Unit 1, Proposed License Renewal to Operating License No. NPF-86. Docket No. 50-443,
NRC (U.S. Nuclear Regulatory Commission). 2018c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 58: Regarding River Bend Station, Unit 1, Final Report. NUREG-1437, Supplement 58, Washington, D.C. ADAMS Accession No. ML18310A072.
NUREG-1437, Revision 2 5-38 References NRC (U.S. Nuclear Regulatory Commission). 2018d. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 59: Regarding Waterford Steam Electric
NRC (U.S. Nuclear Regulatory Commission). 2018e. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 38: Regarding Indian Point Nuclear Generating Unit Nos. 2 and 3, Final. NUREG-1437, Supplement 38, Volume 5, Washington, D.C. ADAMS Accession No. ML18107A759.
NRC (U.S. Nuclear Regulatory Commission). 2018f. Status of the Decommissioning Program 2018 Annual Report. Washington, D.C. November. ADAMS Accession No. ML18257A301.
NRC (U.S. Nuclear Regulatory Commission). 2019a. Biological Assessment of Impacts to Sea Turtles and Smalltooth Sawfish St. Lucie Plant, Unit Nos. 1 and 2 Continued Operations Under Renewed Facility Operating License Nos. DPR-67 and NPF-16. Docket Nos. 50-335 and 50-389, Rockville, MD. ADAMS Accession No. ML19093A064.
NRC (U.S. Nuclear Regulatory Commission). 2019b. Environmental Impact Statement for an Early Site Permit (ESP) at the Clinch River Nuclear Site. NUREG-2226, Washington, D.C.
ADAMS Package Accession ML19087A266. NRC (U.S. Nuclear Regulatory Commission). 2019c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating, Unit Nos. 3 and 4, Final Report. NUREG-1437, Supplement 5, Second Renewal, Washington, D.C. ADAMS Accession No. ML19290H346.
NRC (U.S. Nuclear Regulatory Commission). 2019e. “Greater-Than-Class C and Transuranic Waste.” Washington, D.C. ADAMS Accession No. ML21145A383.
NRC (U.S. Nuclear Regulatory Commission). 2019f. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and other Facilities 2017, Fiftieth Annual Report.
NRC (U.S. Nuclear Regulatory Commission). 2020b. “Biological Opinion for Oyster Creek Generating Station Shutdown and Decommissioning.” Washington, D.C. ADAMS Accession No. ML20153A226.
NRC (U.S. Nuclear Regulatory Commission). 2020d. Letter from NRC to J.M. Welsch at Pacific Gas and Electric Company, dated May 8, 2020, regarding “Diablo Canyon Power Plant, Unit Nos. 1 and 2 – Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident.” Washington, D.C. ADAMS Accession No. ML20093B934.
NRC (U.S. Nuclear Regulatory Commission). 2020f. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2, Final Report.
NUREG-1437, Revision 2 References NRC (U.S. Nuclear Regulatory Commission). 2020g. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station, Units 2 and 3, Final Report. NUREG-1437, Supplement 10, Second Renewal, Washington, D.C. ADAMS Accession No. ML20023A937.
NRC (U.S. Nuclear Regulatory Commission). 2020h. “Low-Level Waste Disposal.” Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/waste/llw-disposal.htm.
NRC (U.S. Nuclear Regulatory Commission). 2020i. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2018, Fifty-First Annual Report.
NRC (U.S. Nuclear Regulatory Commission). 2020j. “Public Scoping Meeting to Discuss the Review and Potential Update of NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants - Final Report (LR GEIS).” August 27, 2020, Webinar Corrected Transcript, Washington, D.C. ADAMS Package Accession No. ML20296A250.
NRC (U.S. Nuclear Regulatory Commission). 2020k. “Typical Dry Cask Storage System.”
Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/waste/spent-fuelstorage/diagram-typical-dry-cask-system.html.
NRC (U.S. Nuclear Regulatory Commission). 2020l. “Licensing Process.” Washington, D.C. Accessed May 5, 2023, at https://www.nrc.gov/waste/hlw-disposal/licensingprocess.html#background.
NRC (U.S. Nuclear Regulatory Commission). 2020m. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 6, Second Renewal: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2, Final Report.
NRC (U.S. Nuclear Regulatory Commission). 2021a. LaSalle County Station, Units 1 and 2, Environmental Assessment and Finding of No Significant Impact Related to a Requested Revise the Ultimate Heat Sink Technical Specifications. NRC-2021-0034. U.S. Nuclear Regulatory Commission, Washington, D.C. ADAMS Accession No. ML21008A328.
NRC (U.S. Nuclear Regulatory Commission). 2021b. Letter from J.S. Wiebe, Senior Project
Manager, to D.P. Rhoades, Senior Vice President, Exelon Generation Company, LLC dated June 30, 2021, regarding “Braidwood Station, Units 1 and 2 - Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature.” EPID: L-2021-LLA-0095. Washington, D.C. ADAMS Accession No. ML21008A328.
NRC (U.S. Nuclear Regulatory Commission). 2021d. “Appendix B to Part 20—Annual Limits on Intake (ALIs) and Derived Air Concentrations (DACs) of Radionuclides for Occupational Exposure; Effluent Concentrations; Concentrations for Release to Sewerage.” Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/reading-rm/doc-collections/cfr/part020/part020appb.html.
NUREG-1437, Revision 2 5-40 References NRC (U.S. Nuclear Regulatory Commission). 2021e. Environmental Impact Statement Scoping Process Summary Report Review and Update of the Generic Environmental Impact Statement for License Renewal of Nuclear Plants. NUREG-1437, Rockville, MD. ADAMS Accession No. ML21039A576.
NRC (U.S. Nuclear Regulatory Commission). 2021f. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 23: Second Renewal Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2, Draft Report for Comment. NUREG-1437, Supplement 23, Second Renewal, Washington, D.C. ADAMS Accession No. ML21306A226.
NRC (U.S. Nuclear Regulatory Commission). 2021g. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 7, Second Renewal: Regarding Subsequent License Renewal for North Anna Power Station, Units 1 and 2, Draft Report for Comment. NUREG-1437, Supplement 7, Second Renewal, Washington, D.C. ADAMS Accession No. ML21228A084.
NRC (U.S. Nuclear Regulatory Commission). 2021h. Letter from S.R. Helton to J.D. Isakson, dated September 13, 2021, regarding “Issuance of Materials License No. SNM-2515 for the
NRC (U.S. Nuclear Regulatory Commission). 2021j. List of Leaks and Spills at Operating U.S.
Commercial Nuclear Power Plants October, 2021. Washington, D.C. ADAMS Accession No. ML21278A082.
NRC (U.S. Nuclear Regulatory Commission). 2021k. “Plant Sites with Licensed Radioactive Material in Groundwater.” Washington, D.C. Accessed April 25, 2023, at https://www.nrc.gov/reactors/operating/ops-experience/tritium/sites-grndwtr-contam.html.
NRC (U.S. Nuclear Regulatory Commission). 2021l. Policy Issue Notation Vote: Rulemaking Plan For Renewing Nuclear Power Plant Operating Licenses – Environmental Review (RIN 3150-AK32; NRC-2018-0296). SECY-21-0066, Washington, D.C. ADAMS Accession No. ML20364A007.
NRC (U.S. Nuclear Regulatory Commission). 2021m. “Power Reactor Status Report for August 24, 2014.” Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/reading-rm/doccollections/event-status/reactor-status/2014/20140824ps.html.
NRC (U.S. Nuclear Regulatory Commission). 2021n. “Power Reactor Status Report for August 28, 2018. “Washington, D.C. Accessed May 1, 2023, at https://www.nrc.gov/reading-rm/doccollections/event-status/reactor-status/2018/20180828ps.html.