09/2014 - NUREG-2157 Vol 1, "Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel: Final Report."
Other documents for the same rulemaking (all, by stage)
References
NRC (U.S. Nuclear Regulatory Commission). 1989. Regulatory Analysis for the Resolution of Generic Issue 82, “Beyond Design Basis Accidents in Spent Fuel Pools.” NUREG–
NRC (U.S. Nuclear Regulatory Commission). 1990. Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants. NUREG–9ROXPH:DVKLQJWRQ'&$FFHVVLRQ No. ML120960691.
NRC (U.S. Nuclear Regulatory Commission). 1994. Revised Livermore Seismic Hazard Estimates for Sixty-Nine Nuclear Power Plant Sites East of the Rocky Mountains.
NRC (U.S. Nuclear Regulatory Commission). 1996. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. NUREG–:DVKLQJWRQ'&$YDLODEOHDW http://www.nrc.gov/reading-rm/doc-FROOHFWLRQVQXUHJVVWDIIVU.
NRC (U.S. Nuclear Regulatory Commission). Regulatory Analysis Technical Evaluation Handbook. NUREG/BR–:DVKLQJWRQ'&$FFHVVLRQ1R0/ 185(* F-20 September 2014 Appendix F
NRC (U.S. Nuclear Regulatory Commission). 2001. Technical Study of Spent Nuclear Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants. NUREG–:DVKLQJWRQ D.C. Accession No. ML010430066.
NRC (U.S. Nuclear Regulatory Commission). 2002. Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 6 Regarding Surry Power Station, Units 1 and 2. NUREG–6XSSOHPHQW:DVKLQJWRQ'&$FFHVVLRQ1R0/
NRC (U.S. Nuclear Regulatory Commission). 2012a. State-of-the-Art Reactor Consequence Analyses (SOARCA) Report. NUREG– :DVKLQJWRQ'&$FFHVVLRQ1R0/$
NRC (U.S. Nuclear Regulatory Commission). 2012b. Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident.
NRC (U.S. Nuclear Regulatory Commission). 2012c. Issuance of Order to Modify Licenses with Regard to Requirement for Mitigation Strategies for Beyond-Design-Basis External Events.
NRC (U.S. Nuclear Regulatory Commission). 2012d. Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. EA–12–15&–2012– :DVKLQJWRQ'&$FFHVVLRQ1R0/$
NRC (U.S. Nuclear Regulatory Commission). 2013a. Consequence Study of a Beyond-DesignBasis Earthquake Affecting the Spent Fuel Pool for a U.S. Mark I Boiling Water Reactor.
NRC (U.S. Nuclear Regulatory Commission). 2013b. Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel. COMSECY–13– 0030, Washington, D.C. Accession No. ML13329A918.
NRC (U.S. Nuclear Regulatory Commission). 2013c. Generic Environmental Impact Statement for License Renewal of Nuclear Plants. NUREG–5HYLVLRQ Washington, D.C. Accession No. 0/$.
NRC (U.S. Nuclear Regulatory Commission). 2014. Memorandum from R.C. Bavol to M.A.
Atorius, dated May 23, 2014, “Staff Requirements—COMSECY–13–0030—Staff Evaluation and Recommendation for Japan Lessons-Learned Tier 3 Issue on Expedited Transfer of Spent Fuel.” Washington, D.C. Accession No. ML14143A360. September 2014 F-21 185(* Appendix F
NUREG/CR–, Brookhaven National Laboratory, Upton, New York. Accession No. ML082260098. 185(* F-22 September 2014 Appendix G Spent Fuel Storage Facilities Appendix G Spent Fuel Storage Facilities This appendix provides summary information concerning spent nuclear fuel (spent fuel) pools and independent spent fuel storage installations (ISFSIs), which are located primarily at operating commercial power reactors and decommissioned reactor sites. Table G-1 through Table G-3 provide information about spent fuel pools. Specifically, Table G-1 lists operating reactors and the capacities of their spent fuel pools. Capacities at single-unit
CENG. 2010. Letter from T.L. Harding to NRC, dated September 16, 2010, regarding “General License 30-day Cask Registration Notification.” Ontario, New York. Accession No. 0/
Commonwealth Edison. 1993. Zion Station Updated Final Safety Analysis Report. Volume 3, &KLFDJR,OOLQRLV$FFHVVLRQ1R0/.
Commonwealth Edison. 1998. Letter from R.S. Starkey to NRC, dated November 10, 1998, regarding “Submittal of Defueled Safety Analysis Report.” Chicago, Illinois. Accession No. ML1$ Dairyland (Dairyland Power Cooperative). 2012. Letter from J.B. McRill to NRC, dated July 12, 2012, regarding “Registration of Spent Fuel Dry Storage Cask in Use.” LAC–*HQRD Wisconsin. Accession No. ML12199A069.
DOE (U.S. Department oI(QHUJ\ /HWWHUIURP%-'DYLVWR15&, GDWHG0DUFK UHJDUGLQJ³6XEPLWWDORI7KUHH0LOH,VODQG8QLW,QGHSHQGHQW6SHQW)XHO6WRUDJH Installation (TMI–,6)6, 8SGDWH5HSRUWV 'RFNHW–20).” EM–FMDP––008, Idaho Falls, Idaho. AccessiRQ1R0/ Dominion (Dominion Energy Kewaunee, Inc.). 2013. Letter from D.G. Stoddard to NRC, dated May 14, 2013, regarding “Dominion Energy Kewaunee, Inc., Kewaunee Power Station Certification of Permanent Removal of Fuel from Reactor Vessel.” Serial No. 13–293, Glen
Allen, Virginia. Accession No. ML13$ . Dominion (Dominion Nuclear Connecticut, Inc.). 2011. Millstone Power Station Unit 1 Defueled Safety Analysis Report. Revision 8.0, Waterford, Connecticut. Accession No. ML11231A618. 185(* G-16 September 2014 Appendix G Duke (Duke Energy). 2013. Letter from J.A. Franke to NRC, dated February 20, 2013, regarding “Crystal River Unit 3—Certification of Permanent Cessation of Power Operations and that Fuel Has Been Permanently Removed from the Reactor.” 3F0213–&U\VWDORiver, Florida. Accession No. 0/$ Entergy (Entergy Nuclear Operations, Inc.). 2013. Letter from M. Perito to NRC, dated September 23, 2013, regarding “Notification of Permanent Cessation of Power Operations.” White Plains, New York. Accession 1R0/$ FirstEnergy (First Energy Nuclear Operating Company). 2012. Letter from H.D. Hanson, Jr. to
NRC, dated October 23, 2012, regarding “Spent Fuel Storage Cask Registration.” L–12–383,
Perry, Ohio. Accession No. ML12310A088. Greene, S.R., J.S. Medford, and S.A. Macy. 2013. Storage and Transport Cask Data for Used Commercial Nuclear Fuel—2013 U.S. Edition. ATI-TR-Knoxville, Tennessee. Available at http://curie.ornl.gov/content/storage-and-transport-cask-data-used-commercial-nuclear-fuel2013-us-edition-0. National Environmental Policy Act of 1969 (NEPA), as amended. 42 USC 4321 et seq.
NRC (U.S. Nuclear Regulatory Commission). 2004. Letter from J. Monninger to J.E. Ellis, dated December 21, 2004, regarding “Issuance of Renewed Materials License No. SNM– Morris Operation Independent Spent Fuel Storage Operation.” TAC No. L23091, Washington, D.C. Accession No. ML043630433.
NRC (U.S. Nuclear Regulatory Commission). 2006. Letter from W.H. Ruland to J.D. Parkyn, dated February 21, 2006, regarding “Issuance of Materials License No. SNM–IRUWKH Private Fuel Storage Facility (TAC No. L23821).” Washington, D.C. Accession No. 0/
NRC (U.S. Nuclear Regulatory Commission). 2013a. 2013-2014 Information Digest. NUREG– 9ROXPH:DVKLQJWRQ'& $FFHVVLRQ1R0/$.
NRC (U.S. Nuclear Regulatory Commission). 2013b. Directory of Certificates of Compliance for Radioactive Materials Packages. NUREG-0383, Volume 2, Revision 28, Washington, D.C. Accession No. ML13309A031.
NRC (U.S. Nuclear Regulatory Commission). 2014a. “Operating Reactors.” Washington, D.C. Available at http://www.nrc.gov/reactors/operating/list-power-reactor-units.html.
NRC (U.S. Nuclear Regulatory Commission). 2014b. “Combined License Applications for New Reactors.” Washington, D.C. Available at http://www.nrc.gov/reactors/new-reactors/col.html. September 2014 G- 185(* Appendix G
NRC (U.S. Nuclear Regulatory Commission). 2014c. “Watts Bar Unit 2 Reactivation.” Washington. D.C. Available at http://www.nrc.gov/info-finder/reactor/wb/watts-bar.html.
NRC (U.S. Nuclear Regulatory Commission). 2014d. “Power Reactor Sites Undergoing Decommissioning.” Washington, D.C. Available at http://www.nrc.gov/infofinder/decommissioning/.
Progress Energy. 2010. Letter from P.N. Mentel to NRC, dated November 18, 2010, regarding “Registration and Use of Casks to Store Spent Fuel and System Thermal Performance Assessment.” BSEP 10–6RXWKSRUW1RUWK&DUROLQD$FFHVVLRQ1R0/
SCE (Southern California Edison). 2013. Letter from P. Dietrich to NRC, dated June 12, 2013, regarding “Certification of Permanent Cessation of Power Operations, San Onofre Nuclear Generating Station Units 2 and 3.” San Clemente, California. Accession No. ML131640201. UxC (8[&RQVXOWLQJ&RPSDQ\//& ³2YHU'U\6WRUDJH6\VWHPV'HSOR\HGLQWKH
US.” StoreFUEL 4–, Roswell, Georgia. 185(* G-18 September 2014 Appendix H Estimated Costs of Alternatives Appendix H Estimated Costs of Alternatives This appendix provides the cost information upon which the U.S. Nuclear Regulatory Commission (NRC) EDVHVWKHFRVWSRUWLRQRILWVFRVWVDQGEHQHILWVDQDO\VLVLQ&KDSWHURIWKLV Generic Environmental Impact Statement for Continued Storage of Spent Nuclear Fuel (GEIS). Tables H-1 through H-3 provide the estimated costs of site-specific licensing reviews for new reactors, reactor license renewals, and independent spent fuel storage installations (ISFSI), respectively, which are applicable to the NRC’s potential options in case of no action. Table H-4 provides estimated costs for generic elements of the proposed action, as well as the NRC’s potential options in case of no action, including costs for development of the GEIS, rulemaking, and a policy statement, as applicable. Finally, Table H-SURYLGHVWKHWRWDOHVWLPDWHGFRVWVIRU the proposed action and the NRC’s options in case of no action. September 2014 185(* 185(* First review Existing review with supplement 10 CFR 3DUWUHYLHZZLWKVXSSOHPHQW Existing review with supplement Existing review with supplement New review Activity(d) Number $1,60,000 $981,000 $49,800 $232,000
NRC Cost $17,700,000 $3,290,000 $3,930,000 $4,000 $ 0,000 $3,930,000 $199,000 Constant 2014 $1,60,000 $981,000 $49,800 $232,000 Licensee Cost(b) $16,800,000 $3,200,000 $3,810,000 $1,000 0,000 $ ,000 $,000 3% Discount $3,290,000 $1,960,000 $99,600 $4,000 Total Cost(c) $15,700,000 $3,080,000 $3,0,000 $434,000 $,140,000 $3,200,000 $1,000 7% Discount (a) $VGHVFULEHGLQ&KDSWHUWKH15&HVWLPDWHVWKDWIRUQHZUHDFWRUUHYLHZVXQGHU&)53DUW the first site-specific review of continued storage in a new reactor environmental impact statement (EIS) would require approximately 3.9 full-time equivalents (FTE) for NRC and $1 million in contractor support. The NRC estimates that subsequent site-specific reviews that require supplementation of existing EISs require approximately 2.9 FTE for
RSHUDWLQJOLFHQVHXQGHU&)53DUWZLOOUHTXLUH)7(, or $232,000. (b) The NRC assumes that licensees incur costs that are equal to those incurred by the NRC, so the total cost is double the NRC’s costs. (c) Because of rounding, some costs may not appear to sum correctly. (d) The NRC assumes that Levy, South Texas Project (Units 3 and 4), Comanche Peak (Units 3 and 4), Calvert Cliffs, Fermi (Unit 3), North Anna, Lee, and the PSE&G Power, LLC/PSE&G Nuclear, LLC Early Site Permit EISs all will require supplementation. One of these reviews will be the first review, and the others are labeled as existing reviews with supplements. Watts Bar 2 is the &)53DUWUHYLHZZLWKVXSSOHPHQWDWLRQ7KH15& treats Turkey Point and Bell Bend as new reviews because the NRC is not likely to issue a draft EIS for either project by the end of fiscal year 2014; the NRC assumes that the environmental impacts of continued storage will be addressed within a normal review schedule for those projects. Sum(c) 2016 2018 Year First review Existing review with supplement New review Title 10 of the Code of Federal Regulations &)5 3DUWUHYLHZZLWKVXSSOHPHQW Cost per Activity(a) Table H-1. Estimated Site-Specific Costs for New Reactor Reviews Appendix H September 2014 Year 2016
BLS (U.S. Bureau of Labor Statistics). 2014. CPI Detailed Report—Data for March 2014.
Washington, D.C. Available at http://www.bls.gov/cpi/cpid1403.pdf. 185(* September 2014 Appendix I High-Burnup Fuel Appendix I High-Burnup Fuel During the public comment period on the draft Generic Environmental Impact Statement (GEIS), the U.S. Nuclear Regulatory Commission (NRC) held 13 public meetings in various locations throughout the United States. During those meetings, numerous questions, concerns, and comments were raised about the use of high-burnup fuel at nuclear power plants. As a result of the public’s interest in this topic, the NRC developed this appendix to provide background information about high-burnup fuel. The material is presented in a question and answer format. Q. What does “burnup” mean? A. Burnup is a measure of the fraction of fissionable atoms that can undergo the fission process. It can be expressed as a measure of the time a fuel assembly stays in the reactor core and how much energy is extracted from that nuclear fuel assembly. Burnup is typically expressed in units of gigawatt-days per metric ton of the initial amount of the uranium in the fuel (GWd/MTU). Q. What is high-burnup fuel and how does it differ from low-burnup fuel? A. High-burnup fuel is typically defined as fuel with a burnup (a measure of the time a fuel
Hanson, B., H. Alsaed, C. Stockman, D. Enos, R. Meyer, and K. Sorenson. 2012. Gap Analysis to Support Extended Storage of Used Nuclear Fuel Rev. 0. U.S. Department of Energy Report No. FCRD-USED-2011-000136 Rev. 0, Richland, Washington. Available at http://energy.gov/sites/prod/files/Gap%20Analysis%20Rev%200%20Final.pdf. September 2014 185(* Appendix I
IAEA (International Atomic Energy Agency). 2011. Impact of High Burnup Uranium Oxide and Mixed Uranium–Plutonium Oxide Water Reactor Fuel on Spent Fuel Management. IAEA Nuclear Energy Series No. NF-T-3.8, Vienna, Austria. Available at http://wwwpub.iaea.org/MTCD/Publications/PDF/Pub1490_web.pdf. National Environmental Policy Act of 1969 (NEPA), as amended. 42 USC 4321 et seq.
NRC (U.S. Nuclear Regulatory Commission). 2012. Identification and Prioritization of the Technical Information Needs Affecting Potential Regulation of Extended Storage and Transportation of Spent Nuclear Fuel: Draft Report for Comment. Washington, D.C. Accession 1R0/
Daling, and R.T. Dahowski. 2001. Environmental Effects of Extending Fuel Burnup Above 60 GWd/MTU. NUREG/CR-, Pacific Northwest National Laboratory, Richland, Washington. Accession No. ML010310298.
Sindelar, R.L., A.J. Duncan, M.E. Dupont, P.-S. Lam, M.R. Louthan, Jr., and T.E. Skidmore. 2011. Materials Aging Issues and Aging Management for Extended Storage and Transportation of Spent Nuclear Fuel. NUREG/CR–Savannah River National Laboratory, Aiken, South Carolina. Accession No. ML11321A182.
Transnuclear Inc. 2009. Technical Specifications: TransNuclear Inc. Standardized NUHOMS Horizontal Modular Storage System Certificate of Compliance No. 1004, Amendment No. 10. 'RFNHW-1004, Columbia, Maryland. Accession No. ML092290186. 185(* September 2014
NRC FORM 335 U.S. NUCLEAR REGULATORY COMMISSION (12-2010)
MONTH YEAR September 2014 4. FIN OR GRANT NUMBER