{"document":{"doc_id":1258,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Final Regulatory Impact Analysis for the \"Amendments to Parts 192 and 195 to Require Valve Installation and Minimum Rupture Detection Standards\" final rule","date":"2022-04-08","url":"https://www.regulations.gov/document/PHMSA-2013-0255-0046","source_native_id":"PHMSA-2013-0255-0046","status":"fetched","abstract":null,"action":null},"dockets":["PHMSA-2013-0255"],"rins":["RIN 2137-AF06"],"related":[{"doc_id":1390,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Preliminary Regulatory Impact Analysis and Preliminary Environmental Assessment","date":"2020-02-06"},{"doc_id":7232,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Proposed Rule","title":"Pipeline Safety: Valve Installation and Minimum Rupture Detection Standards","date":"2020-02-06"},{"doc_id":128898,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Rupture Detection Valve NPRM OMB Redline","date":"2020-12-23"},{"doc_id":4963,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards","date":"2022-04-08"},{"doc_id":128546,"source":"docket_item","org":"PHMSA","doc_type":"review_record","title":"Redline comparison document for the final rule showing the changes made during the course of interagency review in accordance with E.O. 12866","date":"2022-04-08"},{"doc_id":1251,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder  RIA accident data","date":"2022-09-16"},{"doc_id":1253,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"Placeholder RIA incident data","date":"2022-09-16"},{"doc_id":1255,"source":"ria","org":"PHMSA","doc_type":"regulatory_impact_analysis","title":"ld cafe co2 nhtsa 2127 al76 epa pria 181016","date":"2022-09-16"},{"doc_id":4448,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Technical Corrections","date":"2023-08-01"},{"doc_id":407,"source":"fr_rule","org":"DEPARTMENT OF TRANSPORTATION; Pipeline and Hazardous Materials Safety Administration","doc_type":"Rule (administrative)","title":"Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standards: Response to Petition for Reconsideration; Additional Technical Corrections","date":"2024-06-28"}],"references":[{"citation_id":177731,"raw_reference":"NTSB, Accident Report PAR-11/01, \"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010\" (Aug. 30, 2011)","cited_authors":"National Transportation Safety Board","cited_year":"2011","cited_title":"Pacific Gas and Electric Company; Natural Gas Transmission Pipeline Rupture and Fire; San Bruno, CA; September 9, 2010","cited_venue":"NTSB Pipeline Accident Report PAR-11/01","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1101.pdf","ref_kind":"research_report","section":"fn 1","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177732,"raw_reference":"NTSB, Accident Report PAR-12/01, \"Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010\" (July 10, 2012)","cited_authors":"National Transportation Safety Board","cited_year":"2012","cited_title":"Enbridge Incorporated: Hazardous Liquid Pipeline Rupture and Release; Marshall, MI: July 25, 2010","cited_venue":"NTSB Pipeline Accident Report PAR-12/01","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1201.pdf","ref_kind":"research_report","section":"fn 2","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177733,"raw_reference":"Garret Ellison, \"New price tag for Kalamazoo River oil spill cleanup: Enbridge says $1.21 billion\". Grand Rapids Press, November 5, 2014","cited_authors":"Garret Ellison","cited_year":"2014","cited_title":"New price tag for Kalamazoo River oil spill cleanup: Enbridge says $1.21 billion","cited_venue":"Grand Rapids Press","cited_doi":null,"cited_url":"https://www.mlive.com/news/grandrapids/2014/11/2010_oil_spill_cost_enbridge_1.html","ref_kind":"news","section":"fn 3","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177734,"raw_reference":"NTSB, NTSB-PSS-71-1, \"Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown\" (1970)","cited_authors":"National Transportation Safety Board","cited_year":"1970","cited_title":"Special Study of Effects of Delay in Shutting Down Failed Pipeline Systems and Methods of Providing Rapid Shutdown","cited_venue":"NTSB-PSS-71-1","cited_doi":null,"cited_url":"https://app.ntsb.gov/doclib/reports/1971/PSS711.pdf","ref_kind":"research_report","section":"1.1. Background","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177735,"raw_reference":"NTSB, PAR-95-1, \"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey\" (1995)","cited_authors":"National Transportation Safety Board","cited_year":"1995","cited_title":"Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey","cited_venue":"NTSB PAR-95-1","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR9501.pdf","ref_kind":"research_report","section":"1.1. Background","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177736,"raw_reference":"Better Data and Guidance Needed to Improve Pipeline Operator Incident Response (GAO 2013)","cited_authors":"Government Accountability Office","cited_year":"2013","cited_title":"Pipeline Safety: Better Data and Guidance Needed to Improve Pipeline Operator Incident Response","cited_venue":"GAO-13-168","cited_doi":null,"cited_url":"https://www.gao.gov/assets/660/651408.pdf","ref_kind":"government_report","section":"1.1. Background","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177737,"raw_reference":"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines with Respect to Public and Environmental Safety (ORNL 2012)","cited_authors":"Oak Ridge National Laboratory","cited_year":"2012","cited_title":"Studies for the Requirements of Automatic and Remotely Controlled Shutoff Valves on Hazardous Liquids and Natural Gas Pipelines With Respect to Public and Environmental Safety","cited_venue":"ORNL/TM-2012/411","cited_doi":null,"cited_url":null,"ref_kind":"research_report","section":"1.1. Background","page":null,"context_sentence":null,"paper_id":273,"paper_title":"Studies for the requirements of automatic and remotely controlled shutoff valves on hazardous liquids and natural gas pipelines with respect to public and environmental safety","paper_year":2012,"paper_doi":"10.2172/1373899"},{"citation_id":177738,"raw_reference":"Kiefner and Associates, Inc., Report No. 12-173, \"Leak Detection Study – DTPH56-11-D-000001\" (Dec. 10, 2012)","cited_authors":"Kiefner and Associates, Inc.","cited_year":"2012","cited_title":"Leak Detection Study – DTPH56-11-D-000001","cited_venue":"Report No. 12-173","cited_doi":null,"cited_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/technical-resources/pipeline/16691/leak-detectionstudy.pdf","ref_kind":"research_report","section":"fn 18","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177739,"raw_reference":"Carey & Rogers, \"PG&E Officials Grilled About Automatic Shut Off Valves,\" Mercury News (March 1, 2011)","cited_authors":"Carey & Rogers","cited_year":"2011","cited_title":"PG&E Officials Grilled About Automatic Shut Off Valves","cited_venue":"Mercury News","cited_doi":null,"cited_url":"http://www.mercurynews.com/san-bruno-fire/ci_17510209?nclick_check=1","ref_kind":"news","section":"fn 25","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177740,"raw_reference":"IHS Economics, \"The Economic Impact of Crude Oil Pipeline Construction and Operation\" (2017)","cited_authors":"IHS Economics","cited_year":"2017","cited_title":"The Economic Impact of Crude Oil Pipeline Construction and Operation","cited_venue":"IHS Economics","cited_doi":null,"cited_url":"http://www.nam.org/Issues/Energy-and-Environment/Crude-Oil-Pipeline-Impact-Study.pdf","ref_kind":"research_report","section":"5.5. Summary of Costs","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177741,"raw_reference":"MacPherson, \"4 Years Later, Cleanup Nears End for Big North Dakota Spill\" StarTribune (Sept. 15, 2017)","cited_authors":"MacPherson","cited_year":"2017","cited_title":"4 Years Later, Cleanup Nears End for Big North Dakota Spill","cited_venue":"StarTribune","cited_doi":null,"cited_url":"http://www.startribune.com/4-years-later-cleanup-nears-end-for-big-north-dakota-spill/444714133/","ref_kind":"news","section":"4.3. Frequency and Consequences of Ruptures","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177742,"raw_reference":"ENSR Corporation, Pipeline Risk Assessment and Environmental Consequence Analysis, March 2007, Document No.: 10623-004","cited_authors":"ENSR Corporation","cited_year":"2007","cited_title":"Pipeline Risk Assessment and Environmental Consequence Analysis","cited_venue":"ENSR Corporation","cited_doi":null,"cited_url":"https://puc.sd.gov/commission/dockets/HydrocarbonPipeline/2007/HP07001/Disk/Exhibit%20C/5March07/RiskAssessment/3riskassessment033007.pdf","ref_kind":"research_report","section":"6.2. Hazardous Liquid Pipeline Ruptures","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177743,"raw_reference":"Litvak, \"Natural Gas Explosion Rocks Westmoreland County and U.S. Gas Markets,\" Pittsburgh Post-Gazette (May 1, 2016)","cited_authors":"Litvak","cited_year":"2016","cited_title":"Natural Gas Explosion Rocks Westmoreland County and U.S. Gas Markets","cited_venue":"Pittsburgh Post-Gazette","cited_doi":null,"cited_url":"http://www.post-gazette.com/local/westmoreland/2016/04/29/Emergency-crews-respond-to-gaswell-explosion-in-Westmoreland-County-pennsylvania/stories/201604290161","ref_kind":"news","section":"6.1.3. Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177744,"raw_reference":"NTSB, Accident Report NTSB/PAR-14/01, \"Columbia Gas Transmission Corporation Pipeline Rupture, Sissonville, West Virginia December 11, 2012\" (2014)","cited_authors":"National Transportation Safety Board","cited_year":"2014","cited_title":"Columbia Gas Transmission Corporation Pipeline Rupture, Sissonville, West Virginia December 11, 2012","cited_venue":"NTSB/PAR-14/01","cited_doi":null,"cited_url":"http://www.ntsb.gov/investigations/AccidentReports/Reports/PAR1401.pdf","ref_kind":"research_report","section":"6.1.3. Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177745,"raw_reference":"NTSB, Accident Report NTSB/PAR-03/01, \"Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000\" (2003)","cited_authors":"National Transportation Safety Board","cited_year":"2003","cited_title":"Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000","cited_venue":"NTSB/PAR-03/01","cited_doi":null,"cited_url":"https://www.ntsb.gov/investigations/AccidentReports/Reports/PAR0301.pdf","ref_kind":"research_report","section":"6.1.3. Summary","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177746,"raw_reference":"Federal Energy Regulatory Commission (FERC). 2018. Draft Environmental Impact Statement for Midship Pipeline Company, LLC – Midcontinent Supply Header Interstate Pipeline Project","cited_authors":"Federal Energy Regulatory Commission","cited_year":"2018","cited_title":"Draft Environmental Impact Statement for Midship Pipeline Company, LLC – Midcontinent Supply Header Interstate Pipeline Project","cited_venue":"FERC/DEIS-0277","cited_doi":null,"cited_url":"https://www.ferc.gov/industries/gas/enviro/eis/2018/02-09-18-DEIS/DEIS.pdf","ref_kind":"research_report","section":"4.4. Valve Automation","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null},{"citation_id":177747,"raw_reference":"U.S. Department of State. 2011. Final Environmental Impact Statement Keystone XL Project","cited_authors":"U.S. Department of State","cited_year":"2011","cited_title":"Final Environmental Impact Statement Keystone XL Project","cited_venue":"Bureau of Oceans and International Environmental and Scientific Affairs","cited_doi":null,"cited_url":"https://keystonepipeline-xl.state.gov/documents/organization/182013.pdf","ref_kind":"research_report","section":"4.4. Valve Automation","page":null,"context_sentence":null,"paper_id":null,"paper_title":null,"paper_year":null,"paper_doi":null}]}